Completing the principal engineering components of a pumped storage power station spans between 50 and 60 months,from the inception of construction to the commencement of power generation by the first unit.The filling...Completing the principal engineering components of a pumped storage power station spans between 50 and 60 months,from the inception of construction to the commencement of power generation by the first unit.The filling of the penstock with water represents a critical phase preceding the production of electricity by the first unit.During this interval,the construction of the diversion shaft presents multiple challenges,including intricate construction procedures,considerable construction difficulty,elevated safety risks,and quality control issues.To address this issue,this study uses CFD software to analyze the flow field,pressure gradient,and head loss of shaft curved section with different curvature radius,and examines several key technologies by drawing on the practice of diversion shaft construction at the Meizhou pumped storage power station.These technologies include optimizing the curvature radius of the curved section of diversion shaft,reverse-well excavation for the shaft,and sliding-up for the lining concrete.It is found that as the curvature radius of shaft curved section reduces from 4 to 2 times the shaft diameter,the hydraulic characteristic index does not change much,and the increase of head loss accounts for about 0.18%of the total head loss of the water conveyance system.The result show that optimizing the curvature radius from 4 times to 2 times the shaft diameter is feasible and reasonable,and several improved technical measures have been proposed,such as stabilizing drill rods,mechanical scraper systems,and control technology of the relationship between concrete setting time and formwork sliding.Their implementation effectively mitigates difficulties and safety risks during shaft construction,expedites the project schedule,enhances engineering quality,and creates a 41-month timeline for the principal engineering schedule for the first power unit generation in China.展开更多
Due to the importance and role of systems engineering in space mission developments, optimization of Omid's systems engineering as a milestone to its current and future generations is focused. In this regard systems ...Due to the importance and role of systems engineering in space mission developments, optimization of Omid's systems engineering as a milestone to its current and future generations is focused. In this regard systems engineering management organization as the basis of optimization work flow in the conceptual design phase is proposed for improvement. To improve the systems engineering management, an agile enhanced organization chart is developed that defines various system duties. This is a type of concurrent engineering approach that promotes direct communication and data interchange between the team members. Due to the importance of decision making in the conceptual design phase, two design matrices are constructed that portray merits of various design options in terms of improved satellite life as well as specific choices of remote sensing capability for the Omid second generation(Omid-2). Conceptual design optimization is explored considering several structural objectives as well as optimal solar energy absorption utilizing a multiple criteria decision making approach. The Eigenvector method is utilized to formulate the objective function via expert judgment. This approach is robust with respect to designer probable miss-judgment. The optimized version of Omid-2 turned out to be a passive Z-axis spin stabilized satellite made of hexagonal honeycomb configuration with carbon-epoxy side panels and Aluminum bottom plate.展开更多
This paper introduces an optimization algorithm, the hummingbirds optimization algorithm(HOA), which is inspired by the foraging process of hummingbirds. The proposed algorithm includes two phases: a self-searching ph...This paper introduces an optimization algorithm, the hummingbirds optimization algorithm(HOA), which is inspired by the foraging process of hummingbirds. The proposed algorithm includes two phases: a self-searching phase and a guide-searching phase. With these two phases, the exploration and exploitation abilities of the algorithm can be balanced. Both the constrained and unconstrained benchmark functions are employed to test the performance of HOA. Ten classic benchmark functions are considered as unconstrained benchmark functions. Meanwhile, two engineering design optimization problems are employed as constrained benchmark functions. The results of these experiments demonstrate HOA is efficient and capable of global optimization.展开更多
Based on the comprehensive comparison of vehicle performance in economy,engine power,driving smoothness,and efficiency cost as well as pollutant emission etc,the paper discussed the high value CVT concept from an angl...Based on the comprehensive comparison of vehicle performance in economy,engine power,driving smoothness,and efficiency cost as well as pollutant emission etc,the paper discussed the high value CVT concept from an angle of the cost effective and powerful for vehicle.In the paper,it researched the related technical detail in CVT.By means of realizing the continuous change in transmission ratio,it could obtain the optimal matching between transmission system and engine operating mode,and enhance the characteristic of fuel oil in economy,and also improve the convenience in manipulation for driver and make passenger comfortable.For easy to understand the concept,the paper made the comparison analysis in many aspects such as performance,transmission specification,high value CVT hybrid,orifice torque sensor,hydraulic system,high value CVT em,new chain portfolio and assessment of the high value CVT on the NEDC.Finally it showed the potential advantages of CVT technology development,and proposed future developing trends to realize technical scheme of high value CVT.展开更多
