期刊文献+
共找到3,447篇文章
< 1 2 173 >
每页显示 20 50 100
Controlling deflection of long steel I-shaped girder bridge using two V-shaped pre-tensioning cables 被引量:2
1
作者 Fatemeh PARTOVI Nader FANAIE 《Journal of Central South University》 SCIE EI CAS CSCD 2020年第2期566-577,共12页
Despite appropriate design of girder under bending and shear,the deflection of long steel girders usually exceeds the allowable range,and therefore the structural designers encounter challenges in this regard.Consider... Despite appropriate design of girder under bending and shear,the deflection of long steel girders usually exceeds the allowable range,and therefore the structural designers encounter challenges in this regard.Considering significant features of the cables,namely,low weight,small cross section,and high tensile strength,they are used in this research so as to control the deflection of long girder bridges,rather than increasing their heights.In this study,theoretical relations are developed to calculate the increase in pre-tensioning force of V-shaped steel cables under external loading as well as the deflection of steel girder bridges with V-shaped cables and different support conditions.To verify the theoretical relations,the steel girder bridge is modeled in the finite element ABAQUS software with different support conditions without cable and with V-shaped cables.The obtained results show that the theoretical relations can appropriately predict the deflection of girder bridge with V-shaped cables and different support conditions.In this study,the effects of the distance from support on the deflection of mid span are studied in both simply supported and fixed supported girder bridge so as to obtain the appropriate distance from support causing the minimum deflection. 展开更多
关键词 DEFLECTION steel bridge I-shaped girder V-shaped cable pre-tensioning least work
在线阅读 下载PDF
Experimental analysis of additional aerodynamic effects caused by wind-driven rain on bridge main girder 被引量:1
2
作者 LEI Xu SHEN Lian +3 位作者 CHEN Zheng-qing NIU Hua-wei WEI Cheng-long ZHANG Xue-wen 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第8期2743-2756,共14页
To study the additional aerodynamic effect on a bridge girder under the action of wind-driven rain, the rainfall similarity considering raindrop impact and surface water is first given. Then, the dynamic characteristi... To study the additional aerodynamic effect on a bridge girder under the action of wind-driven rain, the rainfall similarity considering raindrop impact and surface water is first given. Then, the dynamic characteristics and the process of vortex and flutter generation of the segment models under different rain intensities and angles of attack are tested by considering several typical main girder sections as examples. The test results indicate that the start