We report the world-leading performance of a 1.3 GHz cryomodule equipped with eight 9-cell superconducting radio-frequency cavities that underwent a medium-temperature furnace baking process.During continuous wave hor...We report the world-leading performance of a 1.3 GHz cryomodule equipped with eight 9-cell superconducting radio-frequency cavities that underwent a medium-temperature furnace baking process.During continuous wave horizontal testing,these cavities achieved unprecedented average intrinsic quality factors of 4.0×10^(10)at 20 MV/m and 3.2×10^(10)at 29 MV/m,with no instances of field emission.The cryomodule demonstrates near-complete preservation of ultra-high quality factors and ultra-high accelerating gradients from vertical to horizontal testing,marking a significant milestone in continuous-wave superconducting radio-frequency accelerator technology.This letter presents the cryomodule development experience,includ-ing cavity preparation,cryomodule assembly,degaussing,fast cooldown,and performance testing.展开更多
Two 650 MHz single-cell superconducting radio-frequency(SRF)cavities used for the Circular Electron Positron Collider(CEPC)were studied to achieve a high accelerating gradient(E_(acc))and high intrinsic quality factor...Two 650 MHz single-cell superconducting radio-frequency(SRF)cavities used for the Circular Electron Positron Collider(CEPC)were studied to achieve a high accelerating gradient(E_(acc))and high intrinsic quality factor(Q_(0)).The 650 MHz single-cell cavities were subjected to a combination of buffered chemical polishing(BCP)and electropolishing(EP),and their E_(acc) exceeded40 MV/m.Such a high E_(acc) may result from the cold EP with more uniform removal.BCP is easy,cheap,and rough,whereas EP is complicated,expensive,and precise Therefore,the combination of BCP and EP investigated in this study is suitable for surface treatments of mass SRF cavities.Medium temperature(mid-T)furnace baking was also conducted,which demonstrated an ultrahigh Q_(0) of 8×10^(10) at 22 MV/m for both cavities,and an extremely low BCS resistance(R_(BCS))of~1.0 nΩwas achieved a2.0 K.展开更多
In this paper, a statistical analysis method is proposed to research life characteristics of products based on the partially accelerated life test. We discuss the statistical analysis for constant-stress partially acc...In this paper, a statistical analysis method is proposed to research life characteristics of products based on the partially accelerated life test. We discuss the statistical analysis for constant-stress partially accelerated life tests with Lomax distribution based on interval censored samples. The EM algorithm is used to obtain the maximum likelihood estimations(MLEs) and interval estimations for the shape parameter and acceleration factor.The average relative errors(AREs), mean square errors(MSEs), the confidence intervals for the parameters, and the influence of the sample size are discussed. The results show that the AREs and MSEs of the MLEs decrease with the increase of sample size. Finally, a simulation sample is used to estimate the reliability under different stress levels.展开更多
In view of the high cost caused by the 1:1 lifetime verification test of ion thrusters,the lifetime acceleration test should be considered.This work uses the PIC-MCC(Particle-in-Cell MonteCarlo Collision)method to ana...In view of the high cost caused by the 1:1 lifetime verification test of ion thrusters,the lifetime acceleration test should be considered.This work uses the PIC-MCC(Particle-in-Cell MonteCarlo Collision)method to analyze the five failure factors that lead to the failure of the accelerator grid of a 30 cm diameter ion thruster under the working mode of 5 k W.Meanwhile,the acceleration stress levels corresponding to different failure factors are obtained.The results show that background pressure has the highest stress level on the grid's erosion.The accelerator grid aperture's mass sputtering rate under the rated vacuum degree(1×10^(-4)Pa)of 5 k W work mode is 8.78 times that of the baseline vacuum degree(1×10^(-6)Pa),and the mass sputtering rate under worse vacuum degree(5×10^(-3)Pa)is 5.08 times that of 1×10^(-4)Pa.Under the influence of the other four failure factors,namely,the voltage of the accelerator grid,upstream plasma density,the screen grid voltage and mass utilization efficiency,the mass sputtering rates of the accelerator grid hole are 2.32,2.67,1.98 and 2.51 times those of the accelerator grid hole under baseline condition,respectively.The ion sputtering results of two 30 cm diameter ion thrusters(both installed with new grids assembly)after working for 1000 h show that the mass sputtering rate of the accelerator grid hole under vacuum conditions of 5×10^(-3)Pa is 4.54 times that under the condition of 1×10^(-4)Pa,and the comparison error between simulation results and test results of acceleration stress is about 10%.In the subsequent ion thruster lifetime verification,the working vacuum degree can be adjusted according to the acceleration stress level of background pressure,so as to shorten the test time and reduce the test cost.展开更多
基金supported by Zhangjiang Laboratory,the SHINE R&D project(No.2017SHZDZX02)the SHINE projectthe National Natural Science Foundation of China(No.12125508).
