Equipment plays an important role in open pit mining industry and its cost competence at efficient operation and maintenance techniques centered on reliability can lead to significant cost reduction.The application of...Equipment plays an important role in open pit mining industry and its cost competence at efficient operation and maintenance techniques centered on reliability can lead to significant cost reduction.The application of optimal maintenance process was investigated for minimizing the equipment breakdowns and downtimes in Sungun Copper Mine.It results in the improved efficiency and productivity of the equipment and lowered expenses as well as the increased profit margin.The field operating data of 10 trucks are used to estimate the failure and maintenance profile for each component,and modeling and simulation are accomplished by using reliability block diagram method.Trend analysis was then conducted to select proper probabilistic model for maintenance profile.Then reliability of the system was evaluated and importance of each component was computed by weighted importance measure method.This analysis led to identify the items with critical impact on availability of overall equipment in order to prioritize improvement decisions.Later,the availability of trucks was evaluated using Monte Carlo simulation and it is revealed that the uptime of the trucks is around 11000 h at 12000 operation hours.Finally,uncertainty analysis was performed to account for the uncertainty sources in data and models.展开更多
The problem of the stability analysis and controller design which the network-induced delays and data dropout problems network-induced delays are assumed to be time-varying and bounded, for Lurie networked control sys...The problem of the stability analysis and controller design which the network-induced delays and data dropout problems network-induced delays are assumed to be time-varying and bounded, for Lurie networked control systems (NCSs) is investigated, in are simultaneously considered. By considering that the and analyzing the relationship between the delay and its upper bound, employing a Lyapunov-Krasovskii function and an integral inequality approach, an improved stability criterion for NCSs is proposed. Furthermore, the resulting condition is extended to design a less conservative state feedback controller by employing an improved cone complementary linearization (ICCL) algorithm. Numerical examples are provided to show the effectiveness of the method.展开更多
The cost and safety of geotechnical engineering are highly depending on the accuracy of soil shear strength parameters.There are three methods often used to estimate soil shear strength parameters,i.e.,moment method,3...The cost and safety of geotechnical engineering are highly depending on the accuracy of soil shear strength parameters.There are three methods often used to estimate soil shear strength parameters,i.e.,moment method,3-sigma rule and linear regression method.In this study,the accuracy of these three methods is compared.Traditional linear regression method(LRM)can only offer the mean of shear strength parameters.Some engineers misuse the standard error of shear strength indexes as the standard deviations.Such misuse may highly underestimate the uncertainty and induce high risk to the geotechnical design.A modified LRM is proposed to determine both the mean and variance of shear strength parameters.The moment method,three-sigma rule and LRM are used to analyze the tri-axial test data in Xiaolangdi Hydraulic Project and three numerical shear strength tests.The results demonstrate that:1)The modified LRM can offer the most accurate estimation to shear strength parameters;2)A dimensionless formula is much preferred in LRM rather than a dimensional formula.The stress ratio formula is much better than stress relation in the shear strength parameter analysis.The proposed method is applicable to shear strength parameter analysis for tri-axial test data,direct shear test and the un-drained shear strength test of stratified clay.展开更多
In order to overcome the limitations of traditional methods in uncertainty analysis, a modified Bayesian network(BN), which is called evidence network(EN), was proposed with evidence theory to handle epistemic uncerta...In order to overcome the limitations of traditional methods in uncertainty analysis, a modified Bayesian network(BN), which is called evidence network(EN), was proposed with evidence theory to handle epistemic uncertainty in probabilistic risk assessment(PRA). Fault trees(FTs) and event trees(ETs) were transformed into an EN which is used as a uniform framework to represent accident scenarios. Epistemic uncertainties of basic events in PRA were presented in evidence theory form and propagated through the network. A case study of a highway tunnel risk analysis was discussed to demonstrate the proposed approach. Frequencies of end states are obtained and expressed by belief and plausibility measures. The proposed approach addresses the uncertainties in experts' knowledge and can be easily applied to uncertainty analysis of FTs/ETs that have dependent events.展开更多
Error codes induced by M-ary modulation and modulation selection in network-based control systems are studied.It is the first time the issue of error codes induced by M-ary modulation is addressed in control field.In ...Error codes induced by M-ary modulation and modulation selection in network-based control systems are studied.It is the first time the issue of error codes induced by M-ary modulation is addressed in control field.In network-based control systems,error codes induced by noisy channel can significantly decrease the quality of control.To solve this problem,the network-based control system with delay and noisy channel is firstly modeled as an asynchronous dynamic system(ADS).Secondly,conditions of packet with error codes(PEC)loss rate by using M-ary modulation are obtained based on dynamic output feedback scheme.Thirdly,more importantly,the selection principle of M-ary modulation is proposed according to the measured signal-to-noise ratio(SNR)and conditions of PEC loss rate.Finally,system stability is analyzed and controller is designed through Lyapunov function and linear matrix inequality(LMI)scheme,and numerical simulations are made to demonstrate the effectiveness of the proposed scheme.展开更多