and end wind speeds,interval length and number of vortex vibrations remain unchanged when it is raining, rainfall will reduce the windinduced vortex response. When test rain intensity is large, the decrease of amplitude is obvious. However, after considering the rain intensity similarity in this study, all of actual maximum rain intensities after conversion approach the domestic extreme rain intensity of approximately 709 mm/h. It can be observed that rainfall has a limited influence on the dynamic characteristics of the structure and vortex vibration response. When the test rain intensity is 120 mm/h, the critical wind speed of the model flutter increases by 20%-30%. However, after considering the rain intensity similarity ratio, the influence of rainfall on the wind-induced flutter instability of the bridge girder may be ignored. 展开更多
关键词 bridge engineering main girder wind-driven rain similarity law aerodynamic effect
在线阅读 下载PDF
Health monitoring and comparative analysis of time-dependent effect using different prediction models for self-anchored suspension bridge with extra-wide concrete girder 被引量:1
3
作者 ZHOU Guang-pan LI Ai-qun +1 位作者 LI Jian-hui DUAN Mao-jun 《Journal of Central South University》 SCIE EI CAS CSCD 2018年第9期2025-2039,共15页
The structural health status of Hunan Road Bridge during its two-year service period from April 2015 to April 2017 was studied based on monitored data.The Hunan Road Bridge is the widest concrete self-anchored suspens... The structural health status of Hunan Road Bridge during its two-year service period from April 2015 to April 2017 was studied based on monitored data.The Hunan Road Bridge is the widest concrete self-anchored suspension bridge in China at present.Its structural changes and safety were evaluated using the health monitoring data,which included deformations,detailed stresses,and vibration characteristics.The influences of the single and dual effects comprising the ambient temperature changes and concrete shrinkage and creep(S&C)were analyzed based on the measured data.The ANSYS beam finite element model was established and validated by the measured bridge completion state.The comparative analyses of the prediction results of long-term concrete S&C effects were conducted using CEB-FIP 90 and B3 prediction models.The age-adjusted effective modulus method was adopted to simulate the aging behavior of concrete.Prestress relaxation was considered in the stepwise calculation.The results show that the transverse deviations of the towers are noteworthy.The spatial effect of the extra-wide girder is significant,as the compressive stress variations at the girder were uneven along the transverse direction.General increase and decrease in the girder compressive stresses were caused by seasonal ambient warming and cooling,respectively.The