Aiming at tracking control of a class of innovative control effector(ICE) aircraft with distributed arrays of actuators, this paper proposes a control allocation scheme based on the Lévy flight.Different from the...Aiming at tracking control of a class of innovative control effector(ICE) aircraft with distributed arrays of actuators, this paper proposes a control allocation scheme based on the Lévy flight.Different from the conventional aircraft control allocation problem,the particular characteristic of actuators makes the actuator control command totally subject to integer constraints. In order to tackle this problem, first, the control allocation problem is described as an integer programming problem with two desired objectives. Then considering the requirement of real-time, a metaheuristic algorithm based on the Lévy flight is introduced to tackling this problem. In order to improve the searching efficiency, several targeted and heuristic strategies including variable step length and inherited population initialization according to feedback and so on are designed. Moreover, to prevent the incertitude of the metaheuristic algorithm and ensure the flight stability, a guaranteed control strategy is designed. Finally, a time-varying simulation model is introduced to verifying the effectiveness of the proposed scheme. The contrastive simulation results indicate that the proposed scheme achieves superior tracking performance with appropriate actuator dynamics and computational time, and the improvements for efficiency are active and the parameter settings are reasonable.展开更多
This research develops a comprehensive method to solve a combinatorial problem consisting of distribution system reconfiguration, capacitor allocation, and renewable energy resources sizing and siting simultaneously a...This research develops a comprehensive method to solve a combinatorial problem consisting of distribution system reconfiguration, capacitor allocation, and renewable energy resources sizing and siting simultaneously and to improve power system's accountability and system performance parameters. Due to finding solution which is closer to realistic characteristics, load forecasting, market price errors and the uncertainties related to the variable output power of wind based DG units are put in consideration. This work employs NSGA-II accompanied by the fuzzy set theory to solve the aforementioned multi-objective problem. The proposed scheme finally leads to a solution with a minimum voltage deviation, a maximum voltage stability, lower amount of pollutant and lower cost. The cost includes the installation costs of new equipment, reconfiguration costs, power loss cost, reliability cost, cost of energy purchased from power market, upgrade costs of lines and operation and maintenance costs of DGs. Therefore, the proposed methodology improves power quality, reliability and security in lower costs besides its preserve, with the operational indices of power distribution networks in acceptable level. To validate the proposed methodology's usefulness, it was applied on the IEEE 33-bus distribution system then the outcomes were compared with initial configuration.展开更多
Based on the theory of complex adaptive system(CAS),the optimal allocation model of water resources in sewage irrigation areas was established,which provided new ideas and application value for the rational utilizatio...Based on the theory of complex adaptive system(CAS),the optimal allocation model of water resources in sewage irrigation areas was established,which provided new ideas and application value for the rational utilization of agricultural production and waste water resources.The results demonstrated that the difference of crop energy capture mainly depended on the development stage.Waste water with a certain concentration was able to promote crop growth,while excessive concentration inhibited crop growth.The correlation between water absorption rate and leaf area index was close(R=0.9498,p<0.01).The amount of bad seeds increased at a speed of 34.7·d^-1,when system irrigated randomly in the seedling stage,while it tended to remain stable at a speed of 0.3·d^-1 after plants entering the mature stage which impacted the total yields of crops.展开更多
Resource allocation for an equipment development task is a complex process owing to the inherent characteristics,such as large amounts of input resources,numerous sub-tasks,complex network structures,and high degrees ...Resource allocation for an equipment development task is a complex process owing to the inherent characteristics,such as large amounts of input resources,numerous sub-tasks,complex network structures,and high degrees of uncertainty.This paper presents an investigation into the influence of resource allocation on the duration and cost of sub-tasks.Mathematical models are constructed for the relationships of the resource allocation quantity with the duration and cost of the sub-tasks.By considering the uncertainties,such as fluctuations in the sub-task duration and cost,rework iterations,and random overlaps,the tasks are simulated for various resource allocation schemes.The shortest duration and the minimum cost of the development task are first formulated as the objective function.Based on a multi-objective particle swarm optimization(MOPSO)algorithm,a multi-objective evolutionary algorithm is constructed to optimize the resource allocation scheme for the development task.Finally,an uninhabited aerial vehicle(UAV)is considered as an example of a development task to test the algorithm,and the optimization results of this method are compared with those based on non-dominated sorting genetic algorithm-II(NSGA-II),non-dominated sorting differential evolution(NSDE)and strength pareto evolutionary algorithm-II(SPEA-II).The proposed method is verified for its scientific approach and effectiveness.The case study shows that the optimization of the resource allocation can greatly aid in shortening the duration of the development task and reducing its cost effectively.展开更多
