期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
基于实时拓扑识别的分布式馈线自动化控制方法 被引量:59
1
作者 高孟友 徐丙垠 +1 位作者 范开俊 张新慧 《电力系统自动化》 EI CSCD 北大核心 2015年第9期127-131,共5页
现有分布式馈线自动化(FA)算法大都针对具体的馈线拓扑结构与联络开关位置设计,馈线运行方式改变时需要重新调整算法。通过检测开关两侧电压,可以识别联络开关的身份并自动调整控制算法,但要求每一个分段开关两侧都安装电压互感器。提... 现有分布式馈线自动化(FA)算法大都针对具体的馈线拓扑结构与联络开关位置设计,馈线运行方式改变时需要重新调整算法。通过检测开关两侧电压,可以识别联络开关的身份并自动调整控制算法,但要求每一个分段开关两侧都安装电压互感器。提出通过智能终端之间的接力查询,自动识别馈线实时拓扑结构与联络开关位置。相邻分段开关的智能终端间通过交换故障电流检测信息,定位并隔离故障区段;联络开关处的配电终端根据馈线实时拓扑结构计算备供电源容量裕度,从而最大范围恢复非故障区段供电。根据所提方法建立FA系统,静模试验及现场运行结果证明了该方法能够自动适应馈线拓扑结构变化,快速进行故障隔离与供电恢复控制。 展开更多
关键词 分布式馈线自动 馈线拓扑自动识别 接力查询 最大范围供电恢复
在线阅读 下载PDF
Research on Verification Method of Motor Startups in Nuclear Power Plants Based on Topology Recognition
2
作者 Li Baozhu Dong Weijie Chen Chao 《系统仿真学报》 CAS CSCD 北大核心 2024年第12期2813-2823,共11页
There are many motors in operation or on standby in nuclear power plants,and the startup of group motors will have a great impact on the voltage of the emergency bus.At present,there is no special or inexpensive softw... There are many motors in operation or on standby in nuclear power plants,and the startup of group motors will have a great impact on the voltage of the emergency bus.At present,there is no special or inexpensive software to solve this problem,and the experience of engineers is not accurate enough.Therefore,this paper developed a method and system for the startup calculation of group motors in nuclear power plants and proposed an automatic generation method of circuit topology in nuclear power plants.Each component in the topology was given its unique number,and the component class could be constructed according to its type and upper and lower connections.The subordination and topology relationship of switches,buses,and motors could be quickly generated by the program according to the component class,and the simplified direct power flow algorithm was used to calculate the power flow for the startup of group motors according to the above relationship.Then,whether the bus voltage is in the safe range and whether the voltage exceeds the limit during the startup of the group motor could be judged.The practical example was used to verify the effectiveness of the method.Compared with other professional software,the method has high efficiency and low cost. 展开更多
关键词 power supply for nuclear power plant automatic topology recognition startup of group motor simplified direct power flow algorithm verification method
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部