期刊文献+
共找到6篇文章
< 1 >
每页显示 20 50 100
Preparation and photocatalytic performance of Cs_(x)WO_(3)/TiO_(2)based on full spectral response
1
作者 LIU Zhangyong XU Lihui +8 位作者 YANG Yue WANG Liming PAN Hong HUANG Xinzhe FU Xueqiang ZHANG Yingxiu DOU Meiran WANG Meng TENG Yi 《无机化学学报》 北大核心 2025年第7期1445-1464,共20页
Cs_(x)WO_(3)/TiO_(2) composites with full-spectrum catalytic activity were prepared by solvothermal reaction.The composites were characterized using X-ray diffraction(XRD)analysis,scanning electron microscopy(SEM),tra... Cs_(x)WO_(3)/TiO_(2) composites with full-spectrum catalytic activity were prepared by solvothermal reaction.The composites were characterized using X-ray diffraction(XRD)analysis,scanning electron microscopy(SEM),transmission electron microscopy(TEM),specific surface area testing,X-ray photoelectron spectroscopy(XPS),and UV-Vis diffuse reflectance spectra(UV-Vis DRS).Cs_(x)WO_(3) and TiO_(2) were uniformly bonded together in the compos-ites.The heterojunction structure was formed.The band gap was reduced from 2.75 to 2.65 eV.The photocatalytic property of Cs_(x)WO_(3)/TiO_(2)was demonstrated by the degradation rates of 20 mg·L^(-1) methylene blue dye,which were 99.7%,91.4%,and 70.7%under irradiation from a 300 W high-pressure mercury lamp,a 500 W xenon lamp,and a 400 W infrared lamp,respectively.After five cycles of photocatalytic degradation,the composite photocatalyst still showed a degradation efficiency of 87.6%.This indicates that Cs_(x)WO_(3)/TiO_(2) has good photocatalytic degradability and cyclic stability.The photocatalytic mechanism of Cs_(x)WO_(3)/TiO_(2)was investigated.The trapping experiments of the active species showed that the main active substances were the empty hole(h+)and hydroxyl radical(·OH). 展开更多
关键词 CsxWO3-based solvothermal method full spectrum composite material photocatalytic activity
在线阅读 下载PDF
长白落叶松人工林年轮宽度对气候变化的响应 被引量:1
2
作者 郭新月 王文彬 董灵波 《森林工程》 北大核心 2024年第1期64-73,共10页
为揭示长白落叶松(Larix olgensis)人工林早材、晚材和全材年轮宽度对气候的响应程度,以东北林业大学帽儿山实验林场27块样地的135株样木树芯为数据源,在建立树木年轮年表的基础上,采用相关性分析量化其早材、晚材和全材年轮宽度与气候... 为揭示长白落叶松(Larix olgensis)人工林早材、晚材和全材年轮宽度对气候的响应程度,以东北林业大学帽儿山实验林场27块样地的135株样木树芯为数据源,在建立树木年轮年表的基础上,采用相关性分析量化其早材、晚材和全材年轮宽度与气候要素的关系。结果表明,长白落叶松年轮宽度在时间尺度上可划分为2个明显不同的时间段,其中1974—1985年树木生长主要受春秋两季的温度影响,而1986—2019年则主要受夏季温度的影响。在1974—1985年,冬春季的最高温度和最低温度,特别是上一年和当年的1月和2月以及4月和5月与早材和全材年轮宽度的影响呈负相关的(P<0.05),与晚材年轮宽度的影响呈正相关(P<0.05);上一年和当年春季4、5月的无霜期与早材年轮宽度的影响呈负相关(P<0.05)。在1986—2019年,夏季尤其是上一年和当年6、7月的最高温度以及最低温度与晚材年轮宽度有显著的正相关性(P<0.05);夏季上一年和当年7月的平均温度与晚材年轮宽度的生长有显著的正相关性(P<0.05),但与早材和全材年轮宽度有显著的负相关性(P<0.05)。整体来看,生长季的温度尤其是最低温度和平均温度是限制长白落叶松人工林早材和晚材生长的主要因素,而降水对早材和晚材生长的影响则不显著。 展开更多
关键词 早材 晚材 全材 气候 年轮宽度 长白落叶松
在线阅读 下载PDF
木材标准中有关术语的解析
3
作者 于惠铭 杨光 《森林工程》 北大核心 2002年第5期15-15,17,共2页
本文对木材标准中树种、检尺长、检尺径、检尺长范围内 (外 )、全材长术语进行了明确阐述 ,意在消除矛盾与纠纷 ,使木材标准化工作有效、顺利的开展。
关键词 木材标准 术语 树种 检尺长 全材
在线阅读 下载PDF
Antibiotic properties of Al_2O_3 doping silver 被引量:1
4
作者 张海斌 柳清菊 +2 位作者 朱忠其 张瑾 吴兴惠 《Journal of Central South University of Technology》 2005年第3期263-265,共3页
The preparation technique and properties of Ag-type inorganic antibiotic material carried by Al2O3 were studied. The results show that the material has good antibiotic and safety properties, the acute toxicity taken b... The preparation technique and properties of Ag-type inorganic antibiotic material carried by Al2O3 were studied. The results show that the material has good antibiotic and safety properties, the acute toxicity taken by stomata is LD 50 >8000mg/kg (little and big white rats), and the normal quantity in subacute toxicity test is 80mg/(kg·d). The better mass fraction of doping Ag2O in antibiotic material carried by Al2O3 is 4%CD*28%, and the optimal sintering temperature is from 1000℃ to 1100℃. 展开更多