The control allocation problem of aircraft whose control inputs contain integer constraints is investigated. The control allocation problem is described as an integer programming problem and solved by the cuckoo searc...The control allocation problem of aircraft whose control inputs contain integer constraints is investigated. The control allocation problem is described as an integer programming problem and solved by the cuckoo search algorithm. In order to enhance the search capability of the cuckoo search algorithm, the adaptive detection probability and amplification factor are designed. Finally, the control allocation method based on the proposed improved cuckoo search algorithm is applied to the tracking control problem of the innovative control effector aircraft. The comparative simulation results demonstrate the superiority and effectiveness of the proposed improved cuckoo search algorithm in control allocation of aircraft.展开更多
Software testing is a very important phase of the software development process. It is a very difficult job for a software manager to allocate optimally the financial budget to a software project during testing. In thi...Software testing is a very important phase of the software development process. It is a very difficult job for a software manager to allocate optimally the financial budget to a software project during testing. In this paper the problem of optimal allocation of the software testing cost is studied. There exist several models focused on the development of software costs measuring the number of software errors remaining in the software during testing. The purpose of this paper is to use these models to formulate the optimization problems of resource allocation: Minimization of the total number of software errors remaining in the system. On the assumption that a software project consists of some independent modules, the presented approach extends previous work by defining new goal functions and extending the primary assumption and precondition.展开更多
A quality of service(QoS) guaranteed cross-layer resource allocation algorithm with physical layer, medium access control(MAC) layer and call admission control(CAC) considered simultaneously is proposed for the ...A quality of service(QoS) guaranteed cross-layer resource allocation algorithm with physical layer, medium access control(MAC) layer and call admission control(CAC) considered simultaneously is proposed for the full IP orthogonal frequency division multiple access(OFDMA) communication system, which can ensure the quality of multimedia services in full IP networks.The algorithm converts the physical layer resources such as subcarriers, transmission power, and the QoS metrics into equivalent bandwidth which can be distributed by the base station in all three layers. By this means, the QoS requirements in terms of bit error rate(BER), transmission delay and dropping probability can be guaranteed by the cross-layer optimal equivalent bandwidth allocation. The numerical results show that the proposed algorithm has higher spectrum efficiency compared to the existing systems.展开更多
基金supported by the National Natural Science Foundation of China(61803357)。
文摘Aiming at tracking control of a class of innovative control effector(ICE) aircraft with distributed arrays of actuators, this paper proposes a control allocation scheme based on the Lévy flight.Different from the conventional aircraft control allocation problem,the particular characteristic of actuators makes the actuator control command totally subject to integer constraints. In order to tackle this problem, first, the control allocation problem is described as an integer programming problem with two desired objectives. Then considering the requirement of real-time, a metaheuristic algorithm based on the Lévy flight is introduced to tackling this problem. In order to improve the searching efficiency, several targeted and heuristic strategies including variable step length and inherited population initialization according to feedback and so on are designed. Moreover, to prevent the incertitude of the metaheuristic algorithm and ensure the flight stability, a guaranteed control strategy is designed. Finally, a time-varying simulation model is introduced to verifying the effectiveness of the proposed scheme. The contrastive simulation results indicate that the proposed scheme achieves superior tracking performance with appropriate actuator dynamics and computational time, and the improvements for efficiency are active and the parameter settings are reasonable.
文摘This research develops a comprehensive method to solve a combinatorial problem consisting of distribution system reconfiguration, capacitor allocation, and renewable energy resources sizing and siting simultaneously and to improve power system's accountability and system performance parameters. Due to finding solution which is closer to realistic characteristics, load forecasting, market price errors and the uncertainties related to the variable output power of wind based DG units are put in consideration. This work employs NSGA-II accompanied by the fuzzy set theory to solve the aforementioned multi-objective problem. The proposed scheme finally leads to a solution with a minimum voltage deviation, a maximum voltage stability, lower amount of pollutant and lower cost. The cost includes the installation costs of new equipment, reconfiguration costs, power loss cost, reliability cost, cost of energy purchased from power market, upgrade costs of lines and operation and maintenance costs of DGs. Therefore, the proposed methodology improves power quality, reliability and security in lower costs besides its preserve, with the operational indices of power distribution networks in acceptable level. To validate the proposed methodology's usefulness, it was applied on the IEEE 33-bus distribution system then the outcomes were compared with initial configuration.