temperature gradient effects in the main girder were significant.Comparisons with the measured data showed that more accurate prediction results were obtained with the B3 prediction model,which can consider the concrete material parameters,than with the CEB-FIP 90 model.Significant deflection of the midspan girder in the middle region will be caused by the deviations of the cable anchoring positions at the girder ends and tower tops toward the midspan due to concrete S&C.The increase in the compressive stresses at the top plate and decrease in the stresses at the bottom plate at the middle midspan will be significant.The pre-deviations of the towers toward the sidespan and pre-lift of the midspan girder can reduce the adverse influences of concrete S&C on the structural health of the self-anchored suspension bridge with extra-wide concrete girder. 展开更多
关键词 self-anchored suspension bridge extra-wide concrete girder health monitoring concrete shrinkage and creep prediction model ambient temperature change safety evaluation
在线阅读 下载PDF
Longitudinal forces of continuously welded track on high-speed railway cable-stayed bridge considering impact of adjacent bridges 被引量:33
4
作者 戴公连 闫斌 《Journal of Central South University》 SCIE EI CAS 2012年第8期2348-2353,共6页
A proven beam-track contact model was used to analyze the track-structure interaction of CWR (continuously welded track) on bridge. Considering the impact of adjacent bridges, the tower-cable-track-beam-pier-pile fini... A proven beam-track contact model was used to analyze the track-structure interaction of CWR (continuously welded track) on bridge. Considering the impact of adjacent bridges, the tower-cable-track-beam-pier-pile finite element model of the cable-stayed bridge was established. Taking a bridge group including 40-32m simply-supported beam and (32+80+112)m single-tower cable-stayed bridge and 17-32m simply-supported beam on the Kunming-Shanghai high-speed railway as an example, the characteristics of CWR longitudinal force on the cable-stayed bridge were studied. It is shown that adjacent bridges must be considered in the calculation of the track expansion force and bending force on cable-stayed bridge. When the span amount of adjacent bridges is too numerous, it can be simplified as six spans; the fixed bearing of adjacent simply-supported beams should be placed on the side near the cable-stayed bridge; the track expansion device should be set at the bridge tower to reduce the track force near the bridge abutment. 展开更多
关键词 high-speed railway continuously welded track cable-stayed bridge simply-supported beam
在线阅读 下载PDF
Test and numerical investigations on static and dynamic characteristics of extra-wide concrete self-anchored suspension bridge under vehicle loads 被引量:8
5
