A new method for the control of the speed of an ultrasonic motor and its implementation are proposed. The method is merely used by detecting the time when motor′s monitor signal reaches a non zero reference valu...A new method for the control of the speed of an ultrasonic motor and its implementation are proposed. The method is merely used by detecting the time when motor′s monitor signal reaches a non zero reference value than a zero one, the direction, in which the driving frequency of the motor should be shifted, can be promptly calculated. With the aid of a CPU and the phase locked frequency doubling technique, the motor can be steadily driven in a wide range of frequency and the optimum frequency can be captured rapidly and precisely. Experiment shows that the above method is available.展开更多
The threshold control of safety blasting vibration velocity is a significant process for the underground mining of complicated ore deposit under construction,road,and water.According to the equivalent principle of dis...The threshold control of safety blasting vibration velocity is a significant process for the underground mining of complicated ore deposit under construction,road,and water.According to the equivalent principle of displacement and velocity of mass point,differential evolution is put forward based on 3DEC dynamic analysis,making the calculation more efficient and accurate.The 3DEC model of the complicated orebody under railway is established according to the topographic maps and geological data of the eastern Pyrite Mine.The stimulus-response distribution of internal stress and displacement fields are demonstrated by analyzing the on-site monitoring vibration displacement and velocity data of the mass point.The reliability of parameter selection,such as blasting simulation waveforms,rock damping,is identified.The safety vibration velocity of railway is set to 4.5 cm/s in line with the requirement of safety blasting rules.Thus,the maximum amount of single-stage explosive in this region is 44.978 kg.The simulation result is in good agreement with the on-site monitoring datum.No displacement and settlement of the 701 railway special line was achieved by choosing the critical amount of the single-stage explosive.展开更多
文摘A new method for the control of the speed of an ultrasonic motor and its implementation are proposed. The method is merely used by detecting the time when motor′s monitor signal reaches a non zero reference value than a zero one, the direction, in which the driving frequency of the motor should be shifted, can be promptly calculated. With the aid of a CPU and the phase locked frequency doubling technique, the motor can be steadily driven in a wide range of frequency and the optimum frequency can be captured rapidly and precisely. Experiment shows that the above method is available.
基金Fund for New Teacher of the Doctoral Program of Higher Education(No. 200805611092)the Fundamental Research Funds for the Central Universities(No.2009zm0064)the Key Program of the National Natural Science Foundation of China(No.50934002) for its financial support
文摘The threshold control of safety blasting vibration velocity is a significant process for the underground mining of complicated ore deposit under construction,road,and water.According to the equivalent principle of displacement and velocity of mass point,differential evolution is put forward based on 3DEC dynamic analysis,making the calculation more efficient and accurate.The 3DEC model of the complicated orebody under railway is established according to the topographic maps and geological data of the eastern Pyrite Mine.The stimulus-response distribution of internal stress and displacement fields are demonstrated by analyzing the on-site monitoring vibration displacement and velocity data of the mass point.The reliability of parameter selection,such as blasting simulation waveforms,rock damping,is identified.The safety vibration velocity of railway is set to 4.5 cm/s in line with the requirement of safety blasting rules.Thus,the maximum amount of single-stage explosive in this region is 44.978 kg.The simulation result is in good agreement with the on-site monitoring datum.No displacement and settlement of the 701 railway special line was achieved by choosing the critical amount of the single-stage explosive.