Because of the uncertainty and subjectivity of decision makers in the complex decision-making environment,the evaluation information of alternatives given by decision makers is often fuzzy and uncertain.As a generaliz...Because of the uncertainty and subjectivity of decision makers in the complex decision-making environment,the evaluation information of alternatives given by decision makers is often fuzzy and uncertain.As a generalization of intuitionistic fuzzy set(IFSs)and Pythagoras fuzzy set(PFSs),q-rung orthopair fuzzy set(q-ROFS)is more suitable for expressing fuzzy and uncertain information.But,in actual multiple attribute decision making(MADM)problems,the weights of DMs and attributes are always completely unknown or partly known,to date,the maximizing deviation method is a good tool to deal with such issues.Thus,combine the q-ROFS and conventional maximizing deviation method,we will study the maximizing deviation method under q-ROFSs and q-RIVOFSs in this paper.Firstly,we briefly introduce the basic concept of q-rung orthopair fuzzy sets(q-ROFSs)and q-rung interval-valued orthopair fuzzy sets(q-RIVOFSs).Then,combine the maximizing deviation method with q-rung orthopair fuzzy information,we establish two new decision making models.On this basis,the proposed models are applied to MADM problems with q-rung orthopair fuzzy information.Compared with existing methods,the effectiveness and superiority of the new model are analyzed.This method can effectively solve the MADM problem whose decision information is represented by q-rung orthopair fuzzy numbers(q-ROFNs)and whose attributes are incomplete.展开更多
Mining method selection is the first and the most critical problem in mine design and depends on some parameters such as geotechnical and geological features and economic and geographic factors. In this paper, the fac...Mining method selection is the first and the most critical problem in mine design and depends on some parameters such as geotechnical and geological features and economic and geographic factors. In this paper, the factors affecting mining method selection are determined. These factors include shape, thick- ness, depth, slope, RMR and RSS of the orebody, RMR and RSS of the hanging wall and footwall. Then, the priorities of these factors are calculated. In order to calculate the priorities of factors and select the best mining method for Qapiliq salt mine, Iran, based on these priorities, fuzzy analytical hierarchy process (AHP) technique is used. For this purpose, a questionnaire was prepared and was given to the associated experts. Finally, after a comparison carried out based on the effective factors, between the four mining methods including area mining, room and pillar, cut and fill and stope and pillar methods, the stope and nillar mining method was selected as the most suitable method to this mine.展开更多
Resource Scheduling is crucial to data centers. However, most previous works focus only on one-dimensional resource models which ignoring the fact that multiple resources simultaneously utilized, including CPU, memory...Resource Scheduling is crucial to data centers. However, most previous works focus only on one-dimensional resource models which ignoring the fact that multiple resources simultaneously utilized, including CPU, memory and network bandwidth. As cloud computing allows uncoordinated and heterogeneous users to share a data center, competition for multiple resources has become increasingly severe. Motivated by the differences on integrated utilization obtained from different packing schemes, in this paper we take the scheduling problem as a multi-dimensional combinatorial optimization problem with constraint satisfaction. With NP hardness, we present Multiple attribute decision based Integrated Resource Scheduling (MIRS), and a novel heuristic algorithm to gain the approximate optimal solution. Refers to simulation results, in face of various workload sets, our algorithm has significant superiorities in terms of efficiency and performance compared with previous methods.展开更多
基金supported by the National Natural Science Foundation of China under Grant No.71571128the Humanities and Social Sciences Foundation of Ministry of Education of the People’s Republic of China(No.17XJA630003).
文摘Because of the uncertainty and subjectivity of decision makers in the complex decision-making environment,the evaluation information of alternatives given by decision makers is often fuzzy and uncertain.As a generalization of intuitionistic fuzzy set(IFSs)and Pythagoras fuzzy set(PFSs),q-rung orthopair fuzzy set(q-ROFS)is more suitable for expressing fuzzy and uncertain information.But,in actual multiple attribute decision making(MADM)problems,the weights of DMs and attributes are always completely unknown or partly known,to date,the maximizing deviation method is a good tool to deal with such issues.Thus,combine the q-ROFS and conventional maximizing deviation method,we will study the maximizing deviation method under q-ROFSs and q-RIVOFSs in this paper.Firstly,we briefly introduce the basic concept of q-rung orthopair fuzzy sets(q-ROFSs)and q-rung interval-valued orthopair fuzzy sets(q-RIVOFSs).Then,combine the maximizing deviation method with q-rung orthopair fuzzy information,we establish two new decision making models.On this basis,the proposed models are applied to MADM problems with q-rung orthopair fuzzy information.Compared with existing methods,the effectiveness and superiority of the new model are analyzed.This method can effectively solve the MADM problem whose decision information is represented by q-rung orthopair fuzzy numbers(q-ROFNs)and whose attributes are incomplete.
文摘Mining method selection is the first and the most critical problem in mine design and depends on some parameters such as geotechnical and geological features and economic and geographic factors. In this paper, the factors affecting mining method selection are determined. These factors include shape, thick- ness, depth, slope, RMR and RSS of the orebody, RMR and RSS of the hanging wall and footwall. Then, the priorities of these factors are calculated. In order to calculate the priorities of factors and select the best mining method for Qapiliq salt mine, Iran, based on these priorities, fuzzy analytical hierarchy process (AHP) technique is used. For this purpose, a questionnaire was prepared and was given to the associated experts. Finally, after a comparison carried out based on the effective factors, between the four mining methods including area mining, room and pillar, cut and fill and stope and pillar methods, the stope and nillar mining method was selected as the most suitable method to this mine.
基金supported in part by National Key Basic Research Program of China (973 program) under Grant No.2011CB302506Important National Science & Technology Specific Projects: Next-Generation Broadband Wireless Mobile Communications Network under Grant No.2011ZX03002-001-01Innovative Research Groups of the National Natural Science Foundation of China under Grant No.60821001
文摘Resource Scheduling is crucial to data centers. However, most previous works focus only on one-dimensional resource models which ignoring the fact that multiple resources simultaneously utilized, including CPU, memory and network bandwidth. As cloud computing allows uncoordinated and heterogeneous users to share a data center, competition for multiple resources has become increasingly severe. Motivated by the differences on integrated utilization obtained from different packing schemes, in this paper we take the scheduling problem as a multi-dimensional combinatorial optimization problem with constraint satisfaction. With NP hardness, we present Multiple attribute decision based Integrated Resource Scheduling (MIRS), and a novel heuristic algorithm to gain the approximate optimal solution. Refers to simulation results, in face of various workload sets, our algorithm has significant superiorities in terms of efficiency and performance compared with previous methods.