针对月壤钻取采样过程中存在大颗粒岩块情况进行三维离散元动态仿真分析。建立考虑扭转、弯曲力矩及等效引力作用的新型三维离散元月壤模型,通过三轴仿真试验进行细观参数标定,得到黏聚力为0.90 k Pa,内摩擦角为42.25°的满足真实...针对月壤钻取采样过程中存在大颗粒岩块情况进行三维离散元动态仿真分析。建立考虑扭转、弯曲力矩及等效引力作用的新型三维离散元月壤模型,通过三轴仿真试验进行细观参数标定,得到黏聚力为0.90 k Pa,内摩擦角为42.25°的满足真实月壤宏观力学指标的仿真模型。针对月壤内层存在大颗粒情况设计4种采样工况分别进行仿真分析,监测大颗粒运动轨迹与采样效率,发现了"旋入效应"、"纵向运移效应"与"阻塞效应",仿真结果表明岩块粒径大小直接影响采样结果:当岩块粒径小于钻头"虚拟切削圆"时,其无论存在于任何位置对采样效率与后续样品缠绕收集均无明显影响;当岩块粒径大于"虚拟切削圆"时,阻塞现象严重,样品收集困难,极易导致采样失败。研究结论对月壤钻取采样控制设计与钻具结构设计具有重要的工程参考价值。展开更多
Method of testing for dynamic output forces from jet elements is studied, the handwidth is large in testing with this method. By establishing a model of the test system and simulating it, principles of how inherent fe...Method of testing for dynamic output forces from jet elements is studied, the handwidth is large in testing with this method. By establishing a model of the test system and simulating it, principles of how inherent features of the test system affect the dynamic force test are found out. Thus a theoretical foundation is given for the design and error modification to the actual test system.展开更多
Being aimed at the vital decisive problems to be solved during.making long-term planning and overall planning of the development of coal mining areas of China, this paper presents comprehensive theories and methods fo...Being aimed at the vital decisive problems to be solved during.making long-term planning and overall planning of the development of coal mining areas of China, this paper presents comprehensive theories and methods for the choice of mining area optimum planning schemes by use of combining technic analysis with system simulation and system optimization.The main contents are as follows: the prediction of technic and economic indexes in the developing process of existing mining areas and new mining area, including computer simulation analysis of maximum possibility of output growth in a working mine, the effect of technic progress on productive development, and grey predictive model of the change of technic and economic indexes; the dynamic simulation model of the mining area system, including five subsystem models; mining area output, investment, economic benefit, number of workers and staff of a mining area, mining area population, and ecologic environmental dynamic change under different schemes;the 0--1 programming, the goal programming and the analytic hierarchy process for contrast analysis optimization of mining area planning schemes.展开更多
文摘针对月壤钻取采样过程中存在大颗粒岩块情况进行三维离散元动态仿真分析。建立考虑扭转、弯曲力矩及等效引力作用的新型三维离散元月壤模型,通过三轴仿真试验进行细观参数标定,得到黏聚力为0.90 k Pa,内摩擦角为42.25°的满足真实月壤宏观力学指标的仿真模型。针对月壤内层存在大颗粒情况设计4种采样工况分别进行仿真分析,监测大颗粒运动轨迹与采样效率,发现了"旋入效应"、"纵向运移效应"与"阻塞效应",仿真结果表明岩块粒径大小直接影响采样结果:当岩块粒径小于钻头"虚拟切削圆"时,其无论存在于任何位置对采样效率与后续样品缠绕收集均无明显影响;当岩块粒径大于"虚拟切削圆"时,阻塞现象严重,样品收集困难,极易导致采样失败。研究结论对月壤钻取采样控制设计与钻具结构设计具有重要的工程参考价值。
文摘Method of testing for dynamic output forces from jet elements is studied, the handwidth is large in testing with this method. By establishing a model of the test system and simulating it, principles of how inherent features of the test system affect the dynamic force test are found out. Thus a theoretical foundation is given for the design and error modification to the actual test system.
文摘Being aimed at the vital decisive problems to be solved during.making long-term planning and overall planning of the development of coal mining areas of China, this paper presents comprehensive theories and methods for the choice of mining area optimum planning schemes by use of combining technic analysis with system simulation and system optimization.The main contents are as follows: the prediction of technic and economic indexes in the developing process of existing mining areas and new mining area, including computer simulation analysis of maximum possibility of output growth in a working mine, the effect of technic progress on productive development, and grey predictive model of the change of technic and economic indexes; the dynamic simulation model of the mining area system, including five subsystem models; mining area output, investment, economic benefit, number of workers and staff of a mining area, mining area population, and ecologic environmental dynamic change under different schemes;the 0--1 programming, the goal programming and the analytic hierarchy process for contrast analysis optimization of mining area planning schemes.