作者 ZHOU Guang-pan LI Ai-qun +1 位作者 LI Jian-hui DUAN Mao-jun 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第10期2382-2395,共14页
The present work is aimed at studying the mechanic properties of the extra-wide concrete self-anchored suspension bridge under static and dynamic vehicle loads. Based on the field test using 12 heavy trucks and finite... The present work is aimed at studying the mechanic properties of the extra-wide concrete self-anchored suspension bridge under static and dynamic vehicle loads. Based on the field test using 12 heavy trucks and finite element simulations, the static deformations of different components, stress increments and distributions of the girder, as well as the vibration characteristics and damping ratio of the Hunan Road Bridge were analyzed, which is the widest self-anchored suspension bridge in China at present. The dynamic responses were calculated using the Newmark-β integration method assisted by the simulation models of bridge and vehicles, the influences on the dynamic impact coefficient(DIC) brought by the vehicle parameters, girder width, eccentricity travel and deck flatness were also researched. The spatial effect of the girder is obvious due to the extra width, which performs as the stress increments distribute unevenly along the transverse direction, and the girder deflections and stress increments of the upper plate change as a "V" and "M" shape respectively under the symmetrical vehicle loads affected by the shear lag effect, cross slope and local effect of the wheels, the maximum of stress increments are located in the junctions with the inner webs. The obvious girder torsional deformation and the apparent unevenness of the hanger forces between the two cable planes under the eccentric vehicle loads, together with the mode shapes such as the girder transverse bending and torsion which appear relatively earlier, all reflect the weakened torsional rigidity of the extra-wide girder. The transverse displacements of towers are more obvious than the longitudinal ones. As for the influences on the DIC, the static effect of the heavier vehicles plays a major role when pass through with a higher speed and the changes of vehicle suspension stiffness generate greater impacts than the suspension damp. The values of DIC in the vehicle-running side during the eccentric travel, affected by the restricts from the static effects of the eccentric moving trucks, are significantly smaller than the vehicle-free side, the increase in the road roughness is the most sensitive one among the above influential factors. The results could provide references for the design, static and dynamic response analysis of the similar extra-wide suspension bridges. 展开更多
关键词 self-anchored suspension bridge extra-wide girder field test simulation vehicle loads increments distribution damping ratio mode shape dynamic impact coefficient
