An improved limit equilibrium method for rock slope stability analysis under stress-based calculation mode for slip surface
1
作者 DENG Dong-ping ZHANG Dian +1 位作者 PENG Yi-hang CHEN Hao-yu 《Journal of Central South University》 2025年第1期262-287,共26页
This study proposes an alternative calculation mode for stresses on the slip surface(SS).The calculation of the normal stress(NS)on the SS involves examining its composition and expanding its unknown using the Taylor ... This study proposes an alternative calculation mode for stresses on the slip surface(SS).The calculation of the normal stress(NS)on the SS involves examining its composition and expanding its unknown using the Taylor series.This expansion enables the reasonable construction of a function describing the NS on the SS.Additionally,by directly incorporating the nonlinear Generalized Hoke-Brown(GHB)strength criterion and utilizing the slope factor of safety(FOS)definition,a function of the shear stress on the SS is derived.This function considers the mutual feedback mechanism between the NS and strength parameters of the SS.The stress constraints conditions are then introduced at both ends of the SS based on the spatial stress relation of one point.Determining the slope FOS and stress solution for the SS involves considering the mechanical equilibrium conditions and the stress constraint conditions satisfied by the sliding body.The proposed approach successfully simulates the tension-shear stress zone near the slope top and provides an intuitive description of the concentration effect of compression-shear stress of the SS near the slope toe.Furthermore,compared to other methods,the present method demonstrates superior processing capabilities for the embedded nonlinear GHB strength criterion. 展开更多
关键词 stability of rock slope nonlinear GHB strength criterion limit equilibrium method stress function on slip surface stress constraint conditions at both ends of slip surface
在线阅读 下载PDF
膨胀土渠坡处理有限元分析 被引量:1
2
作者 俞顺 杜莉莉 何芳婵 《人民黄河》 CAS 北大核心 2010年第1期124-125,共2页
针对南阳引丹灌区膨胀土渠道边坡的滑坡现象,采用掺入生石灰回填夯实原土,并安装玻璃钢锚杆加固和土工格栅加筋的方法处理该段滑坡,通过Mohr-Coulomb破坏准则,并运用强度折减法进行了加固后的分析,结果表明,采用土工格栅和锚杆可以提高... 针对南阳引丹灌区膨胀土渠道边坡的滑坡现象,采用掺入生石灰回填夯实原土,并安装玻璃钢锚杆加固和土工格栅加筋的方法处理该段滑坡,通过Mohr-Coulomb破坏准则,并运用强度折减法进行了加固后的分析,结果表明,采用土工格栅和锚杆可以提高边坡的安全系数,使边坡保持稳定。 展开更多
关键词 膨胀土 强度折减 应力平衡法 玻璃钢锚杆 土工格栅
在线阅读 下载PDF
含顺倾煤层软岩边坡滑动区稳定性分析与工程治理实践 被引量:16
3
作者 曹兰柱 王炎舜 +2 位作者 赵立春 王东 宋子岭 《矿业安全与环保》 北大核心 2018年第5期74-77,共4页
针对顺倾煤层软岩边坡滑动现状,结合GPS监测数据,研究了其滑动机理与工程治理措施。结果表明,软岩边坡滑动机理为滑体前缘剪出,滑体后缘产生张拉裂隙,中部主滑段切断岩层沿弱层产生切层—顺层滑动。运用SLOPE/W软件及监测数据进行了滑... 针对顺倾煤层软岩边坡滑动现状,结合GPS监测数据,研究了其滑动机理与工程治理措施。结果表明,软岩边坡滑动机理为滑体前缘剪出,滑体后缘产生张拉裂隙,中部主滑段切断岩层沿弱层产生切层—顺层滑动。运用SLOPE/W软件及监测数据进行了滑动区边坡工程治理前、后的稳定性评价,评价结果表明:治理前其滑动区边坡稳定系数为0.976、0.996,监测位移逐渐增大,说明其处于不稳定状态;实施工程治理措施后,达到了安全储备系数1.2的要求,监测位移趋于近水平,说明工程治理措施选择方法恰当,可为其他顺倾煤层软岩边坡滑动变形及治理措施选择提供指导。 展开更多
关键词 露天煤矿 顺倾煤层 软岩边坡 边坡稳定性 极限平衡与有限应力 GPS监测
在线阅读 下载PDF
Determination of initial cable force of cantilever casting concrete arch bridge using stress balance and influence matrix methods 被引量:11
4
作者 TIAN Zhong-chu PENG Wen-ping +2 位作者 ZHANG Jian-ren JIANG Tian-yong DENG Yang 《Journal of Central South University》 SCIE EI CAS CSCD 2019年第11期3140-3155,共16页
