The development of renewable energy power generation for carbon neutrality and energy transition has been increasing worldwide,leading to an increasing demand for high-power conversion.Compared with traditional interl...The development of renewable energy power generation for carbon neutrality and energy transition has been increasing worldwide,leading to an increasing demand for high-power conversion.Compared with traditional interleaved paralleling,the integrated paralleling of three-level inverters can further reduce the output harmonics.Moreover,a well-designed switching sequence ensures that the average circulating current is zero,which provides a superior and feasible solution to satisfy the demands of high-power operations.However,a large instantaneous loop current exists between shunt converters,which leads to disadvantages such as higher switching device stress and loss.In this study,by utilizing the state-distribution redundancy provided by the integrated modulation process,a new design for switch-ing sequences is suggested for the integrated modulation of shunt three-level converters.This design aims to reduce the circulating current while better preserving the same output current harmonics than traditional parallel methods.The proposal includes an in-depth analysis and explanation of the implementation process.Finally,the proposed method is validated through simulations and prototype experi-ments.The results indicate that compared with traditional methods,the adoption of the improved switching sequence presented in this study leads to an average reduction of 3.2%in the total harmonic distortion of the inverter’s output and an average decrease of 32%in the amplitude of the circulating current.Both the output harmonics and circulating currents are significantly suppressed across various modulation indices.展开更多
针对永磁同步电机下桥臂电流采样拓扑的无位置传感器控制系统,在低载波运行时受数字延时影响易导致位置估计精度低、电流纹波增大、稳定性差等问题,提出一种半周期计算、单采样双更新的空间矢量脉宽调制方法,有效减少系统数字延时。该...针对永磁同步电机下桥臂电流采样拓扑的无位置传感器控制系统,在低载波运行时受数字延时影响易导致位置估计精度低、电流纹波增大、稳定性差等问题,提出一种半周期计算、单采样双更新的空间矢量脉宽调制方法,有效减少系统数字延时。该方法在每个脉冲宽度调制(Pulse-Width Modulation,PWM)的载波过零处采样一次电流,并在采样结束后的半周期内完成目标电压矢量计算。考虑数字延时中电机转过的角度,将目标电压矢量在下一个PWM周期的前、后半周期输出,并分别补偿0.75 T s和1.25 T s等效延时(T s为PWM周期时间),以减小目标电压矢量与实际输出电压矢量之间的误差。将新方法应用于采用模型参考自适应速度观测器的永磁同步电机无位置传感器控制系统中,实验结果表明该方法位置估计精度高、电流纹波小,且可以稳定运行于额定负载、载波比为4.0的工况。展开更多
基金supported by the National Natural Science Foundation of China(Grant No.51977046)Wuxi University Research Start-up Fund for Introduced Talent(2022r021).
文摘The development of renewable energy power generation for carbon neutrality and energy transition has been increasing worldwide,leading to an increasing demand for high-power conversion.Compared with traditional interleaved paralleling,the integrated paralleling of three-level inverters can further reduce the output harmonics.Moreover,a well-designed switching sequence ensures that the average circulating current is zero,which provides a superior and feasible solution to satisfy the demands of high-power operations.However,a large instantaneous loop current exists between shunt converters,which leads to disadvantages such as higher switching device stress and loss.In this study,by utilizing the state-distribution redundancy provided by the integrated modulation process,a new design for switch-ing sequences is suggested for the integrated modulation of shunt three-level converters.This design aims to reduce the circulating current while better preserving the same output current harmonics than traditional parallel methods.The proposal includes an in-depth analysis and explanation of the implementation process.Finally,the proposed method is validated through simulations and prototype experi-ments.The results indicate that compared with traditional methods,the adoption of the improved switching sequence presented in this study leads to an average reduction of 3.2%in the total harmonic distortion of the inverter’s output and an average decrease of 32%in the amplitude of the circulating current.Both the output harmonics and circulating currents are significantly suppressed across various modulation indices.
文摘针对永磁同步电机下桥臂电流采样拓扑的无位置传感器控制系统,在低载波运行时受数字延时影响易导致位置估计精度低、电流纹波增大、稳定性差等问题,提出一种半周期计算、单采样双更新的空间矢量脉宽调制方法,有效减少系统数字延时。该方法在每个脉冲宽度调制(Pulse-Width Modulation,PWM)的载波过零处采样一次电流,并在采样结束后的半周期内完成目标电压矢量计算。考虑数字延时中电机转过的角度,将目标电压矢量在下一个PWM周期的前、后半周期输出,并分别补偿0.75 T s和1.25 T s等效延时(T s为PWM周期时间),以减小目标电压矢量与实际输出电压矢量之间的误差。将新方法应用于采用模型参考自适应速度观测器的永磁同步电机无位置传感器控制系统中,实验结果表明该方法位置估计精度高、电流纹波小,且可以稳定运行于额定负载、载波比为4.0的工况。