The uncertainties of some key influence factors on coal crushing,such as rock strength,pore pressure and magnitude and orientation of three principal stresses,can lead to the uncertainty of coal crushing and make it v...The uncertainties of some key influence factors on coal crushing,such as rock strength,pore pressure and magnitude and orientation of three principal stresses,can lead to the uncertainty of coal crushing and make it very difficult to predict coal crushing under the condition of in-situ reservoir.To account for the uncertainty involved in coal crushing,a deterministic prediction model of coal crushing under the condition of in-situ reservoir was established based on Hoek-Brown criterion.Through this model,key influence factors on coal crushing were selected as random variables and the corresponding probability density functions were determined by combining experiment data and Latin Hypercube method.Then,to analyze the uncertainty of coal crushing,the firstorder second-moment method and the presented model were combined to address the failure probability involved in coal crushing analysis.Using the presented method,the failure probabilities of coal crushing were analyzed for WS5-5 well in Ningwu basin,China,and the relations between failure probability and the influence factors were furthermore discussed.The results show that the failure probabilities of WS5-5 CBM well vary from 0.6 to 1.0; moreover,for the coal seam section at depth of 784.3-785 m,the failure probabilities are equal to 1,which fit well with experiment results; the failure probability of coal crushing presents nonlinear growth relationships with the increase of principal stress difference and the decrease of uniaxial compressive strength.展开更多
Comparison and data analysis with the similarity measures and entropy for fuzzy sets were carried out. The distance proportional value between the fuzzy set and the corresponding crisp set was considered by the fuzzy ...Comparison and data analysis with the similarity measures and entropy for fuzzy sets were carried out. The distance proportional value between the fuzzy set and the corresponding crisp set was considered by the fuzzy entropy. The relation between the similarity measure and the entropy for fuzzy set was also analyzed. The fuzzy entropy was reformulated as the dissimilarity measure. Furthermore, crisp set having the minimum uncertainty with respect to the corresponding fuzzy set was also proposed. Finally, derivation of a similarity measure from entropy with the help of total information property was derived. A simple example shows the relation between similarity measure and fuzzy entropy, in which the summation of similarity measure and fuzzy entropy represents a constant value.展开更多
基金the support of the Maintenance Department of Mobin Co.Sungun Copper mine
文摘Equipment plays an important role in open pit mining industry and its cost competence at efficient operation and maintenance techniques centered on reliability can lead to significant cost reduction.The application of optimal maintenance process was investigated for minimizing the equipment breakdowns and downtimes in Sungun Copper Mine.It results in the improved efficiency and productivity of the equipment and lowered expenses as well as the increased profit margin.The field operating data of 10 trucks are used to estimate the failure and maintenance profile for each component,and modeling and simulation are accomplished by using reliability block diagram method.Trend analysis was then conducted to select proper probabilistic model for maintenance profile.Then reliability of the system was evaluated and importance of each component was computed by weighted importance measure method.This analysis led to identify the items with critical impact on availability of overall equipment in order to prioritize improvement decisions.Later,the availability of trucks was evaluated using Monte Carlo simulation and it is revealed that the uptime of the trucks is around 11000 h at 12000 operation hours.Finally,uncertainty analysis was performed to account for the uncertainty sources in data and models.
基金Project(61025015)supported by the National Natural Science Foundation of China for Distinguished Young ScholarsProject (IRT1044)supported by the Program for Changjiang Scholars and Innovative Research Team in University of China+2 种基金Projects(61143004,61203136,61074067,61273185)supported by the National Natural Science Foundation of ChinaProjects(12JJ4062,11JJ2033)supported by the Natural Science Foundation of Hunan Province,ChinaProject(12C0078)supported by Hunan Provincial Department of Education,China
文摘The problem of the stability analysis and controller design which the network-induced delays and data dropout problems network-induced delays are assumed to be time-varying and bounded, for Lurie networked control systems (NCSs) is investigated, in are simultaneously considered. By considering that the and analyzing the relationship between the delay and its upper bound, employing a Lyapunov-Krasovskii function and an integral inequality approach, an improved stability criterion for NCSs is proposed. Furthermore, the resulting condition is extended to design a less conservative state feedback controller by employing an improved cone complementary linearization (ICCL) algorithm. Numerical examples are provided to show the effectiveness of the method.
