PCMC(Problem-originated Clinical Medical Curriculum)教学模式首创于1965年加拿大McMaster大学,PCMC教学模式以典型临床病例作为基础、以问题作为导向的启发式教学模式,作为一种培养创新性人才的重要教学方法。《兽医临床诊断学》...PCMC(Problem-originated Clinical Medical Curriculum)教学模式首创于1965年加拿大McMaster大学,PCMC教学模式以典型临床病例作为基础、以问题作为导向的启发式教学模式,作为一种培养创新性人才的重要教学方法。《兽医临床诊断学》是专业基础课程向临床专业课过渡的桥梁与纽带,是兽医临床学科的入门课,其实验教学要求具有更高的实践操作性。展开更多
The traffic equilibrium assignment problem under tradable credit scheme(TCS) in a bi-modal stochastic transportation network is investigated in this paper. To describe traveler’s risk-taking behaviors under uncertain...The traffic equilibrium assignment problem under tradable credit scheme(TCS) in a bi-modal stochastic transportation network is investigated in this paper. To describe traveler’s risk-taking behaviors under uncertainty, the cumulative prospect theory(CPT) is adopted. Travelers are assumed to choose the paths with the minimum perceived generalized path costs, consisting of time prospect value(PV) and monetary cost. At equilibrium with a given TCS, the endogenous reference points and credit price remain constant, and are consistent with the equilibrium flow pattern and the corresponding travel time distributions of road sub-network. To describe such an equilibrium state, the CPT-based stochastic user equilibrium(SUE) conditions can be formulated under TCS. An equivalent variational inequality(VI) model embedding a parameterized fixed point(FP) model is then established, with its properties analyzed theoretically. A heuristic solution algorithm is developed to solve the model, which contains two-layer iterations. The outer iteration is a bisection-based contraction method to find the equilibrium credit price, and the inner iteration is essentially the method of successive averages(MSA) to determine the corresponding CPT-based SUE network flow pattern. Numerical experiments are provided to validate the model and algorithm.展开更多
The objective of this work was to determine the location of emergency material warehouses. For the site selection problem of emergency material warehouses, the triangular fuzzy numbers are respectively demand of the d...The objective of this work was to determine the location of emergency material warehouses. For the site selection problem of emergency material warehouses, the triangular fuzzy numbers are respectively demand of the demand node, the distance between the warehouse and demand node and the cost of the warehouse, a bi-objective programming model was established with minimum total cost of the system and minimum distance between the selected emergency material warehouses and the demand node. Using the theories of fuzzy numbers, the fuzzy programming model was transformed into a determinate bi-objective mixed integer programming model and a heuristic algorithm for this model was designed. Then, the algorithm was proven to be feasible and effective through a numerical example. Analysis results show that the location of emergency material warehouse depends heavily on the values of degree a and weight wl. Accurate information of a certain emergency activity should be collected before making the decision.展开更多
In distribution systems,network reconfiguration and capacitor placement are commonly used to diminish power losses and keep voltage profiles within acceptable limits.Moreover,the problem of DG allocation and sizing is...In distribution systems,network reconfiguration and capacitor placement are commonly used to diminish power losses and keep voltage profiles within acceptable limits.Moreover,the problem of DG allocation and sizing is great important.In this work,a combination of a fuzzy multi-objective approach and bacterial foraging optimization(BFO) as a meta-heuristic algorithm is used to solve the simultaneous reconfiguration and optimal sizing of DGs and shunt capacitors in a distribution system.Each objective is transferred into fuzzy domain using its membership function.Then,the overall fuzzy satisfaction function is formed and considered a fitness function inasmuch as the value of this function has to be maximized to gain the optimal solution.The numerical results show that the presented algorithm improves the performance much more than other meta-heuristic algorithms.Simulation results found that simultaneous reconfiguration with DG and shunt capacitors allocation(case 5) has 77.41%,42.15%,and 56.14%improvements in power loss reduction,load balancing,and voltage profile indices,respectively in 33-bus test system.This result found 87.27%,35.82%,and 54.34%improvements of mentioned indices respectively for 69-bus system.展开更多
The problem of sequential fault diagnosis is to construct a diagnosis tree that can isolate the failure sources with minimal test cost. Pervious sequential fault diagnosis strategy generating algorithms only consider ...The problem of sequential fault diagnosis is to construct a diagnosis tree that can isolate the failure sources with minimal test cost. Pervious sequential fault diagnosis strategy generating algorithms only consider the execution cost at application stage, which may result in a solution with poor quality from the view of life cycle cost. Furthermore, due to the fact that uncertain information exists extensively in the real-world systems, the tests are always imperfect. In order to reduce the cost of fault diagnosis in the realistic systems, the sequential fault diagnosis problem with imperfect tests considering life cycle cost is presented and formulated in this work, which is an intractable NP-hard AND/OR decision tree construction problem. An algorithm based on AND/OR graph search is proposed to solve this problem. Heuristic search based on information theory is applied to generate the sub-tree in the algorithm. Some practical issues such as the method to improve the computational efficiency and the diagnosis strategy with multi-outcome tests are discussed. The algorithm is tested and compared with previous algorithms on the simulated systems with different scales and uncertainty. Application on a wheel momentum system of a spacecraft is studied in detail. Both the simulation and application results suggest that the cost of the diagnosis strategy can be reduced significantly by using the proposed algorithm, especially when the placement cost of the tests constitutes a large part of the total cost.展开更多
