Based on a typical multi-arch tunnel in a freeway, the fast Lagrangian analysis of continua in 3 dimensions(FLAC3D) was used to calculate the surrounding rock deformation of the tunnel under which the effect of underg...Based on a typical multi-arch tunnel in a freeway, the fast Lagrangian analysis of continua in 3 dimensions(FLAC3D) was used to calculate the surrounding rock deformation of the tunnel under which the effect of underground water seepage flow was taken into account or not. The distribution of displacement field around the multi-arch tunnel, which is influenced by the seepage field, was gained. The result indicates that the settlement values of the vault derived from coupling analysis are bigger when considering the seepage flow effect than that not considering. Through the contrast of arch subsidence quantities calculated by two kinds of computation situations, and the comparison between the calculated and measured value of tunnel vault settlement, it is found that the calculated value(5.7-6.0 mm) derived from considering the seepage effect is more close to the measured value(5.8-6.8 mm). Therefore, it is quite necessary to consider the seepage flow effect of the underground water in aquiferous stratum for multi-arch tunnel design.展开更多
For the Guanshui Road Station tunnel project of Guiyang Metro Line 2,the wind pavilion group was moved out of the main tunnel to reduce the number of openings in the main tunnel,and the wind pavilion group was excavat...For the Guanshui Road Station tunnel project of Guiyang Metro Line 2,the wind pavilion group was moved out of the main tunnel to reduce the number of openings in the main tunnel,and the wind pavilion group was excavated in a triangular configuration at the entrance of the main tunnel.Based on the finite element software ABAQUS,a three-dimensional model is established to study the influence of different triangular-distribution tunnels excavation schemes on the surface settlement and tunnel stability.The objective of this study is to reveal the change rules of surface settlement,deformation and force in the support structures and the surrounding rock and identify the best excavation scheme for this tunnel configuration.Results show that to control the surface settlement and the deformation of the support structures,the optimal excavation sequence involves excavating the upper fresh air exhaust tunnel before the lower running tunnel.To control the stress of the support structures,the optimal excavation involves excavating the lower running tunnel before the upper fresh air exhaust tunnel.In this project,the most reasonable excavation sequence of the tunnel is from top to bottom.The most reasonable thickness of tunnel penetration is 5 m.展开更多
基金Project(50490274) supported by the National Natural Science Foundation of ChinaProject(200516) supported by Hunan Transportation Science and Technology
文摘Based on a typical multi-arch tunnel in a freeway, the fast Lagrangian analysis of continua in 3 dimensions(FLAC3D) was used to calculate the surrounding rock deformation of the tunnel under which the effect of underground water seepage flow was taken into account or not. The distribution of displacement field around the multi-arch tunnel, which is influenced by the seepage field, was gained. The result indicates that the settlement values of the vault derived from coupling analysis are bigger when considering the seepage flow effect than that not considering. Through the contrast of arch subsidence quantities calculated by two kinds of computation situations, and the comparison between the calculated and measured value of tunnel vault settlement, it is found that the calculated value(5.7-6.0 mm) derived from considering the seepage effect is more close to the measured value(5.8-6.8 mm). Therefore, it is quite necessary to consider the seepage flow effect of the underground water in aquiferous stratum for multi-arch tunnel design.
基金Projects(B200204032,2019B07914)supported by the Fundamental Research Funds for the Central Universities,ChinaProjects(51878667,51678571,51808193)supported by the National Natural Science Foundation of China。
文摘For the Guanshui Road Station tunnel project of Guiyang Metro Line 2,the wind pavilion group was moved out of the main tunnel to reduce the number of openings in the main tunnel,and the wind pavilion group was excavated in a triangular configuration at the entrance of the main tunnel.Based on the finite element software ABAQUS,a three-dimensional model is established to study the influence of different triangular-distribution tunnels excavation schemes on the surface settlement and tunnel stability.The objective of this study is to reveal the change rules of surface settlement,deformation and force in the support structures and the surrounding rock and identify the best excavation scheme for this tunnel configuration.Results show that to control the surface settlement and the deformation of the support structures,the optimal excavation sequence involves excavating the upper fresh air exhaust tunnel before the lower running tunnel.To control the stress of the support structures,the optimal excavation involves excavating the lower running tunnel before the upper fresh air exhaust tunnel.In this project,the most reasonable excavation sequence of the tunnel is from top to bottom.The most reasonable thickness of tunnel penetration is 5 m.