基金Project(2017YFC0404803) supported by the National Key Research and Development Program of ChinaProject(51678040) supported by the National Natural Science Foundation of ChinaProject(8192034) supported by the Beijing Municipal Natural Science Foundation,China
文摘The cost and safety of geotechnical engineering are highly depending on the accuracy of soil shear strength parameters.There are three methods often used to estimate soil shear strength parameters,i.e.,moment method,3-sigma rule and linear regression method.In this study,the accuracy of these three methods is compared.Traditional linear regression method(LRM)can only offer the mean of shear strength parameters.Some engineers misuse the standard error of shear strength indexes as the standard deviations.Such misuse may highly underestimate the uncertainty and induce high risk to the geotechnical design.A modified LRM is proposed to determine both the mean and variance of shear strength parameters.The moment method,three-sigma rule and LRM are used to analyze the tri-axial test data in Xiaolangdi Hydraulic Project and three numerical shear strength tests.The results demonstrate that:1)The modified LRM can offer the most accurate estimation to shear strength parameters;2)A dimensionless formula is much preferred in LRM rather than a dimensional formula.The stress ratio formula is much better than stress relation in the shear strength parameter analysis.The proposed method is applicable to shear strength parameter analysis for tri-axial test data,direct shear test and the un-drained shear strength test of stratified clay.
基金Project(71201170)supported by the National Natural Science Foundation of China
文摘In order to overcome the limitations of traditional methods in uncertainty analysis, a modified Bayesian network(BN), which is called evidence network(EN), was proposed with evidence theory to handle epistemic uncertainty in probabilistic risk assessment(PRA). Fault trees(FTs) and event trees(ETs) were transformed into an EN which is used as a uniform framework to represent accident scenarios. Epistemic uncertainties of basic events in PRA were presented in evidence theory form and propagated through the network. A case study of a highway tunnel risk analysis was discussed to demonstrate the proposed approach. Frequencies of end states are obtained and expressed by belief and plausibility measures. The proposed approach addresses the uncertainties in experts' knowledge and can be easily applied to uncertainty analysis of FTs/ETs that have dependent events.
基金Project(61172022) supported by the National Natural Science Foundation of ChinaProject(GDW20151100010) supported by the State Administration of Foreign Experts Affairs of China
文摘Error codes induced by M-ary modulation and modulation selection in network-based control systems are studied.It is the first time the issue of error codes induced by M-ary modulation is addressed in control field.In network-based control systems,error codes induced by noisy channel can significantly decrease the quality of control.To solve this problem,the network-based control system with delay and noisy channel is firstly modeled as an asynchronous dynamic system(ADS).Secondly,conditions of packet with error codes(PEC)loss rate by using M-ary modulation are obtained based on dynamic output feedback scheme.Thirdly,more importantly,the selection principle of M-ary modulation is proposed according to the measured signal-to-noise ratio(SNR)and conditions of PEC loss rate.Finally,system stability is analyzed and controller is designed through Lyapunov function and linear matrix inequality(LMI)scheme,and numerical simulations are made to demonstrate the effectiveness of the proposed scheme.
基金Project(51204201)supported by the National Natural Science Foundation of ChinaProjects(2011ZX05036-001,2011ZX05037-004)supported by the National Science and Technology Major Program of China+1 种基金Project(2010CB226706)supported by the National Basic Research Program of ChinaProject(11CX04050A)supported by the Fundamental Research Funds for the Central Universities of China
文摘The uncertainties of some key influence factors on coal crushing,such as rock strength,pore pressure and magnitude and orientation of three principal stresses,can lead to the uncertainty of coal crushing and make it very difficult to predict coal crushing under the condition of in-situ reservoir.To account for the uncertainty involved in coal crushing,a deterministic prediction model of coal crushing under the condition of in-situ reservoir was established based on Hoek-Brown criterion.Through this model,key influence factors on coal crushing were selected as random variables and the corresponding probability density functions were determined by combining experiment data and Latin Hypercube method.Then,to analyze the uncertainty of coal crushing,the firstorder second-moment method and the presented model were combined to address the failure probability involved in coal crushing analysis.Using the presented method,the failure probabilities of coal crushing were analyzed for WS5-5 well in Ningwu basin,China,and the relations between failure probability and the influence factors were furthermore discussed.The results show that the failure probabilities of WS5-5 CBM well vary from 0.6 to 1.0; moreover,for the coal seam section at depth of 784.3-785 m,the failure probabilities are equal to 1,which fit well with experiment results; the failure probability of coal crushing presents nonlinear growth relationships with the increase of principal stress difference and the decrease of uniaxial compressive strength.
基金Project(2010-0020163) supported by Priority Research Centers Program through the National Research Foundation of Korea (NRF) funded by the Ministry of Education, Science and Technology, Korea
文摘Comparison and data analysis with the similarity measures and entropy for fuzzy sets were carried out. The distance proportional value between the fuzzy set and the corresponding crisp set was considered by the fuzzy entropy. The relation between the similarity measure and the entropy for fuzzy set was also analyzed. The fuzzy entropy was reformulated as the dissimilarity measure. Furthermore, crisp set having the minimum uncertainty with respect to the corresponding fuzzy set was also proposed. Finally, derivation of a similarity measure from entropy with the help of total information property was derived. A simple example shows the relation between similarity measure and fuzzy entropy, in which the summation of similarity measure and fuzzy entropy represents a constant value.