In order to specify the overvoltage and insulation level of equipments in ±1 100 kV UHVDC converter stations,the arrester configuration scheme and some basic parameters for ±1 100 kV Zhundong converter stati...In order to specify the overvoltage and insulation level of equipments in ±1 100 kV UHVDC converter stations,the arrester configuration scheme and some basic parameters for ±1 100 kV Zhundong converter station are proposed.Overvoltage of equipments in AC system,valve hall,DC busbar,and neutral busbar are also calculated in accordance with the fundamental principles of arrester configuration for UHV converter stations and the existing experiences in insulation coordination of ±800 kV UHVDC converter stations.The work is done also for specifing insulation levels for ±1 100 kV UHVDC converter stations of the ±1 100 kV UHVDC power transmission project from Zhundong to Sichuan in China.Thus,the recommended insulation margins that determine the insulation levels of converter station equipments are proposed: the insulation margins for thyristor valves are 10%/10%/15% for switching impulse/ lightning impulse/ steer front impulse; the insulation levels of lighting and swtiching impulses are recommended as 2 600 kV and 2 150 kV respectively for 1 100 kV DC buses,and as 2 250 kV and 2 100 kV respectively for equipments at the valve side of high-voltage Y/Y converter transformers.展开更多
直流输电系统的内过电压主要通过金属氧化物避雷器(metal oxide arrester,MOA)加以限制,避雷器在内过电压下的保护特性对确定设备的操作冲击绝缘水平具有重要意义。根据±1 100 k V主回路接线、避雷器配置、交直流系统参数等,建立...直流输电系统的内过电压主要通过金属氧化物避雷器(metal oxide arrester,MOA)加以限制,避雷器在内过电压下的保护特性对确定设备的操作冲击绝缘水平具有重要意义。根据±1 100 k V主回路接线、避雷器配置、交直流系统参数等,建立了±1 100 k V系统内过电压计算模型。对避雷器电压和电流波形进行仿真,对避雷器电流的波头时间进行统计。统计结果为:内过电压下通过避雷器电流的波头时间均不小于100μs,大于标准操作冲击电流的波头时间30μs,需要对较缓电流波头下避雷器的保护特性进行研究。为加以对比,对波形为316/814μs、30/60μs、8/20μs和1/4μs电流下的避雷器伏秒特性和伏安特性进行了试验研究。结果表明,同样电流下,1/4μs的伏安特性曲线高于8/20μs、30/60μs和316/814μs的曲线,而后三者的伏安特性曲线则区别不大;8/20μs、30/60μs和316/814μs的伏安特性相比,在0.1~1 k A电流范围内,30/60μs的伏安特性曲线比8/20μs和316/814μs的伏安特性曲线稍高。由于避雷器操作冲击电流的波头时间均不小于100μs,内过电压下避雷器取30/60μs电流波形下的伏安曲线是合适的,且是稍微偏严的。最后试验测试了避雷器电阻片在30/60μs操作冲击电流下的伏安特性。展开更多
简述准东—皖南±1 100 k V特高压直流输电示范工程在世界上具有输送容最大、电压等级最高、输送距离最远等优点,分析±1 100 k V直流工程系统试验需要研究内容以及需要完成的工作。借鉴±800 k V直流工程系统研究和现场系...简述准东—皖南±1 100 k V特高压直流输电示范工程在世界上具有输送容最大、电压等级最高、输送距离最远等优点,分析±1 100 k V直流工程系统试验需要研究内容以及需要完成的工作。借鉴±800 k V直流工程系统研究和现场系统试验的经验,结合±1 100 k V特高压直流输电工程的特点,对±1 100 k V特高压直流系统进行仿真计算分析研究,内容包括:±1 100 V特高压直流接入系统分析、系统稳定计算分析、过电压计算分析和直流控制保护计算分析。根据上述系统计算分析结果,提出系统安全稳定控制策略、过电压控制策略和直流系统控制保护策略。结合±1 100 k V直流工程受端高低端换流器分层接入系统的特点,提出±1 100 k V特高压直流输电工程系统试验方案。展开更多
基金supported by National Basic Research Program of China(973 Program)(2011CB209405)
文摘In order to specify the overvoltage and insulation level of equipments in ±1 100 kV UHVDC converter stations,the arrester configuration scheme and some basic parameters for ±1 100 kV Zhundong converter station are proposed.Overvoltage of equipments in AC system,valve hall,DC busbar,and neutral busbar are also calculated in accordance with the fundamental principles of arrester configuration for UHV converter stations and the existing experiences in insulation coordination of ±800 kV UHVDC converter stations.The work is done also for specifing insulation levels for ±1 100 kV UHVDC converter stations of the ±1 100 kV UHVDC power transmission project from Zhundong to Sichuan in China.Thus,the recommended insulation margins that determine the insulation levels of converter station equipments are proposed: the insulation margins for thyristor valves are 10%/10%/15% for switching impulse/ lightning impulse/ steer front impulse; the insulation levels of lighting and swtiching impulses are recommended as 2 600 kV and 2 150 kV respectively for 1 100 kV DC buses,and as 2 250 kV and 2 100 kV respectively for equipments at the valve side of high-voltage Y/Y converter transformers.
文摘直流输电系统的内过电压主要通过金属氧化物避雷器(metal oxide arrester,MOA)加以限制,避雷器在内过电压下的保护特性对确定设备的操作冲击绝缘水平具有重要意义。根据±1 100 k V主回路接线、避雷器配置、交直流系统参数等,建立了±1 100 k V系统内过电压计算模型。对避雷器电压和电流波形进行仿真,对避雷器电流的波头时间进行统计。统计结果为:内过电压下通过避雷器电流的波头时间均不小于100μs,大于标准操作冲击电流的波头时间30μs,需要对较缓电流波头下避雷器的保护特性进行研究。为加以对比,对波形为316/814μs、30/60μs、8/20μs和1/4μs电流下的避雷器伏秒特性和伏安特性进行了试验研究。结果表明,同样电流下,1/4μs的伏安特性曲线高于8/20μs、30/60μs和316/814μs的曲线,而后三者的伏安特性曲线则区别不大;8/20μs、30/60μs和316/814μs的伏安特性相比,在0.1~1 k A电流范围内,30/60μs的伏安特性曲线比8/20μs和316/814μs的伏安特性曲线稍高。由于避雷器操作冲击电流的波头时间均不小于100μs,内过电压下避雷器取30/60μs电流波形下的伏安曲线是合适的,且是稍微偏严的。最后试验测试了避雷器电阻片在30/60μs操作冲击电流下的伏安特性。
文摘简述准东—皖南±1 100 k V特高压直流输电示范工程在世界上具有输送容最大、电压等级最高、输送距离最远等优点,分析±1 100 k V直流工程系统试验需要研究内容以及需要完成的工作。借鉴±800 k V直流工程系统研究和现场系统试验的经验,结合±1 100 k V特高压直流输电工程的特点,对±1 100 k V特高压直流系统进行仿真计算分析研究,内容包括:±1 100 V特高压直流接入系统分析、系统稳定计算分析、过电压计算分析和直流控制保护计算分析。根据上述系统计算分析结果,提出系统安全稳定控制策略、过电压控制策略和直流系统控制保护策略。结合±1 100 k V直流工程受端高低端换流器分层接入系统的特点,提出±1 100 k V特高压直流输电工程系统试验方案。