在线阅读 下载PDF
Analytical solution to mapping rail deformation under bridge transverse deformation using energy variational principle
6
作者 LAI Zhi-peng JIANG Li-zhong +3 位作者 ZHOU Wang-bao LIU Xiang YU Jian ZHANG Yun-tai 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第8期2654-2664,共11页
The track geometry is a critical factor that affects the running safety and riding comfort of trains moving on a high-speed railway bridge.This study addresses the mapping relationship between the track deformation an... The track geometry is a critical factor that affects the running safety and riding comfort of trains moving on a high-speed railway bridge.This study addresses the mapping relationship between the track deformation and lateral deformations of bridges.Equilibrium equations and natural boundary conditions of the track-bridge system are established based on the energy variational principle,and an analytical solution is derived for the track deformation accounting for lateral bridge deformations.A five-span simply-supported bridge with continuous welded rail has been selected as the case study.The mapping rail deformations are compared to the finite element results,and both results agree well with each other,validating the analytical method proposed in this paper.The influence factors on the mapping rail deformation are further evaluated.Results show that the mapping rail deformation is consistent with the girder displacement at the area that is away from the girder ends when the flexural stiffness ratio between the track and the bridge girder is low.The interlayer stiffness has a significant effect on the mapping rail deformation when the track flexural stiffness is of a high value. 展开更多
关键词 energy variational principle simply-supported beam bridge high-speed railway continuous welded rail mapping rail deformation
在线阅读 下载PDF
高速公路空间大变位桥梁纠偏复位与加固改造方案研究 被引量:1
7
作者 宋重阳 付星燃 高洪波 《世界桥梁》 北大核心 2026年第1期132-137,共6页
某高速公路桥采用左、右分幅多跨40 m预应力混凝土连续T梁,因暴雨导致边坡覆盖层饱水后发生变形,引发桥梁空间大变位,左幅17号墩墩顶处桥面呈V形下凹、主梁现浇连续段竖向开裂。针对病害情况和成因,提出应急防护方案,并在主梁复位保留... 某高速公路桥采用左、右分幅多跨40 m预应力混凝土连续T梁,因暴雨导致边坡覆盖层饱水后发生变形,引发桥梁空间大变位,左幅17号墩墩顶处桥面呈V形下凹、主梁现浇连续段竖向开裂。针对病害情况和成因,提出应急防护方案,并在主梁复位保留利用前提下,对桥墩拆除更换为门架墩(方案一)、桥墩拆除更换为双圆柱墩(方案二)和桥面提吊复位利用原桥墩(方案三)3种加固改造方案进行比选,确定采用方案三进行加固改造,并对临时钢管支撑体系受力状态及体系转换进行计算分析,验证了加固改造方案的合理性和安全性。加固改造施工后荷载试验结果表明:桥梁实测校验系数均小于1,各项指标满足现行规范要求,加固改造效果良好。 展开更多
关键词 公路桥 连续梁桥 边坡变形 空间大变位 开裂 提吊复位 加固改造
在线阅读 下载PDF
节段预制箱梁钢筋部品化、数字化设计方法研究 被引量:1
8
作者 郑和晖 方正 +1 位作者 丁子贤 李刚 《铁道标准设计》 北大核心 2026年第3期100-106,116,共8页
当前节段预制箱梁在铁路桥梁、公路桥梁中的应用越来越多,其钢筋骨架基本依靠人工单根绑扎成型,效率极低且容易出错,亟需结合工业化制造要求进行钢筋部品化、数字化设计。针对这一现状,提出一种节段梁钢筋部品数字化设计方法,该方法按... 当前节段预制箱梁在铁路桥梁、公路桥梁中的应用越来越多,其钢筋骨架基本依靠人工单根绑扎成型,效率极低且容易出错,亟需结合工业化制造要求进行钢筋部品化、数字化设计。针对这一现状,提出一种节段梁钢筋部品数字化设计方法,该方法按照顶板、底板、翼板及腹板等划分区域将钢筋骨架拆分为网片及块体,并基于BIM平台开发节段梁钢筋部品设计软件,该软件通过输入参数创建钢筋部品模型,比选最佳方案,对钢筋部品进行深化设计,输出钢筋料单及加工数据交底。通过在张靖皋长江大桥项目中应用表明,该方法实现快速参数化建模与交底材料输出,钢筋设计与生产端效率分别提高约60%和80%,为后续项目的数字化设计提供参考。 展开更多
