To seek effective ways of lowering development cost and tapping inter-well remaining reserves, sidetracking horizontal wells from old wells in Su10 and Su53 Block were conducted. The engineering and geological problem...To seek effective ways of lowering development cost and tapping inter-well remaining reserves, sidetracking horizontal wells from old wells in Su10 and Su53 Block were conducted. The engineering and geological problems such as leakage, collapse and sticking in slim-hole sidetracking, and difficult evaluation of remaining gas were gradually overcome, and a set of drilling and completion technology, well deployment optimization technology and geo-steering technology suitable for sidetracking horizontal wells in tight sandstone gas reservoirs have been worked out. By making full use of the old well, sidetracking horizontal wells can greatly reduce development costs, enhance the producing degree of inter-well remaining reserves, and get production 3-5 times of that of adjacent vertical wells.Its production effect is influenced by encountered sandstone length, the position of the horizontal segment in the reservoir, produced effective reservoir thickness, gas saturation, controlled reserves and fracturing effect, etc. Up to now, in Block Su10 and Su53, 12 sidetracking horizontal wells have been drilled, which have an average drilling cycle of 49 days, average horizontal section length of 689 m,average effective drilling ratio of 61.5%, average well-head pressure of 16.2 MPa, and daily output of 4.7×10~4 m^3 at the initial stage after production. By the end of 2017, the average yield increment was more than 1 000×10~4 m^3 with good effect. With the increase of low yield old wells, wells in the enrichment regions tend to be saturated and the rest gas-bearing areas are lower in grade, therefore, sidetracking horizontal well can be used for optimization of well pattern, well deployment mode and exploitation of remaining oil areas.展开更多
A flexible sidetracking stimulation technology of horizontal wells is formed to develop the lateral deep remaining oil and gas resources of the low-permeability mature oilfields.This technology first uses the flexible...A flexible sidetracking stimulation technology of horizontal wells is formed to develop the lateral deep remaining oil and gas resources of the low-permeability mature oilfields.This technology first uses the flexible sidetracking tool to achieve low-cost sidetracking in the old wellbore,and then uses the hydraulic jet technology to induce multiple fractures to fracture.Finally,the bullhead fracturing of multi-cluster temporary plugging for the sidetracking hole is carried out by running the tubing string,to realize the efficient development of the remaining reserves among the wells.The flexible sidetracking stimulation technology involves flexible sidetracking horizontal wells drilling and sidetracking horizontal well fracturing.The flexible sidetracking horizontal well drilling includes three aspects:flexible drill pipe structure and material optimization,drilling technology,and sealed coring tool.The sidetracking horizontal well fracturing includes two aspects:fracturing scheme optimization,fracturing tools and implementation process optimization.The technology has been conducted several rounds of field tests in the Ansai Oilfield of Changqing,China.The results show that by changing well type and reducing row spacing of oil and water wells,the pressure displacement system can be well established to achieve effective pressure transmission and to achieve the purpose of increasing liquid production in low-yield and low-efficiency wells.It is verified that the flexible sidetracking stimulation technology can provide favorable support for accurately developing remaining reserves in low-permeability reservoirs.展开更多
In this paper, by in-depth geological research of Kalamkas Oilfield in Central Asia, the geological body has been re-ascertained; combined with fine study of reservoir engineering, based on the understanding of the di...In this paper, by in-depth geological research of Kalamkas Oilfield in Central Asia, the geological body has been re-ascertained; combined with fine study of reservoir engineering, based on the understanding of the distribution of remaining oil horizontal wells have been given full play to stabilizing oil production and controlling water cut, reducing the producing pressure drop, improving well productivity and other advantages, and the development and deployment has been optimized; horizontal wells have been applied to solve problems such as old well casing damages, shutting down wells, low-productivity and low- efficiency wells, and high water cut wells to improve the utilization rate of old wells; through separate layer system improved injection production pattern, adjustment wells have been optimized and deployed, and part measures wells have been preferably selected to tap the residual oil improve the degree of reserves control realize the stabilization of oil production and control of water cut in an old oilfield, and further improve the development effects.展开更多
