期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
多孔射油器的全三维数值理论设计 被引量:1
1
作者 巨春影 蒙俊斌 《汽轮机技术》 北大核心 2007年第3期195-196,共2页
对某多孔射油器进行了全三维数值理论计算分析,为汽轮机润滑油系统的设计和故障诊断提供了理论依据。
关键词 油系统 射油器 三维数值设计
在线阅读 下载PDF
Orthogonal design and numerical simulation of room and pillar configurations in fractured stopes 被引量:7
2
作者 吴爱祥 黄明清 +3 位作者 韩斌 王贻明 于少峰 缪秀秀 《Journal of Central South University》 SCIE EI CAS 2014年第8期3338-3344,共7页
Room and pillar sizes are key factors for safe mining and ore recovery in open-stope mining. To investigate the influence of room and pillar configurations on stope stability in highly fractured and weakened areas, an... Room and pillar sizes are key factors for safe mining and ore recovery in open-stope mining. To investigate the influence of room and pillar configurations on stope stability in highly fractured and weakened areas, an orthogonal design with two factors, three levels and nine runs was proposed, followed by three-dimensional numerical simulation using ANSYS and FLAC3~. Results show that surface settlement after excavation is concentrically ringed, and increases with the decrease of pillar width and distances to stope gobs. In the meantime, the ore-control fault at the ore-rock boundary and the fractured argillaceous dolomite with intercalated slate at the hanging wall deteriorate the roof settlement. Additionally, stope stability is challenged due to pillar rheological yield and stress concentration, and both are induced by redistribution of stress and plastic zones after mining. Following an objective function and a constraint function, room and pillar configuration with widths of 14 m and 16 m, respectively, is presented as the optimization for improving the ore recovery rate while maintaining a safe working environment. 展开更多
关键词 orthogonal design numerical simulation surface movement roof settlement stope stability room and pillarconfiguration
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部