关键词 铁路桥梁 公路桥梁 节段梁 BIM 钢筋部品 数字化设计
在线阅读 下载PDF
基于高精度三维扫描的钢梁智能调位一体化控制技术研究及应用
9
作者 王敏 黄涛 樊健生 《桥梁建设》 北大核心 2026年第1期155-161,共7页
为提高装配式钢桥节段钢梁顶推施工焊接前调位精度与效率,提出基于高精度三维扫描的钢梁智能调位一体化控制技术。该技术从减小钢梁调位误差的角度出发,基于三维扫描技术得到高精度点云数据,采用表面重建算法得到带制造误差的带力模型,... 为提高装配式钢桥节段钢梁顶推施工焊接前调位精度与效率,提出基于高精度三维扫描的钢梁智能调位一体化控制技术。该技术从减小钢梁调位误差的角度出发,基于三维扫描技术得到高精度点云数据,采用表面重建算法得到带制造误差的带力模型,模拟钢梁“预拼-调位-拼装”全过程挠度变化,计算得到由制造误差、环境温度变化、支撑条件改变等带来的调位误差,修正调位指令,以减小系统误差;提出以最优化法为核心的智能调位算法,建立梁面测点数据与梁底三向千斤顶调整量的微分运动关系,采用智能调位系统取代人工进行控制点坐标采集和调位控制操作,以减小调位过程中的人为操作误差。为验证该技术的可行性,依托某黄河特大桥进行实际应用。结果表明:采用该智能调位一体化控制技术,焊接面匹配精度为±1 mm,可在5 min内将调位误差控制在±2 mm,较传统方法,该技术不仅提高了施工效率及调位精度,同时提高了焊接平顺度。 展开更多
关键词 装配式钢桥 节段钢梁 顶推施工 三维扫描 带力模型 智能调位系统 钢梁调位
在线阅读 下载PDF
沪渝蓉高铁钟祥汉江特大桥主桥桥型方案研究
10
作者 王存国 唐代伟 +1 位作者 王明亮 王新国 《铁道标准设计》 北大核心 2026年第3期86-92,99,共8页
沪渝蓉高铁钟祥汉江特大桥是沪渝蓉高铁武汉至宜昌段的控制性工程,根据通航及防洪等限制条件,并结合该桥需满足时速350 km无砟轨道技术标准,提出(60+78+270+78+60)m预应力混凝土梁斜拉桥及(142+270+142)m部分斜拉桥两种桥型方案,从结构... 沪渝蓉高铁钟祥汉江特大桥是沪渝蓉高铁武汉至宜昌段的控制性工程,根据通航及防洪等限制条件,并结合该桥需满足时速350 km无砟轨道技术标准,提出(60+78+270+78+60)m预应力混凝土梁斜拉桥及(142+270+142)m部分斜拉桥两种桥型方案,从结构受力、工程规模、施工难度及经济性等方面对上述桥型方案比选分析,并深入分析主梁工后徐变的影响因素。主要结论及创新点如下:(1)两种桥型方案均能满足设计要求,但预应力混凝土梁斜拉桥方案降低线路高程14 m,减小工程整体规模,节省投资约2500万,且工期及景观效果均优于部分斜拉桥方案,综合优势明显,推荐预应力混凝土梁斜拉桥方案作为本工程实施方案;(2)预应力混凝土梁斜拉桥主梁工后徐变受成桥状态、索塔刚度、索塔高度、主梁截面材质及无砟轨道铺设前静置期等因素影响较大,桥梁结构设计中统筹考虑工后徐变变形影响因素,主梁工后徐变变形值控制在25 mm以内。大跨度混凝土桥梁桥型设计及徐变变形控制技术相关成果可为类似工程提供参考借鉴。 展开更多
关键词 高速铁路 桥型方案 混凝土梁斜拉桥 部分斜拉桥 综合比选 徐变变形
在线阅读 下载PDF
基于能量法的隔震连续梁桥抗震加固研究
11
作者 彭刚辉 姚国文 +3 位作者 郑史雄 姚运 贾宏宇 宋安祥 《铁道标准设计》 北大核心 2026年第1期71-78,共8页
隔震连续梁桥广泛应用于铁路及公路交通中,使用年限的增加及地震动作用导致桥墩抗震能力降低,桥墩加固对隔震连续梁桥地震响应的影响需进行系统研究。采用钢管作为加固材料,建立隔震连续梁桥有限元模型;依据不同的加固方案建立9种分析工... 隔震连续梁桥广泛应用于铁路及公路交通中,使用年限的增加及地震动作用导致桥墩抗震能力降低,桥墩加固对隔震连续梁桥地震响应的影响需进行系统研究。采用钢管作为加固材料,建立隔震连续梁桥有限元模型;依据不同的加固方案建立9种分析工况,选用与目标加速度反应谱相匹配的7条地震波,结合能量法进行非线性动力时程分析,对桥梁结构基本周期、滞回耗能、墩底弯矩、墩底剪力及隔震支座受力特性进行研究;选取隔震支座水平剪力及水平位移作为隔震效果评价指标,7条地震波作用平均值作为墩底弯矩及剪力的评价指标。研究结果表明:连续梁桥结构基本周期、隔震支座力学特性及体系滞回耗能与桥墩加固高度、加固墩数量具有相关性,加固高度较大时(H/2),其影响幅值范围为5.74%~20%,桥墩加固对墩底弯矩及剪力的影响幅值范围为1.86%~6.46%;在峰值加速度相同的情况下,地震波对加固后连续梁桥的滞回耗能影响幅值范围为6.88%~8.16%,而桥墩长径比对隔震支座受力特性有较大影响。研究成果可为既有隔震连续梁桥桥墩抗震加固提供借鉴。 展开更多
关键词 隔震连续梁桥 桥墩加固 钢管加固 能量法 滞回耗能 加固高度
在线阅读 下载PDF
接触爆炸作用下RC箱梁桥损伤机理试验与数值模拟研究
12
作者 闫秋实 吕辰旭 +1 位作者 杜修力 李述涛 《土木工程学报》 北大核心 2026年第2期113-125,共13页
作为关键基础设施的钢筋混凝土箱梁桥可能面临潜在的接触爆炸威胁。为揭示钢筋混凝土箱梁桥接触爆炸损伤机理,设计1/4比尺的3跨箱梁桥模型并开展野外化爆试验,分析箱梁桥的动力响应与损伤模式。采用LS-DYNA建立箱梁桥数值模型,通过与试... 作为关键基础设施的钢筋混凝土箱梁桥可能面临潜在的接触爆炸威胁。为揭示钢筋混凝土箱梁桥接触爆炸损伤机理,设计1/4比尺的3跨箱梁桥模型并开展野外化爆试验,分析箱梁桥的动力响应与损伤模式。采用LS-DYNA建立箱梁桥数值模型,通过与试验结果对比,验证数值模型准确性。基于数值模型分析箱梁内应力波传播过程,探究箱梁桥局部化损伤形成机制,并参数分析腹板高厚比、TNT装药质量对箱梁局部化损伤的影响。研究结果表明:接触爆炸下RC箱梁呈现典型局部化损伤模式,整体结构响应相对轻微。高强压缩波造成迎爆面的开坑、顶板贯穿孔洞及腹板的破裂,穿过腹板的压缩波在底板自由表面反射形成拉伸波导致背爆面的层裂剥落。增大腹板高厚比能够减弱反射拉伸波的强度,进而减小或避免RC箱梁背爆面层裂剥落损伤,在抗爆设计中应注意控制腹板高厚比在合理范围。线性拟合得到的局部损伤特征尺寸与高厚比、装药质量之间的关系式可为实际桥梁工程抗爆防护设计及应急抢修提供参考。 展开更多
