期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
高速铁路简支梁桥纵向力计算分析 被引量:2
1
作者 卜一之 张进 《桥梁建设》 EI CSCD 北大核心 1996年第2期53-56,共4页
利用桥梁—道碴—轨道的统一模型,对桥梁温度伸缩、桥梁挠曲作用以及制动力作用下的桥轨受力关系进行了分析。
关键词 高速铁路简支梁桥 纵向力计算 温度伸缩 挠曲作用 制动力作用 受力关系
全文增补中
Dynamic performance of heavy-haul combined train applying emergency braking on straight line 被引量:6
2
作者 刘鹏飞 王开云 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第8期1898-1908,共11页
A heavy-haul train-track coupled model is developed. Taking the emergency braking of the 2×104 t combined train as example, the train longitudinal impulse, the coupler dynamic behaviors and wheel-rail interaction... A heavy-haul train-track coupled model is developed. Taking the emergency braking of the 2×104 t combined train as example, the train longitudinal impulse, the coupler dynamic behaviors and wheel-rail interactions of vehicles distributing in the different positions are analyzed. The results indicate that under the coupler compressing forces, the couplers of middle locomotives may tilt to the free swing limits, which induces the unidirectional tilt of their connected wagon couplers. Consequently, the coupler longitudinal forces produce the lateral components, and then affect the wheel-rail dynamic interaction. The performance of the middle locomotive and their neighboring freight wagons deteriorate significantly, becoming the most dangerous parts in the combined train. The wagons disconnecting with the locomotives can basically keep their couplers to stabilize in the centering positions, even though the maximum coupler longitudinal force acts on it. And its corresponding running safety also has little changes. 展开更多
关键词 heavy-haul train longitudinal impulse vehicle–track coupled dynamics emergency braking
在线阅读 下载PDF
Beam-track interaction of high-speed railway bridge with ballast track 被引量:18
3
作者 闫斌 戴公连 张华平 《Journal of Central South University》 SCIE EI CAS 2012年第5期1447-1453,共7页
Based on the construction bridge of Xiamen-Shenzhen high-speed railway(9-32 m simply-supported beam + 6×32 m continuous beam),the pier-beam-track finite element model,where the continuous beam of the ballast trac... Based on the construction bridge of Xiamen-Shenzhen high-speed railway(9-32 m simply-supported beam + 6×32 m continuous beam),the pier-beam-track finite element model,where the continuous beam of the ballast track and simply-supported beam are combined with each other,was established.The laws of the track stress,the pier longitudinal stress and the beam-track relative displacement were analyzed.The results show that reducing the longitudinal resistance can effectively reduce the track stress and the pier stress of the continuous beam,and increase the beam-track relative displacement.Increasing the rigid pier stiffness of continuous beam can reduce the track braking stress,increase the pier longitudinal stress and reduce the beam-track relative displacement,Increasing the rigid pier stiffness of simply-supported beam can reduce the track braking stress,the rigid pier longitudinal stress and the beam-track relative displacement. 展开更多
关键词 high-speed railway beam-track interaction ballast track rail longitudinal force continuous beam
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部