期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
论“断交”后台湾当局“双边协定”的处理 被引量:2
1
作者 彭莉 上官丹怡 《厦门大学学报(哲学社会科学版)》 CSSCI 北大核心 2019年第2期92-100,共9页
1949年10月中华人民共和国成立以来,各国陆续与台湾当局断绝"外交关系"。为推行其所谓的"实质外交"策略,台湾当局在与他国结束官方关系后,对于双方间的既有"协定"总体上采行的是通过协商以尽可能维持&qu... 1949年10月中华人民共和国成立以来,各国陆续与台湾当局断绝"外交关系"。为推行其所谓的"实质外交"策略,台湾当局在与他国结束官方关系后,对于双方间的既有"协定"总体上采行的是通过协商以尽可能维持"协定"关系的处理态度。实践中,也确有部分"双边协定"得以继续实施。值得注意的是,其中某些"协定"延续的途径既和台湾在国际法上的地位不符,又与各国政府同中国政府的建交公报精神相违背。为在国际社会强调一个中国,维护两岸关系和平发展,中国政府应对台湾与"断交国"之间逾越一个中国原则的行径有所防范。 展开更多
关键词 台湾 “断交” “双边协定” 一个中国原则
在线阅读 下载PDF
Method of assessing political skill for personnel selection:Development and validation of a situational judgment test
2
作者 Qingxiong Weng Ying Zhao 《中国科学技术大学学报》 CSCD 北大核心 2024年第11期9-19,8,66,共13页
Political skill is a critical interpersonal competency.However,the self-reported political skill scale is unsuitable for personnel selection beacuse it may lead to socially desirable responses,thereby compromising the... Political skill is a critical interpersonal competency.However,the self-reported political skill scale is unsuitable for personnel selection beacuse it may lead to socially desirable responses,thereby compromising the authenticity of the test scores.Consequently,the absence of a valid assessment method limits the application of political skill in selection con-texts.In this study,we applied the situational judgment test(SJT)method to measure political skill and conducted two sub-studies to evaluate the reliability and validity of the situational judgment test of political skill(SJT-PS).Study 1 focused on the development and initial testing of the SJT-PS.The results demonstrated that the SJT-PS possessed strong structural validity and reliability.Study 2 aimed to assess the criterion-related and incremental validity of the SJT-PS.To evaluate the predictive validity of the SJT-PS in selection contexts,we first compared the correlations between the SJT-PS and self-reported political skill with social desirability.Subsequently,we selected team-member exchange(TMX)and workplace popularity as criteria.The results indicated that the SJT-PS was less affected by social desirability,while self-reported political skill exhibited a significant positive correlation with social desirability.Additionally,the SJT-PS positively pre-dicted TMX and workplace popularity and demonstrated incremental validity over the self-reported political skill scale. 展开更多
关键词 political skill situational judgment test self-reported measurement team-member exchange workplace popularity
在线阅读 下载PDF
Orthogonal design and numerical simulation of room and pillar configurations in fractured stopes 被引量:7
3
作者 吴爱祥 黄明清 +3 位作者 韩斌 王贻明 于少峰 缪秀秀 《Journal of Central South University》 SCIE EI CAS 2014年第8期3338-3344,共7页
Room and pillar sizes are key factors for safe mining and ore recovery in open-stope mining. To investigate the influence of room and pillar configurations on stope stability in highly fractured and weakened areas, an... Room and pillar sizes are key factors for safe mining and ore recovery in open-stope mining. To investigate the influence of room and pillar configurations on stope stability in highly fractured and weakened areas, an orthogonal design with two factors, three levels and nine runs was proposed, followed by three-dimensional numerical simulation using ANSYS and FLAC3~. Results show that surface settlement after excavation is concentrically ringed, and increases with the decrease of pillar width and distances to stope gobs. In the meantime, the ore-control fault at the ore-rock boundary and the fractured argillaceous dolomite with intercalated slate at the hanging wall deteriorate the roof settlement. Additionally, stope stability is challenged due to pillar rheological yield and stress concentration, and both are induced by redistribution of stress and plastic zones after mining. Following an objective function and a constraint function, room and pillar configuration with widths of 14 m and 16 m, respectively, is presented as the optimization for improving the ore recovery rate while maintaining a safe working environment. 展开更多
关键词 orthogonal design numerical simulation surface movement roof settlement stope stability room and pillarconfiguration
在线阅读 下载PDF
Safety diagnosis on coal mine production system based on fuzzy logic inference 被引量:4
4
作者 王爽英 左红艳 《Journal of Central South University》 SCIE EI CAS 2012年第2期477-481,共5页
According to the randomness and uncertainty of information in the safety diagnosis of coal mine production system (CMPS), a novel safety diagnosis method was proposed by applying fuzzy logic inference method, which co... According to the randomness and uncertainty of information in the safety diagnosis of coal mine production system (CMPS), a novel safety diagnosis method was proposed by applying fuzzy logic inference method, which consists of safety diagnosis fuzzifier, defuzzifier, fuzzy rules base and inference engine. Through the safety diagnosis on coal mine roadway rail transportation system, the result shows that the unsafe probability is about 0.5 influenced by no speed reduction and over quick turnout on roadway, which is the most possible reason leading to the accident of roadway rail transportation system. 展开更多
关键词 coal mine production system safety diagnosis fuzzy logic inference
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部