文摘We report the world-leading performance of a 1.3 GHz cryomodule equipped with eight 9-cell superconducting radio-frequency cavities that underwent a medium-temperature furnace baking process.During continuous wave horizontal testing,these cavities achieved unprecedented average intrinsic quality factors of 4.0×10^(10)at 20 MV/m and 3.2×10^(10)at 29 MV/m,with no instances of field emission.The cryomodule demonstrates near-complete preservation of ultra-high quality factors and ultra-high accelerating gradients from vertical to horizontal testing,marking a significant milestone in continuous-wave superconducting radio-frequency accelerator technology.This letter presents the cryomodule development experience,includ-ing cavity preparation,cryomodule assembly,degaussing,fast cooldown,and performance testing.
基金supported by the Strategic Priority Research Program of the Chinese Academy of Sciences(No.XDB25000000)the National Natural Science Foundation of China(No.12075270)the Platform of Advanced Photon Source Technology R&D。
文摘Two 650 MHz single-cell superconducting radio-frequency(SRF)cavities used for the Circular Electron Positron Collider(CEPC)were studied to achieve a high accelerating gradient(E_(acc))and high intrinsic quality factor(Q_(0)).The 650 MHz single-cell cavities were subjected to a combination of buffered chemical polishing(BCP)and electropolishing(EP),and their E_(acc) exceeded40 MV/m.Such a high E_(acc) may result from the cold EP with more uniform removal.BCP is easy,cheap,and rough,whereas EP is complicated,expensive,and precise Therefore,the combination of BCP and EP investigated in this study is suitable for surface treatments of mass SRF cavities.Medium temperature(mid-T)furnace baking was also conducted,which demonstrated an ultrahigh Q_(0) of 8×10^(10) at 22 MV/m for both cavities,and an extremely low BCS resistance(R_(BCS))of~1.0 nΩwas achieved a2.0 K.
基金Supported by National Natural Science Foundation of China(11271039)
文摘In this paper, a statistical analysis method is proposed to research life characteristics of products based on the partially accelerated life test. We discuss the statistical analysis for constant-stress partially accelerated life tests with Lomax distribution based on interval censored samples. The EM algorithm is used to obtain the maximum likelihood estimations(MLEs) and interval estimations for the shape parameter and acceleration factor.The average relative errors(AREs), mean square errors(MSEs), the confidence intervals for the parameters, and the influence of the sample size are discussed. The results show that the AREs and MSEs of the MLEs decrease with the increase of sample size. Finally, a simulation sample is used to estimate the reliability under different stress levels.
基金supported by Key Laboratory Funds for the Science and Technology on Vacuum Technology and Physics Laboratory,Lanzhou Institute of Physics(Nos.HTKJ2022KL510003 and 6142207210303)Independent project of Hangzhou Institute for Advanced Study(No.2022ZZ01009)Science and Technology Project Affiliated to the Education Department of Chongqing Municipality(No.KJZD-K202101506)。
文摘In view of the high cost caused by the 1:1 lifetime verification test of ion thrusters,the lifetime acceleration test should be considered.This work uses the PIC-MCC(Particle-in-Cell MonteCarlo Collision)method to analyze the five failure factors that lead to the failure of the accelerator grid of a 30 cm diameter ion thruster under the working mode of 5 k W.Meanwhile,the acceleration stress levels corresponding to different failure factors are obtained.The results show that background pressure has the highest stress level on the grid's erosion.The accelerator grid aperture's mass sputtering rate under the rated vacuum degree(1×10^(-4)Pa)of 5 k W work mode is 8.78 times that of the baseline vacuum degree(1×10^(-6)Pa),and the mass sputtering rate under worse vacuum degree(5×10^(-3)Pa)is 5.08 times that of 1×10^(-4)Pa.Under the influence of the other four failure factors,namely,the voltage of the accelerator grid,upstream plasma density,the screen grid voltage and mass utilization efficiency,the mass sputtering rates of the accelerator grid hole are 2.32,2.67,1.98 and 2.51 times those of the accelerator grid hole under baseline condition,respectively.The ion sputtering results of two 30 cm diameter ion thrusters(both installed with new grids assembly)after working for 1000 h show that the mass sputtering rate of the accelerator grid hole under vacuum conditions of 5×10^(-3)Pa is 4.54 times that under the condition of 1×10^(-4)Pa,and the comparison error between simulation results and test results of acceleration stress is about 10%.In the subsequent ion thruster lifetime verification,the working vacuum degree can be adjusted according to the acceleration stress level of background pressure,so as to shorten the test time and reduce the test cost.