文摘PCMC(Problem-originated Clinical Medical Curriculum)教学模式首创于1965年加拿大McMaster大学,PCMC教学模式以典型临床病例作为基础、以问题作为导向的启发式教学模式,作为一种培养创新性人才的重要教学方法。《兽医临床诊断学》是专业基础课程向临床专业课过渡的桥梁与纽带,是兽医临床学科的入门课,其实验教学要求具有更高的实践操作性。
基金Project(BX20180268)supported by National Postdoctoral Program for Innovative Talent,ChinaProject(300102228101)supported by Fundamental Research Funds for the Central Universities of China+1 种基金Project(51578150)supported by the National Natural Science Foundation of ChinaProject(18YJCZH130)supported by the Humanities and Social Science Project of Chinese Ministry of Education
文摘The traffic equilibrium assignment problem under tradable credit scheme(TCS) in a bi-modal stochastic transportation network is investigated in this paper. To describe traveler’s risk-taking behaviors under uncertainty, the cumulative prospect theory(CPT) is adopted. Travelers are assumed to choose the paths with the minimum perceived generalized path costs, consisting of time prospect value(PV) and monetary cost. At equilibrium with a given TCS, the endogenous reference points and credit price remain constant, and are consistent with the equilibrium flow pattern and the corresponding travel time distributions of road sub-network. To describe such an equilibrium state, the CPT-based stochastic user equilibrium(SUE) conditions can be formulated under TCS. An equivalent variational inequality(VI) model embedding a parameterized fixed point(FP) model is then established, with its properties analyzed theoretically. A heuristic solution algorithm is developed to solve the model, which contains two-layer iterations. The outer iteration is a bisection-based contraction method to find the equilibrium credit price, and the inner iteration is essentially the method of successive averages(MSA) to determine the corresponding CPT-based SUE network flow pattern. Numerical experiments are provided to validate the model and algorithm.
基金Project(71071162)supported by the National Natural Science Foundation of China
文摘The objective of this work was to determine the location of emergency material warehouses. For the site selection problem of emergency material warehouses, the triangular fuzzy numbers are respectively demand of the demand node, the distance between the warehouse and demand node and the cost of the warehouse, a bi-objective programming model was established with minimum total cost of the system and minimum distance between the selected emergency material warehouses and the demand node. Using the theories of fuzzy numbers, the fuzzy programming model was transformed into a determinate bi-objective mixed integer programming model and a heuristic algorithm for this model was designed. Then, the algorithm was proven to be feasible and effective through a numerical example. Analysis results show that the location of emergency material warehouse depends heavily on the values of degree a and weight wl. Accurate information of a certain emergency activity should be collected before making the decision.
文摘In distribution systems,network reconfiguration and capacitor placement are commonly used to diminish power losses and keep voltage profiles within acceptable limits.Moreover,the problem of DG allocation and sizing is great important.In this work,a combination of a fuzzy multi-objective approach and bacterial foraging optimization(BFO) as a meta-heuristic algorithm is used to solve the simultaneous reconfiguration and optimal sizing of DGs and shunt capacitors in a distribution system.Each objective is transferred into fuzzy domain using its membership function.Then,the overall fuzzy satisfaction function is formed and considered a fitness function inasmuch as the value of this function has to be maximized to gain the optimal solution.The numerical results show that the presented algorithm improves the performance much more than other meta-heuristic algorithms.Simulation results found that simultaneous reconfiguration with DG and shunt capacitors allocation(case 5) has 77.41%,42.15%,and 56.14%improvements in power loss reduction,load balancing,and voltage profile indices,respectively in 33-bus test system.This result found 87.27%,35.82%,and 54.34%improvements of mentioned indices respectively for 69-bus system.
基金Project(C1320063131)supported by China Civil Space Foundation
文摘The problem of sequential fault diagnosis is to construct a diagnosis tree that can isolate the failure sources with minimal test cost. Pervious sequential fault diagnosis strategy generating algorithms only consider the execution cost at application stage, which may result in a solution with poor quality from the view of life cycle cost. Furthermore, due to the fact that uncertain information exists extensively in the real-world systems, the tests are always imperfect. In order to reduce the cost of fault diagnosis in the realistic systems, the sequential fault diagnosis problem with imperfect tests considering life cycle cost is presented and formulated in this work, which is an intractable NP-hard AND/OR decision tree construction problem. An algorithm based on AND/OR graph search is proposed to solve this problem. Heuristic search based on information theory is applied to generate the sub-tree in the algorithm. Some practical issues such as the method to improve the computational efficiency and the diagnosis strategy with multi-outcome tests are discussed. The algorithm is tested and compared with previous algorithms on the simulated systems with different scales and uncertainty. Application on a wheel momentum system of a spacecraft is studied in detail. Both the simulation and application results suggest that the cost of the diagnosis strategy can be reduced significantly by using the proposed algorithm, especially when the placement cost of the tests constitutes a large part of the total cost.