关键词 钢筋混凝土箱梁桥 接触爆炸试验 数值模拟 损伤机理 应力波
在线阅读 下载PDF
湖北观音寺长江大桥主桥纵向约束体系研究
13
作者 李秋 刘新华 +2 位作者 冯鹏程 易蓓 欧阳泽卉 《桥梁建设》 北大核心 2026年第1期9-16,共8页
湖北观音寺长江大桥主桥为主跨跨径1160 m的双塔双索面混合梁斜拉桥,边跨377 m长主梁采用预应力混凝土整体式箱梁,中跨1106 m长主梁采用钢-UHPC组合梁,为寻求该桥优异的静、动力性能,对其纵向约束体系进行研究。通过MIDAS Civil软件建... 湖北观音寺长江大桥主桥为主跨跨径1160 m的双塔双索面混合梁斜拉桥,边跨377 m长主梁采用预应力混凝土整体式箱梁,中跨1106 m长主梁采用钢-UHPC组合梁,为寻求该桥优异的静、动力性能,对其纵向约束体系进行研究。通过MIDAS Civil软件建立主桥有限元模型,对采用常规半飘浮体系、固结体系、弹性约束体系、阻尼约束体系的主桥静、动力性能进行对比分析,在此基础上,结合弹性约束体系和阻尼约束体系的特点,提出可同时兼顾结构静、动力性能的弹簧+阻尼复合约束体系,并进行静、动力参数取值分析。结果表明:采用常规纵向约束体系均无法兼顾该桥的静、动力性能;弹簧+阻尼复合约束体系中弹簧刚度K取4000 kN/m、阻尼系数C取4100 kN·(m/s)-α、速度指数α取0.3时,主桥静、动力性能得到综合改善,同时弹簧力及阻尼力吨位满足复合约束装置的制造要求;采用弹簧+阻尼复合约束体系后,该桥静力下梁端纵向位移幅值减小24.7%、塔顶纵向位移幅值减小22.4%、塔底纵向弯矩幅值减小10.9%,E2地震作用下梁端纵向位移幅值减小78.6%、塔顶纵向位移幅值减小77.2%、塔底纵向弯矩幅值减小56.2%。 展开更多
关键词 斜拉桥 钢-UHPC组合梁 纵向约束体系 弹簧+阻尼复合约束体系 静动力性能 参数分析
在线阅读 下载PDF
冻融循环和低温对减隔震连续梁桥抗震性能的耦合影响研究
14
作者 王志刚 舒泽凯 徐艳 《世界桥梁》 北大核心 2026年第2期83-90,共8页
为研究冻融循环和低温对减隔震连续梁桥抗震性能的耦合影响,以位于高寒高烈度地区的减隔震连续梁桥——新疆永丰1号大桥为背景,分析2种因素耦合作用对桥梁抗震能力及地震响应的影响。首先进行桥墩混凝土冻融试验,给出考虑冻融循环的混... 为研究冻融循环和低温对减隔震连续梁桥抗震性能的耦合影响,以位于高寒高烈度地区的减隔震连续梁桥——新疆永丰1号大桥为背景,分析2种因素耦合作用对桥梁抗震能力及地震响应的影响。首先进行桥墩混凝土冻融试验,给出考虑冻融循环的混凝土材料参数修正公式,基于界限设计方法确定高阻尼隔震橡胶支座在各温度下的支座力学参数修正值;然后建立考虑环境因素作用下材料性能变化的有限元模型,进行桥墩截面弯矩~曲率分析,得到不同冻融循环条件下的抗震能力,进行全桥非线性分析得到不同温度和冻融循环条件下的桥梁自振周期、桥墩及支座地震响应,并计算桥墩抗弯能需比。结果表明:随冻融循环次数增多,混凝土桥墩截面的等效屈服弯矩和极限弯矩减小,抗震能力下降;桥梁自振周期主要受低温影响而下降,墩底弯矩受低温影响而增大、受冻融循环的影响较小,低温和冻融循环均会增大墩顶位移且存在相互放大效应;支座的地震响应主要受温度影响,低温作用下支座剪力增大而位移减小,滞回曲线更饱满;温度下降和冻融循环次数增大均会降低墩底弯矩能需比,最大降幅可达27.3%。 展开更多
关键词 连续梁桥 减隔震 冻融循环 低温 抗震性能 参数修正 非线性时程分析
在线阅读 下载PDF
界面抗剪连接状态对UHPC组合箱梁桥受力性能的影响
15
作者 方志 袁英婵 +4 位作者 蒋健才 洪金圣 钟启华 王启吾 袁程 《铁道科学与工程学报》 北大核心 2026年第3期1243-1256,共14页
为明确界面抗剪连接状态对预应力超高性能混凝土(ultra-high performance concrete,UHPC)竖向分层组合箱梁桥组合界面和整桥结构受力性能的影响,以一座预制拼装预应力UHPC连续组合箱梁桥为实例,对其进行成桥静力加载试验,测试并分析UHP... 为明确界面抗剪连接状态对预应力超高性能混凝土(ultra-high performance concrete,UHPC)竖向分层组合箱梁桥组合界面和整桥结构受力性能的影响,以一座预制拼装预应力UHPC连续组合箱梁桥为实例,对其进行成桥静力加载试验,测试并分析UHPC组合箱梁桥的受力性能,建立全桥参数化有限元模型并以实测结果验证了模型的适用性。在此基础上,分析了UHPC组合箱梁界面剪力连接度η和集束度γ对UHPC组合箱梁桥受力性能的影响。成桥试验和有限元分析结果表明:1)UHPC组合箱梁实桥结构的整体受力性能良好,梯道和桥面铺装对主体结构受力性能影响较小;2)随着剪力连接度的增加,UHPC竖向分层组合连续箱梁桥的竖向抗弯刚度和界面剪力键所受剪力相应增加,当剪力连接度η大于0.7后,竖弯刚度和剪力键所受剪力的增长幅度均小于5%,因此UHPC竖向分层组合梁的设计剪力连接度η不应小于0.7;3)随着界面剪力键布置的集束度增加,UHPC竖向分层组合连续箱梁桥的竖向抗弯刚度明显降低,单个剪力键所受剪力不断增加且其分布更趋不均匀。当集束度大于0.1时,组合箱梁桥竖弯刚度的降低幅度超过10%,故组合箱梁界面剪力键布置的集束度γ不应大于0.1,或剪力键中心距不应大于梁跨的1/16。研发的预应力UHPC竖向分层连续组合箱梁结构在预制拼装桥梁工程中具有良好的适用性。 展开更多
关键词 桥梁工程 组合箱梁桥 桥梁测试 数值分析 超高性能混凝土(UHPC) 剪力连接度 集束度
在线阅读 下载PDF
预制拼装UHPC节段薄壁箱梁抗弯性能
16
作者 赵华 罗穗 +4 位作者 胡俊德 罗梓豪 钱煌果 廖志练 扈振涛 《湖南大学学报(自然科学版)》 北大核心 2026年第3期16-25,共10页
为研究预制拼装UHPC节段薄壁箱梁桥的抗弯性能,以一座102 m跨径的节段拼装体外预应力UHPC薄壁箱梁桥为基础,通过对实际桥梁薄壁箱梁截面进行工字形截面等效处理,对3片节段梁(3∶20的体外预应力UHPC节段梁)开展四点弯曲试验,研究了不同... 为研究预制拼装UHPC节段薄壁箱梁桥的抗弯性能,以一座102 m跨径的节段拼装体外预应力UHPC薄壁箱梁桥为基础,通过对实际桥梁薄壁箱梁截面进行工字形截面等效处理,对3片节段梁(3∶20的体外预应力UHPC节段梁)开展四点弯曲试验,研究了不同胶接缝形式对节段梁抗弯性能的影响,获得了破坏模式、接缝张开宽度、挠度等相关试验结果.试验结果表明,节段梁的主要薄弱位置为接缝及其附近区域,其余位置的UHPC基体几乎无裂缝.提出了UHPC节段箱梁刚度的计算模型,该模型能够较为准确地预测UHPC节段箱梁的刚度.本研究可为UHPC节段薄壁箱梁桥的推广与发展提供参考,丰富体外预应力胶接缝UHPC节段梁的计算理论. 展开更多
