期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
试论红色旅游开发中红色旧址的保护和利用——以江西玉山下镇池头墩村为例 被引量:4
1
作者 章建人 周振平 《农业考古》 北大核心 2011年第3期291-293,共3页
玉山下镇池头墩村姜献华家是上饶集中营秘密党组织建立的唯一的一个接应越狱志士的接应点,这里有姜献华等越狱志士组织的在抗日战争时期上饶唯一的一支由共产党领导的浙赣边区抗日游击大队,这里有许多红色资源旧址,但一直没有被有效保... 玉山下镇池头墩村姜献华家是上饶集中营秘密党组织建立的唯一的一个接应越狱志士的接应点,这里有姜献华等越狱志士组织的在抗日战争时期上饶唯一的一支由共产党领导的浙赣边区抗日游击大队,这里有许多红色资源旧址,但一直没有被有效保护。本文对该地的红色旅游资源的历史背景、现状、保护和开发等方面进行了一系列的探索。 展开更多
关键词 下镇 水碓 姜献华故居 坟墓 纪念亭
在线阅读 下载PDF
Integrated evaluation system under randomness and fuzziness for groundwater contamination risk assessment in a little town, Central China 被引量:2
2
作者 祝慧娜 袁兴中 +4 位作者 梁婕 刘永德 尹娟 江洪炜 黄华军 《Journal of Central South University》 SCIE EI CAS 2014年第3期1044-1050,共7页
An integrated evaluation system under randomness and fuzziness was developed in this work to systematically assess the risk of groundwater contamination in a little town, Central China. In this system, randomness of t... An integrated evaluation system under randomness and fuzziness was developed in this work to systematically assess the risk of groundwater contamination in a little town, Central China. In this system, randomness of the parameters and the fuzziness of the risk were considered simultaneously, and the exceeding standard probability of contamination and human health risk due to the contamination were integrated. The contamination risk was defined as a combination of "vulnerability" and "hazard". To calculate the value of "vulnerability", pollutant concentration was simulated by MODFLOW with random input variables and a new modified health risk assessment(MRA) model was established to analyze the level of "hazard". The limit concentration based on environmental-guideline and health risk due to manganese were systematically examined to obtain the general risk levels through a fuzzy rule base. The "vulnerability" and "hazard" were divided into five categories of "high", "medium-high", "medium", "low-medium" and "low", respectively. Then, "vulnerability" and "hazard" were firstly combined by integrated evaluation. Compared with the other two scenarios under deterministic methods, the risk obtained in the proposed system is higher. This research illustrated that ignoring of uncertainties in evaluation process might underestimate the risk level. 展开更多
关键词 integrated evaluation RANDOMNESS FUZZINESS modified health risk assessment uncertainty MANGANESE
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部