In order to accommodate higher speeds,heavier axle weights,and vibration damping criteria,a new floating slab structure was proposed.The new type of floating slab track structure was composed of three prefabricated fl...In order to accommodate higher speeds,heavier axle weights,and vibration damping criteria,a new floating slab structure was proposed.The new type of floating slab track structure was composed of three prefabricated floating slabs longitudinally interconnected with magnesium ammonium phosphate concrete(MPC).This study investigated the dynamic performance of the structure.We constructd a full-scale indoor experimental model to scrutinize the disparities in the impact performance between a longitudinally connected floating slab track and its longitudinally disconnected counterpart.Additionally,a long-term fatigue experiment was conducted to assess the impact performance of longitudinally connected floating slab tracks under fatigue loading.The findings are described in the following.1)The new structure effectively suppresses ground vibrations,exhibiting a well-balanced energy distribution profile.However,the imposition of fatigue loading leads to a reduction in the damping performance of the steel spring damping system,thereby reducing its capacity to attenuate structural vibrations and leading to an increase in ground vibration energy;2)After 107 loading cycles,the attenuation rate of the vibration acceleration for the MPC increases by 171.9%.Conversely,at the corresponding disconnected location,the attenuation rate of ground vibration acceleration decreases by 65.6%.In conclusion,longitudinally connected floating slab tracks exhibit superior vibration reduction performance.While the vibration reduction performance of longitudinally connected floating slab tracks may diminish to some extent during long-term service,these tracks continue to meet specific vibration reduction requirements.展开更多
To evaluate the effect of treating long cracks with the impact crack-closure retrofit(ICR)technique,three rib-to-deck welded specimens with a crack length of about 100 mm were tested.The metallographic structure,crack...To evaluate the effect of treating long cracks with the impact crack-closure retrofit(ICR)technique,three rib-to-deck welded specimens with a crack length of about 100 mm were tested.The metallographic structure,crack section,crack propagation life,and stress variation were analyzed.Finite-element models were also developed,and some optimal values of certain parameters are suggested according to the simulated results.The results show that new crack sources are generated on both sides of the ICR-treated region because of the stress distribution.The fatigue lives of cracked specimens with long cracks are significantly improved by the technique.Considerable residual compressive stress is also induced,and so it is suggested that the optimal impact angle to be applied to real bridges should be 70°.The stress at the weld root is distributed uniformly with the crack closed,and the optimal crack-closure depth is 4 mm.To evaluate the effect of different crack-closure depths in tests,it is recommended that a hot-spot stress method which is extrapolated by three reference points should be adopted.展开更多
基金Project(2022-Major-14)supported by the Science and Technology Research and Development Program Project of China Railway Group Limited。
文摘In order to accommodate higher speeds,heavier axle weights,and vibration damping criteria,a new floating slab structure was proposed.The new type of floating slab track structure was composed of three prefabricated floating slabs longitudinally interconnected with magnesium ammonium phosphate concrete(MPC).This study investigated the dynamic performance of the structure.We constructd a full-scale indoor experimental model to scrutinize the disparities in the impact performance between a longitudinally connected floating slab track and its longitudinally disconnected counterpart.Additionally,a long-term fatigue experiment was conducted to assess the impact performance of longitudinally connected floating slab tracks under fatigue loading.The findings are described in the following.1)The new structure effectively suppresses ground vibrations,exhibiting a well-balanced energy distribution profile.However,the imposition of fatigue loading leads to a reduction in the damping performance of the steel spring damping system,thereby reducing its capacity to attenuate structural vibrations and leading to an increase in ground vibration energy;2)After 107 loading cycles,the attenuation rate of the vibration acceleration for the MPC increases by 171.9%.Conversely,at the corresponding disconnected location,the attenuation rate of ground vibration acceleration decreases by 65.6%.In conclusion,longitudinally connected floating slab tracks exhibit superior vibration reduction performance.While the vibration reduction performance of longitudinally connected floating slab tracks may diminish to some extent during long-term service,these tracks continue to meet specific vibration reduction requirements.
基金Projects(51478163,51678216)supported by the National Natural Science Foundation of ChinaProject(2017Y09)supported by the Transport Science Research Project of Jiangsu Province,China
文摘To evaluate the effect of treating long cracks with the impact crack-closure retrofit(ICR)technique,three rib-to-deck welded specimens with a crack length of about 100 mm were tested.The metallographic structure,crack section,crack propagation life,and stress variation were analyzed.Finite-element models were also developed,and some optimal values of certain parameters are suggested according to the simulated results.The results show that new crack sources are generated on both sides of the ICR-treated region because of the stress distribution.The fatigue lives of cracked specimens with long cracks are significantly improved by the technique.Considerable residual compressive stress is also induced,and so it is suggested that the optimal impact angle to be applied to real bridges should be 70°.The stress at the weld root is distributed uniformly with the crack closed,and the optimal crack-closure depth is 4 mm.To evaluate the effect of different crack-closure depths in tests,it is recommended that a hot-spot stress method which is extrapolated by three reference points should be adopted.