Cantilever casting concrete arch bridge using form traveller has a broad application prospect.However,it is difficult to obtain reasonable initial cable force in construction stage.In this study,stress balance and inf... Cantilever casting concrete arch bridge using form traveller has a broad application prospect.However,it is difficult to obtain reasonable initial cable force in construction stage.In this study,stress balance and influence matrix methods were developed to determine the initial cable force of cantilever casting concrete arch bridge.The stress balance equation and influence matrix of arch rib critical section were established,and the buckle cable force range was determined by the allowable stress of arch rib critical section.Then a group of buckle cable forces were selected and substituted into the stress balance equation,and the reasonable initial buckle cable force was determined through iteration.Based on the principle of force balance,the initial anchor cable force was determined.In an engineering application example,it is shown that the stress balance and influence matrix methods for the determination of initial cable force are feasible and reliable.The initial cable forces of arch rib segments only need to be adjusted once in the corresponding construction process,which improves the working efficiency and reduces the construction risk.It is found that the methods have great advantages for determining initial cable force in cantilever casting construction process of concrete arch bridge. 展开更多
关键词 concrete arch bridge cantilever casting initial cable force stress balance method influence matrix method
在线阅读 下载PDF
Limit equilibrium method for slope stability based on assumed stress on slip surface 被引量:2
5
作者 邓东平 赵炼恒 李亮 《Journal of Central South University》 SCIE EI CAS CSCD 2016年第11期2972-2983,共12页
In the limit equilibrium framework, two- and three-dimensional slope stabilities can be solved according to the overall force and moment equilibrium conditions of a sliding body. In this work, based on Mohr-Coulomb(M-... In the limit equilibrium framework, two- and three-dimensional slope stabilities can be solved according to the overall force and moment equilibrium conditions of a sliding body. In this work, based on Mohr-Coulomb(M-C) strength criterion and the initial normal stress without considering the inter-slice(or inter-column) forces, the normal and shear stresses on the slip surface are assumed using some dimensionless variables, and these variables have the same numbers with the force and moment equilibrium equations of a sliding body to establish easily the linear equation groups for solving them. After these variables are determined, the normal stresses, shear stresses, and slope safety factor are also obtained using the stresses assumptions and M-C strength criterion. In the case of a three-dimensional slope stability analysis, three calculation methods, namely, a non-strict method, quasi-strict method, and strict method, can be obtained by satisfying different force and moment equilibrium conditions. Results of the comparison in the classic two- and three-dimensional slope examples show that the slope safety factors calculated using the current method and the other limit equilibrium methods are approximately equal to each other, indicating the feasibility of the current method; further, the following conclusions are obtained: 1) The current method better amends the initial normal and shear stresses acting on the slip surface, and has the identical results with using simplified Bishop method, Spencer method, and Morgenstern-Price(M-P) method; however, the stress curve of the current method is smoother than that obtained using the three abovementioned methods. 2) The current method is suitable for analyzing the two- and three-dimensional slope stability. 3) In the three-dimensional asymmetric sliding body, the non-strict method yields safer solutions, and the results of the quasi-strict method are relatively reasonable and close to those of the strict method, indicating that the quasi-strict method can be used to obtain a reliable slope safety factor. 展开更多
关键词 two-dimensional slope three-dimensional slope limit equilibrium analysis normal stress shear stress safety factor
在线阅读 下载PDF