关键词 桥梁工程 UHPC薄壁箱梁 节段梁 抗弯性能
在线阅读 下载PDF
钢-混组合桥面板组合梁桥荷载横向分布系数研究
17
作者 张天航 吴怿珊 +1 位作者 张建勋 王嘉锋 《世界桥梁》 北大核心 2026年第1期115-122,共8页
为确保钢-混组合桥面板组合梁桥的安全性与经济性,对其荷载横向分布系数及影响因素进行研究。以河南省道S541梅山西沟段中桥(跨径20 m的钢-混组合桥面板工字形组合梁桥)为背景,建立有限元模型计算荷载横向分布系数,并与偏心压力法、修... 为确保钢-混组合桥面板组合梁桥的安全性与经济性,对其荷载横向分布系数及影响因素进行研究。以河南省道S541梅山西沟段中桥(跨径20 m的钢-混组合桥面板工字形组合梁桥)为背景,建立有限元模型计算荷载横向分布系数,并与偏心压力法、修正偏心压力法和刚接梁法进行对比;进一步研究横梁构造形式及数量、桥面板混凝土厚度、桥面板纵向开裂对荷载横向分布系数的影响。结果表明:刚接梁法计算结果与有限元法最为接近;横梁构造形式相同时,中横梁数量增加,边主梁荷载横向分布系数相对只有端横梁时增大,最大增大0.83%,而中主梁则会降低,最大降低1.40%;横梁数量相同时,采用K形钢桁架横梁时边主梁荷载横向分布系数最佳,而采用H形框架式支撑横梁时中主梁荷载横向分布系数最佳;桥面板混凝土厚度每增加30 mm,边、中主梁荷载横向分布系数分别平均降低0.88%和0.83%;当组合桥面板纵向开裂后,边主梁荷载横向分布系数降低且降低幅度随横梁数量增加而递减,而中主梁荷载横向分布系数增加且增加幅度随横梁数量的增加而上升。 展开更多
关键词 组合梁桥 钢-混组合桥面板 荷载横向分布系数 横梁 刚接梁法 影响因素 有限元法
在线阅读 下载PDF
观音寺长江大桥主桥主梁设计
18
作者 欧阳泽卉 李秋 +1 位作者 刘新华 冯鹏程 《世界桥梁》 北大核心 2026年第2期23-30,共8页
观音寺长江大桥主桥为(62+64+2×72+80+1 160+96+72+2×64+54) m混合式组合梁双塔双索面斜拉桥,主梁宽度为41.0 m,中心高度为4.0 m。中跨为钢-UHPC组合梁结构,标准节段长度为14 m,根据梁段受力不同采用了2种组合梁型,其UHPC层... 观音寺长江大桥主桥为(62+64+2×72+80+1 160+96+72+2×64+54) m混合式组合梁双塔双索面斜拉桥,主梁宽度为41.0 m,中心高度为4.0 m。中跨为钢-UHPC组合梁结构,标准节段长度为14 m,根据梁段受力不同采用了2种组合梁型,其UHPC层标准厚度分别为6 cm和17 cm,材料等级均为UC160,组合梁的钢结构采用箱形结构,由顶底板、边中腹板、小纵梁、横隔板、索梁锚固构造、风嘴等组成,材质有Q370qD、Q420qD及Q500qD三种。边跨采用刚度大、经济性好的预应力混凝土箱梁,材料等级为C60混凝土,标准节段长度为8 m,采用短线法预制拼装施工。在中跨侧距离桥塔27 m的位置设置结合段,通过构造细节处理确保预应力混凝土箱梁与钢-UHPC组合梁2种主梁结构传力安全、可靠。 展开更多
关键词 斜拉桥 钢-UHPC组合梁 混凝土箱梁 结合段 结构设计 有限元法
在线阅读 下载PDF
大跨钢桁梁斜拉桥新型索梁锚固结构缩尺模型疲劳试验研究
19
作者 罗永传 梁晓翀 +2 位作者 刘红胜 张清华 崔闯 《世界桥梁》 北大核心 2026年第1期68-74,共7页
针对大跨钢桁梁斜拉桥索梁锚固区应力集中和疲劳问题,以主跨880 m的双层钢桁梁公路斜拉桥——中山市香山大桥为背景,提出一种新型钢锚箱式索梁锚固结构:在传统钢锚箱结构基础上,延长钢锚箱的顶、底板并在端部增加端板。开展该新型索梁... 针对大跨钢桁梁斜拉桥索梁锚固区应力集中和疲劳问题,以主跨880 m的双层钢桁梁公路斜拉桥——中山市香山大桥为背景,提出一种新型钢锚箱式索梁锚固结构:在传统钢锚箱结构基础上,延长钢锚箱的顶、底板并在端部增加端板。开展该新型索梁锚固结构1∶2缩尺模型疲劳试验,在此基础上结合数值分析方法对其疲劳性能进行评估。结果表明:在疲劳性能验证阶段试验和疲劳破坏阶段试验中,在一定次数循环荷载作用后静载测试数据稳定,钢锚箱结构完整,其抗疲劳性能满足设计要求,且安全储备高;钢锚箱主要传力焊缝受力分布不均匀性明显改善,有效提高了其疲劳强度;通过疲劳性能评估,268万次循环加载下对应的等效应力幅为59 MPa,低于规范限值125 MPa,总体疲劳损伤度为0.226,仍有约77%的剩余疲劳寿命,该新型钢锚箱结构疲劳强度高于抗疲劳设计的要求,且具有足够的疲劳强度安全储备。 展开更多
关键词 斜拉桥 公路桥 索梁锚固区 钢锚箱式锚固结构 疲劳性能 模型试验
在线阅读 下载PDF
高原铁路悬索桥钢桁梁吊装施工的峡谷风效应
20
作者 叶华文 李艳哲 +3 位作者 杨喆 王熊珏 雷聪 李鑫 《铁道工程学报》 北大核心 2026年第1期46-53,共8页
研究目的:高海拔深切峡谷山区地形复杂多变,其风场具有明显的三维空间分布特征,给大跨悬索桥施工带来巨大的安全风险。本文基于典型深大峡谷山区风非均匀特性,提出加劲梁上线性变化的等效静阵风风速分布模型,然后以高海拔山区深切峡谷... 研究目的:高海拔深切峡谷山区地形复杂多变,其风场具有明显的三维空间分布特征,给大跨悬索桥施工带来巨大的安全风险。本文基于典型深大峡谷山区风非均匀特性,提出加劲梁上线性变化的等效静阵风风速分布模型,然后以高海拔山区深切峡谷中某千米级主跨铁路悬索桥加劲梁吊装施工为工程背景,建立空间有限元模型进行大节段加劲梁吊装架设阶段的倒拆分析,对合理成桥状态和施工过程中非均匀风载对关键构件的受力和变形的影响进行对比分析。研究结论:(1)非均匀分布的峡谷风对大节段钢桁梁吊装施工过程中悬索桥结构受力和变形的影响很小;(2)梁段间临时连接方式主要受竖向力控制,非均匀风载不影响临时铰处下弦杆开口间隙变化和刚接时机;(3)与相应均匀风工况相比,非均匀风荷载下临时铰轴力增大10%,剪力增大1倍,需要在设计中关注;(4)本研究成果可为非均匀分布的峡谷风对大节段吊装施工过程中结构的影响分析提供参考。 展开更多
关键词 铁路悬索桥 钢桁梁 大节段吊装 深切峡谷 临时铰 刚接时机
在线阅读 下载PDF
上一页 1 2 173 下一页 到第
使用帮助 返回顶部