期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Optimal arrangement for pressure measurement points in working chamber of earth pressure balance shield 被引量:4
1
作者 刘畅 屈福政 +1 位作者 李守巨 孟庆琳 《Journal of Central South University》 SCIE EI CAS 2012年第7期1883-1891,共9页
In order to exactly provide scientific basis for pressure dynamic balance control of working chamber of earth pressure balance shield (EPBS),study on optimal arrangement of pressure measurement points in working chamb... In order to exactly provide scientific basis for pressure dynamic balance control of working chamber of earth pressure balance shield (EPBS),study on optimal arrangement of pressure measurement points in working chamber was conducted. Based on mathematical description of optimal arrangement for pressure measurement points,fuzzy clustering analysis and discriminant analysis were used to divide pressure regions of nodes on bulkhead. Finally,the selection method of optimal measurement points was proposed,and by selecting d6.28 m EPBS as study object,the case study was conducted. By contrast,based on optimal arrangement scheme of pressure measurement points,through adopting weighted algorithm,the absolute error mean of equivalent pressure of working chamber is the smallest. In addition,pressure curve of optimal arrangement points presents parabola,and it can show the state of pressure distribution on bulkhead truly. It is concluded that the optimal arrangement method of pressure measurement points in working chamber is effective and feasible,and the method can provide basis for realizing high precision pressure control of EPBS. 展开更多
关键词 TUNNELING earth pressure balance shield working chamber optimal arrangement discrete element method
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部