文摘Completing the principal engineering components of a pumped storage power station spans between 50 and 60 months,from the inception of construction to the commencement of power generation by the first unit.The filling of the penstock with water represents a critical phase preceding the production of electricity by the first unit.During this interval,the construction of the diversion shaft presents multiple challenges,including intricate construction procedures,considerable construction difficulty,elevated safety risks,and quality control issues.To address this issue,this study uses CFD software to analyze the flow field,pressure gradient,and head loss of shaft curved section with different curvature radius,and examines several key technologies by drawing on the practice of diversion shaft construction at the Meizhou pumped storage power station.These technologies include optimizing the curvature radius of the curved section of diversion shaft,reverse-well excavation for the shaft,and sliding-up for the lining concrete.It is found that as the curvature radius of shaft curved section reduces from 4 to 2 times the shaft diameter,the hydraulic characteristic index does not change much,and the increase of head loss accounts for about 0.18%of the total head loss of the water conveyance system.The result show that optimizing the curvature radius from 4 times to 2 times the shaft diameter is feasible and reasonable,and several improved technical measures have been proposed,such as stabilizing drill rods,mechanical scraper systems,and control technology of the relationship between concrete setting time and formwork sliding.Their implementation effectively mitigates difficulties and safety risks during shaft construction,expedites the project schedule,enhances engineering quality,and creates a 41-month timeline for the principal engineering schedule for the first power unit generation in China.
文摘Due to the importance and role of systems engineering in space mission developments, optimization of Omid's systems engineering as a milestone to its current and future generations is focused. In this regard systems engineering management organization as the basis of optimization work flow in the conceptual design phase is proposed for improvement. To improve the systems engineering management, an agile enhanced organization chart is developed that defines various system duties. This is a type of concurrent engineering approach that promotes direct communication and data interchange between the team members. Due to the importance of decision making in the conceptual design phase, two design matrices are constructed that portray merits of various design options in terms of improved satellite life as well as specific choices of remote sensing capability for the Omid second generation(Omid-2). Conceptual design optimization is explored considering several structural objectives as well as optimal solar energy absorption utilizing a multiple criteria decision making approach. The Eigenvector method is utilized to formulate the objective function via expert judgment. This approach is robust with respect to designer probable miss-judgment. The optimized version of Omid-2 turned out to be a passive Z-axis spin stabilized satellite made of hexagonal honeycomb configuration with carbon-epoxy side panels and Aluminum bottom plate.
基金supported by the National Natural Science Foundation of China(61601505)
文摘This paper introduces an optimization algorithm, the hummingbirds optimization algorithm(HOA), which is inspired by the foraging process of hummingbirds. The proposed algorithm includes two phases: a self-searching phase and a guide-searching phase. With these two phases, the exploration and exploitation abilities of the algorithm can be balanced. Both the constrained and unconstrained benchmark functions are employed to test the performance of HOA. Ten classic benchmark functions are considered as unconstrained benchmark functions. Meanwhile, two engineering design optimization problems are employed as constrained benchmark functions. The results of these experiments demonstrate HOA is efficient and capable of global optimization.
文摘Based on the comprehensive comparison of vehicle performance in economy,engine power,driving smoothness,and efficiency cost as well as pollutant emission etc,the paper discussed the high value CVT concept from an angle of the cost effective and powerful for vehicle.In the paper,it researched the related technical detail in CVT.By means of realizing the continuous change in transmission ratio,it could obtain the optimal matching between transmission system and engine operating mode,and enhance the characteristic of fuel oil in economy,and also improve the convenience in manipulation for driver and make passenger comfortable.For easy to understand the concept,the paper made the comparison analysis in many aspects such as performance,transmission specification,high value CVT hybrid,orifice torque sensor,hydraulic system,high value CVT em,new chain portfolio and assessment of the high value CVT on the NEDC.Finally it showed the potential advantages of CVT technology development,and proposed future developing trends to realize technical scheme of high value CVT.