期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
管道顶进用装配式圆形工作井承载性能研究 被引量:2
1
作者 张兴其 杨帆 姚华彦 《人民长江》 北大核心 2024年第5期143-149,共7页
近年来装配式建筑正逐步应用在地下管道工程中,为了研究管道顶进用装配式圆形工作井的承载性能,结合现场监测的顶管顶进力情况,采用三维有限元方法对装配式圆形工作井的井片混凝土以及连接螺栓进行了受力分析。研究结果表明:通过在管壁... 近年来装配式建筑正逐步应用在地下管道工程中,为了研究管道顶进用装配式圆形工作井的承载性能,结合现场监测的顶管顶进力情况,采用三维有限元方法对装配式圆形工作井的井片混凝土以及连接螺栓进行了受力分析。研究结果表明:通过在管壁涂刷润滑剂、采用触变泥浆进行压浆等减阻措施可以明显降低顶进力荷载,甚至可以使其达到设计值的50%以下;装配式圆形工作井在顶进力荷载的作用下,螺栓受拉情况不明显,仅后座墙位置的井片外侧混凝土呈明显受拉,设计中需要关注,必要时需对该部位制定加固方案;粘贴钢板加固方案相对于粘贴CFRP加固方案具有材料利用率更高、加固效果更加明显的优势。研究成果可为推广装配式建筑在管道工程中的应用提供理论依据和参考借鉴。 展开更多
关键词 地下工程 顶管 装配式圆形工作 井片 顶进荷载 装配式建筑
在线阅读 下载PDF
Critical weight on bit of double-driven bottomhole assembly during vertical and fast drilling 被引量:1
2
作者 祝效华 贾彦杰 童华 《Journal of Central South University》 SCIE EI CAS 2012年第2期572-577,共6页
It is difficult to determine the optimal weight on bit (WOB) of the double-driven bottomhole assembly (DD-BHA, with double stabilizers and a bent housing positive displacement motor (PDM)) which is employed during ver... It is difficult to determine the optimal weight on bit (WOB) of the double-driven bottomhole assembly (DD-BHA, with double stabilizers and a bent housing positive displacement motor (PDM)) which is employed during vertical and fast drilling. High WOB leads to well deviation out of control, and low WOB leads to low rate of penetration (ROP). So considering the rock physical properties, the anisotropy index function of polycrystalline diamond compact (PDC) bit was derived with the structure and cutting performance parameters of the bit, and the effect of natural hole deviation tendencies on the performance of DD-BHA resisting deviation was represented. The concept of elliptic deformation ratio was used to characterize the performance of DD-BHA resisting deviation. Eventually, a model calculating the critical WOB was established. By comparing the model predictions with the measured hole angle changes in the field, the results show that the model predictions are accurate with error less than 5.8%, which can meet the operational requirements in the projects. Furthermore, the model was adopted to justify and guide the operating conditions and parameters during drilling, which shows that the optimum WOB predicted by the model can not only control deviation but also improve ROP effectively. The model is independent on the formation characteristics of blocks, so it can be expanded widely to other oilfields. 展开更多
关键词 double-driven bottomhole assembly vertical and fast drilling critical weight of bit elliptic deformation ratio bit anisotropy
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部