基金Supported by the Project of Great Wall Drilling Company in CNPC(2015A25-2(2012))
文摘To seek effective ways of lowering development cost and tapping inter-well remaining reserves, sidetracking horizontal wells from old wells in Su10 and Su53 Block were conducted. The engineering and geological problems such as leakage, collapse and sticking in slim-hole sidetracking, and difficult evaluation of remaining gas were gradually overcome, and a set of drilling and completion technology, well deployment optimization technology and geo-steering technology suitable for sidetracking horizontal wells in tight sandstone gas reservoirs have been worked out. By making full use of the old well, sidetracking horizontal wells can greatly reduce development costs, enhance the producing degree of inter-well remaining reserves, and get production 3-5 times of that of adjacent vertical wells.Its production effect is influenced by encountered sandstone length, the position of the horizontal segment in the reservoir, produced effective reservoir thickness, gas saturation, controlled reserves and fracturing effect, etc. Up to now, in Block Su10 and Su53, 12 sidetracking horizontal wells have been drilled, which have an average drilling cycle of 49 days, average horizontal section length of 689 m,average effective drilling ratio of 61.5%, average well-head pressure of 16.2 MPa, and daily output of 4.7×10~4 m^3 at the initial stage after production. By the end of 2017, the average yield increment was more than 1 000×10~4 m^3 with good effect. With the increase of low yield old wells, wells in the enrichment regions tend to be saturated and the rest gas-bearing areas are lower in grade, therefore, sidetracking horizontal well can be used for optimization of well pattern, well deployment mode and exploitation of remaining oil areas.
基金Supported by the National Key Research and Development Program of China(2023YFF0615403)CNPC Science and Technology Project(2023ZZ0803).
文摘A flexible sidetracking stimulation technology of horizontal wells is formed to develop the lateral deep remaining oil and gas resources of the low-permeability mature oilfields.This technology first uses the flexible sidetracking tool to achieve low-cost sidetracking in the old wellbore,and then uses the hydraulic jet technology to induce multiple fractures to fracture.Finally,the bullhead fracturing of multi-cluster temporary plugging for the sidetracking hole is carried out by running the tubing string,to realize the efficient development of the remaining reserves among the wells.The flexible sidetracking stimulation technology involves flexible sidetracking horizontal wells drilling and sidetracking horizontal well fracturing.The flexible sidetracking horizontal well drilling includes three aspects:flexible drill pipe structure and material optimization,drilling technology,and sealed coring tool.The sidetracking horizontal well fracturing includes two aspects:fracturing scheme optimization,fracturing tools and implementation process optimization.The technology has been conducted several rounds of field tests in the Ansai Oilfield of Changqing,China.The results show that by changing well type and reducing row spacing of oil and water wells,the pressure displacement system can be well established to achieve effective pressure transmission and to achieve the purpose of increasing liquid production in low-yield and low-efficiency wells.It is verified that the flexible sidetracking stimulation technology can provide favorable support for accurately developing remaining reserves in low-permeability reservoirs.
文摘In this paper, by in-depth geological research of Kalamkas Oilfield in Central Asia, the geological body has been re-ascertained; combined with fine study of reservoir engineering, based on the understanding of the distribution of remaining oil horizontal wells have been given full play to stabilizing oil production and controlling water cut, reducing the producing pressure drop, improving well productivity and other advantages, and the development and deployment has been optimized; horizontal wells have been applied to solve problems such as old well casing damages, shutting down wells, low-productivity and low- efficiency wells, and high water cut wells to improve the utilization rate of old wells; through separate layer system improved injection production pattern, adjustment wells have been optimized and deployed, and part measures wells have been preferably selected to tap the residual oil improve the degree of reserves control realize the stabilization of oil production and control of water cut in an old oilfield, and further improve the development effects.