基金Supported by the Science and Technology Research Project of the Ministry of Education(14YJCZH017)the Major State Basic Research Development Program of China(973 Program)(2017YFC0404503)+1 种基金Key Cultivation Project of Lingnan Normal University in 2019(LZ1903)Lingnan Normal University Special Talent Program(ZL2007)
文摘Based on the theory of complex adaptive system(CAS),the optimal allocation model of water resources in sewage irrigation areas was established,which provided new ideas and application value for the rational utilization of agricultural production and waste water resources.The results demonstrated that the difference of crop energy capture mainly depended on the development stage.Waste water with a certain concentration was able to promote crop growth,while excessive concentration inhibited crop growth.The correlation between water absorption rate and leaf area index was close(R=0.9498,p<0.01).The amount of bad seeds increased at a speed of 34.7·d^-1,when system irrigated randomly in the seedling stage,while it tended to remain stable at a speed of 0.3·d^-1 after plants entering the mature stage which impacted the total yields of crops.
基金supported by the National Natural Science Foundation of China(71690233)
文摘Resource allocation for an equipment development task is a complex process owing to the inherent characteristics,such as large amounts of input resources,numerous sub-tasks,complex network structures,and high degrees of uncertainty.This paper presents an investigation into the influence of resource allocation on the duration and cost of sub-tasks.Mathematical models are constructed for the relationships of the resource allocation quantity with the duration and cost of the sub-tasks.By considering the uncertainties,such as fluctuations in the sub-task duration and cost,rework iterations,and random overlaps,the tasks are simulated for various resource allocation schemes.The shortest duration and the minimum cost of the development task are first formulated as the objective function.Based on a multi-objective particle swarm optimization(MOPSO)algorithm,a multi-objective evolutionary algorithm is constructed to optimize the resource allocation scheme for the development task.Finally,an uninhabited aerial vehicle(UAV)is considered as an example of a development task to test the algorithm,and the optimization results of this method are compared with those based on non-dominated sorting genetic algorithm-II(NSGA-II),non-dominated sorting differential evolution(NSDE)and strength pareto evolutionary algorithm-II(SPEA-II).The proposed method is verified for its scientific approach and effectiveness.The case study shows that the optimization of the resource allocation can greatly aid in shortening the duration of the development task and reducing its cost effectively.
基金supported by the National Natural Science Foundation of China(61273083 and 61374012)
文摘The control allocation problem of aircraft whose control inputs contain integer constraints is investigated. The control allocation problem is described as an integer programming problem and solved by the cuckoo search algorithm. In order to enhance the search capability of the cuckoo search algorithm, the adaptive detection probability and amplification factor are designed. Finally, the control allocation method based on the proposed improved cuckoo search algorithm is applied to the tracking control problem of the innovative control effector aircraft. The comparative simulation results demonstrate the superiority and effectiveness of the proposed improved cuckoo search algorithm in control allocation of aircraft.
文摘Software testing is a very important phase of the software development process. It is a very difficult job for a software manager to allocate optimally the financial budget to a software project during testing. In this paper the problem of optimal allocation of the software testing cost is studied. There exist several models focused on the development of software costs measuring the number of software errors remaining in the software during testing. The purpose of this paper is to use these models to formulate the optimization problems of resource allocation: Minimization of the total number of software errors remaining in the system. On the assumption that a software project consists of some independent modules, the presented approach extends previous work by defining new goal functions and extending the primary assumption and precondition.
基金supported by the National Natural Science Foundation of China(61271235)the Project Funded by the Priority Academic Program Development of Jiangsu Higher Education Institutions-Information and Communication Engineering
文摘A quality of service(QoS) guaranteed cross-layer resource allocation algorithm with physical layer, medium access control(MAC) layer and call admission control(CAC) considered simultaneously is proposed for the full IP orthogonal frequency division multiple access(OFDMA) communication system, which can ensure the quality of multimedia services in full IP networks.The algorithm converts the physical layer resources such as subcarriers, transmission power, and the QoS metrics into equivalent bandwidth which can be distributed by the base station in all three layers. By this means, the QoS requirements in terms of bit error rate(BER), transmission delay and dropping probability can be guaranteed by the cross-layer optimal equivalent bandwidth allocation. The numerical results show that the proposed algorithm has higher spectrum efficiency compared to the existing systems.