期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
安徽安庆铜矿接触带三维形态及其控矿机制分析 被引量:5
1
作者 赵义来 刘亮明 +1 位作者 蔡爱良 邹陈 《地质与勘探》 CAS CSCD 北大核心 2010年第4期649-656,共8页
安庆铜矿是长江中下游成矿带中规模最大的铜铁矿床,其绝大部分矿体产在月山岩体与三叠系灰岩的接触带上,矿体的产出位置及规模与接触带的特征密切相关。本文通过三维模拟的方法研究了岩体接触带的三维形态及其与安庆铜矿矿体空间定位的... 安庆铜矿是长江中下游成矿带中规模最大的铜铁矿床,其绝大部分矿体产在月山岩体与三叠系灰岩的接触带上,矿体的产出位置及规模与接触带的特征密切相关。本文通过三维模拟的方法研究了岩体接触带的三维形态及其与安庆铜矿矿体空间定位的关系,认为:月山矿田的矿体分布极不均匀,绝大部分矿体产在形态复杂、产状显著变化的岩体东枝南接触带;安庆铜矿的控矿接触带形态从东到西具有阶梯状-阶梯状、舌状过渡-舌状的变化规律;阶梯状接触带的陡倾及由陡变缓的位置和舌状接触带的尖端处是主要的成矿部位。上述接触带控矿规律推测是区域构造应力场、岩体侵位、冷凝造成的局部应力场以及成矿流体共同作用的结果。 展开更多
关键词 接触带 矿体 三维形态模拟 控矿机制 安庆铜矿
在线阅读 下载PDF
3-D fracture network dynamic simulation based on error analysis in rock mass of dam foundation 被引量:5
2
作者 ZHONG Deng-hua WU Han +2 位作者 WU Bin-ping ZHANG Yi-chi YUE Pan 《Journal of Central South University》 SCIE EI CAS CSCD 2018年第4期919-935,共17页
Accurate 3-D fracture network model for rock mass in dam foundation is of vital importance for stability,grouting and seepage analysis of dam foundation.With the aim of reducing deviation between fracture network mode... Accurate 3-D fracture network model for rock mass in dam foundation is of vital importance for stability,grouting and seepage analysis of dam foundation.With the aim of reducing deviation between fracture network model and measured data,a 3-D fracture network dynamic modeling method based on error analysis was proposed.Firstly,errors of four fracture volume density estimation methods(proposed by ODA,KULATILAKE,MAULDON,and SONG)and that of four fracture size estimation methods(proposed by EINSTEIN,SONG and TONON)were respectively compared,and the optimal methods were determined.Additionally,error index representing the deviation between fracture network model and measured data was established with integrated use of fractal dimension and relative absolute error(RAE).On this basis,the downhill simplex method was used to build the dynamic modeling method,which takes the minimum of error index as objective function and dynamically adjusts the fracture density and size parameters to correct the error index.Finally,the 3-D fracture network model could be obtained which meets the requirements.The proposed method was applied for 3-D fractures simulation in Miao Wei hydropower project in China for feasibility verification and the error index reduced from 2.618 to 0.337. 展开更多
关键词 rock mass of dam foundation 3-D fracture network dynamic simulation fractal dimension error analysis relative absolute error(RAE) downhill simplex method
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部