期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
含水率波动状态下公明公路路基土劣化微观机理与本构模型 被引量:2
1
作者 李立宇 陈远中 徐思远 《河海大学学报(自然科学版)》 CAS CSCD 北大核心 2023年第3期114-120,共7页
通过固结排水三轴剪切试验、压汞试验和电镜扫描试验探究含水率波动对公明公路路基土力学特性的影响与其劣化微观机理,基于邓肯-张模型提出了一个能够考虑含水率波动影响的路基土经验本构模型。结果表明:含水率波动使得路基土中、大孔... 通过固结排水三轴剪切试验、压汞试验和电镜扫描试验探究含水率波动对公明公路路基土力学特性的影响与其劣化微观机理,基于邓肯-张模型提出了一个能够考虑含水率波动影响的路基土经验本构模型。结果表明:含水率波动使得路基土中、大孔隙增多,同时微裂隙得到发展引起试样结构被分割,导致试样剪切应力-应变关系从应变软化向应变硬化型转变,试样剪缩特性提升、剪切强度降低;含水率波动程度越大,试样剪缩特性越明显,剪切强度则越弱;提出的路基土本构模型的计算结果与试验结果吻合较好,证明了模型的有效性和适用性。 展开更多
关键词 路基土 含水波动 劣化机理 力学特性 微观结构 本构模型 公明公路
在线阅读 下载PDF
质量流量计在油田矿场计量中的应用 被引量:3
2
作者 龚云涛 龚中伟 《石油工业技术监督》 2022年第6期28-30,共3页
科里奥利质量流量计常用于原油分区计量中,分析了因装卸油站油水密度差异导致的含水率波动,以及水型不配伍导致的结垢,安装不规范导致的应力改变等问题对流量计的影响。通过采取药剂选型实验、规范选型和严格施工督查等措施,提高了应用... 科里奥利质量流量计常用于原油分区计量中,分析了因装卸油站油水密度差异导致的含水率波动,以及水型不配伍导致的结垢,安装不规范导致的应力改变等问题对流量计的影响。通过采取药剂选型实验、规范选型和严格施工督查等措施,提高了应用效果和计量准确度。 展开更多
关键词 质量流量计 原油计量 含水波动 结垢 应变压力
在线阅读 下载PDF
Pore pressure fluctuations of overlying aquifer during residual coal mining and water-soil stress coupling analysis 被引量:1
3
作者 DONG Qing-hong SUI Wang-hua +1 位作者 ZHANG Xiao-cui MAO Zeng-min 《Mining Science and Technology》 EI CAS 2009年第5期648-652,共5页
Three test models and a simulation model were constructed based on the prevailing conditions of the Taiping coalmine in order to analyze pore pressure fluctuations of an overlying aquifer during residual coal mining. ... Three test models and a simulation model were constructed based on the prevailing conditions of the Taiping coalmine in order to analyze pore pressure fluctuations of an overlying aquifer during residual coal mining. As well, the relation between pore pressure and soil stress was evaluated. The model tests show the vibrations of pore pressure and soil stress as a result of mining activities. The simulation model tells of the response characteristics of pore pressure after mining and its distribution in the sand aquifer. The comparative analysis reveals that pore pressure and soil stress vibration are activated by unexpected events occurring in mines, such as collapsing roofs. An increased pore pressure zone always lies above the wall in front or behind the working face of a mine. Both pore pressure and vertical stress result in increasing and decreasing processes during movements of the working face of a mine. The vibration of pore pressure always precedes soil stress in the same area and ends with a sharp decline. Changes in pore pressure of sand aquifer are limited to the area of stress changes. Obvious changes are largely located in a very small frame over the mining face. 展开更多
关键词 pore pressure fluctuations water-soil stress coupling analysis residual coal mining
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部