关键词 CARRIER inorganic antibiotic material Al_2O_3 antibiotic property safety property
在线阅读 下载PDF
Stability of boundary pillars in transition from open pit to underground mining 被引量:11
5
作者 赵兴东 李连崇 +1 位作者 唐春安 张洪训 《Journal of Central South University》 SCIE EI CAS 2012年第11期3256-3265,共10页
Based on the height of back-filled materials, thickness of ore body, height of boundary pillar and dipping angle of ore body and water pressure, the safety factors of all the pillars are calculated with the limit equi... Based on the height of back-filled materials, thickness of ore body, height of boundary pillar and dipping angle of ore body and water pressure, the safety factors of all the pillars are calculated with the limit equilibrium method. The calculation results present that the safety factors of pillars in Sections 19, 20, 24, 28 are less than 1.3, and those of unstable sections are identified preliminarily. Further, a numerical investigation in Sections 18, 20, 22, 24, 25 and 28 implemented with numerical code RFPA20 is employed to further validate the pillar performance and the stability of stopes. The numerical results show the pillars in Sections 18, 22 and 24 are stable and the designed pillar size is suitable. The width of the ore body near Section 28 averages 20 m, failure occurs in the left stope, but the boundary pillars near Section 28 maintain good performance. The pillars in Sections 20 and 25 are unstable which are mainly affected by the Faults F8 and F18. The existence of faults alters the stress distribution, failure mode and water inrush pathway. This work provides a meaningful standard for boundary pillar and stope design in a mine as it transitions from an open pit to underground. 展开更多
关键词 boundary pillar STABILITY underground mining numerical simulation case study
在线阅读 下载PDF
Similar material simulation of time series system for induced caving of roof in continuous mining under backfill 被引量:9
6
作者 高峰 周科平 +1 位作者 董卫军 苏家红 《Journal of Central South University of Technology》 EI 2008年第3期356-360,共5页
With the help of similar material simulation test,time series system for induced caving of roof in continuous mining under complex backfill in ore body No.92 of Tongkeng Tin Mine was studied. According to the similari... With the help of similar material simulation test,time series system for induced caving of roof in continuous mining under complex backfill in ore body No.92 of Tongkeng Tin Mine was studied. According to the similarity theory,a two-dimensional similar simulation test-bed was constructed. The stress and displacement that change along with the advance of mining were acquired and analyzed automatically by data system. The processes of continuous mining of ore-block in 5 intervals and artificial induced caving of roof were simulated. The results of the test show that ore body remained as safety roof in thickness of 15 m guarantees the safe advance of stoping work face. Caving of safety roof puts in practice at the first two mining intervals when the third interval of continuous mining is finished,and one interval as the safety distance should be kept all the time between stopping and caving. While mining in the last interval,pre-slotting should be implemented first of all,and the roof of the last two mining intervals is caved simultaneously. Only this kind of time series system can be an efficient and safe way for induced caving of roof in continuous mining. 展开更多
关键词 continuous mining induced caving similar material simulation safety roof SLOTTING
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部