期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
基础沉降量对三鞍座卧式容器的影响 被引量:2
1
作者 王永兴 《化工设备与管道》 CAS 2000年第1期23-26,共4页
本文从理论上 ,将基础沉降量对三鞍座卧式容器中的支承反力与弯矩的影响进行尝试性公式推导。供参考。
关键词 基础沉降量 支承反力 剪力 弯矩 卧式容器
在线阅读 下载PDF
建筑物基础沉降径向基神经网络预测 被引量:6
2
作者 黄禄文 刘海卿 《辽宁工程技术大学学报(自然科学版)》 CAS 北大核心 2016年第8期836-840,共5页
为解决建筑物基础沉降量的安全监测问题,对其进行有效的预测、校核与分析,运用MATLAB软件建立径向基神经网络模型对某市建筑物的基础沉降量进行预测.结果表明:径向基神经网络的结构形式简易,适应能力更强,预测误差比BP网络小,平均约为66... 为解决建筑物基础沉降量的安全监测问题,对其进行有效的预测、校核与分析,运用MATLAB软件建立径向基神经网络模型对某市建筑物的基础沉降量进行预测.结果表明:径向基神经网络的结构形式简易,适应能力更强,预测误差比BP网络小,平均约为66.83%,达到预测精准度所需的耗时短、收敛速度更快.径向基神经网络的预测结果与实测结果较为吻合,表明径向基神经网络预测模型适用于建筑工程沉降预测领域之中. 展开更多
关键词 BP神经网络 径向基神经网络 模型预测 建筑物基础沉降量 安全监测 预测分析
在线阅读 下载PDF
Long-term settlement prediction of high-speed railway bridge pile foundation 被引量:4
3
作者 杨奇 冷伍明 +4 位作者 张升 聂如松 魏丽敏 赵春彦 刘维正 《Journal of Central South University》 SCIE EI CAS 2014年第6期2415-2424,共10页
The process and characteristics of loading on high-speed railway bridge pile foundation were firstly obtained by means of field research and analysis,and the corresponding loading function was presented.One-dimensiona... The process and characteristics of loading on high-speed railway bridge pile foundation were firstly obtained by means of field research and analysis,and the corresponding loading function was presented.One-dimensional consolidation equation of elastic multilayered soils was then established with single drainage or double drainages under multilevel loading.Moreover,the formulas for calculating effective stress and settlement were derived from the Laplace numerical inversion transform.The three-dimensional composite analysis method of bridge pile group was improved,where the actual load conditions of pile foundation could be simulated,and the consolidation characteristics of soil layers beneath pile were also taken into account.Eventually,a corresponding program named LTPGS was developed to improve the calculation efficiency.The comparison between long-term settlement obtained from the proposed method and the in-situ measurements of pile foundation was illustrated,and a close agreement is obtained.The error between computed and measured results is less than 1 mm,and it gradually reduces with time.It is shown that the proposed method can effectively simulate the long-term settlement of pile foundation and program LTPGS can provide a reliable estimation. 展开更多
关键词 bridge pile foundation long-term settlement CONSOLIDATION Laplace numerical inversion transform multilevel loading multilayered soils
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部