This article describes the investigation of hazardous waste (HW) in the Three Gorges Area of Chongqing region, which indicates that by May 2002, the dumped HW therein amounted to 14 600 t and was mainly distributed in...This article describes the investigation of hazardous waste (HW) in the Three Gorges Area of Chongqing region, which indicates that by May 2002, the dumped HW therein amounted to 14 600 t and was mainly distributed in five districts and counties with 11 000 t in Fuling, 1 650 t in Fengdu, 950 t in Wanzhou; 630 t in Wushan and 430 t in Yunyang. The total amount was composed of 9 670 t chromic residue, 2 310 t waste oil and residue, 410 t waste (false) fertilizer, 28 t waste chemical medicine, 26 t waste materials and 2 200 t other things including acid residue, waste asbestos, fluorine silicate, pigment, additive, waste acid, alkali, nitric acid, vitriol, lead mud, storage battery, calcium carbide, potassium cyanide, polluted soil, discard dynamite, waste packing barrel of cyanides, etc. In all of the HW, 578 t can be treated by chemical neutralization and stabilization technology such as redox, chemical precipitation, acid and alkali neutralization, etc., and the rest is temporarily untreatble and should be removed and piled at a temporary storage site above the 177 m water level of the dam with an aim to be transported to a future disposal site for innocuous treatment.展开更多
文摘This article describes the investigation of hazardous waste (HW) in the Three Gorges Area of Chongqing region, which indicates that by May 2002, the dumped HW therein amounted to 14 600 t and was mainly distributed in five districts and counties with 11 000 t in Fuling, 1 650 t in Fengdu, 950 t in Wanzhou; 630 t in Wushan and 430 t in Yunyang. The total amount was composed of 9 670 t chromic residue, 2 310 t waste oil and residue, 410 t waste (false) fertilizer, 28 t waste chemical medicine, 26 t waste materials and 2 200 t other things including acid residue, waste asbestos, fluorine silicate, pigment, additive, waste acid, alkali, nitric acid, vitriol, lead mud, storage battery, calcium carbide, potassium cyanide, polluted soil, discard dynamite, waste packing barrel of cyanides, etc. In all of the HW, 578 t can be treated by chemical neutralization and stabilization technology such as redox, chemical precipitation, acid and alkali neutralization, etc., and the rest is temporarily untreatble and should be removed and piled at a temporary storage site above the 177 m water level of the dam with an aim to be transported to a future disposal site for innocuous treatment.