期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
动态劈裂拉伸实验下含双椭圆缺陷花岗岩的动态断裂行为
1
作者 徐胜男 彭麟智 +4 位作者 王煦 周星源 王璜 秦浩宸 彭安佳 《科学技术与工程》 北大核心 2025年第6期2218-2226,共9页
为研究含双椭圆缺陷花岗岩的破坏形态及能量耗散规律,利用分离式霍普金森杆(split Hopkinson pressure bar,SHPB)装置,分别对双椭圆缺陷夹角为0°、45°、90°、135°的花岗岩试件进行了动态劈裂拉伸实验,探讨了双椭圆... 为研究含双椭圆缺陷花岗岩的破坏形态及能量耗散规律,利用分离式霍普金森杆(split Hopkinson pressure bar,SHPB)装置,分别对双椭圆缺陷夹角为0°、45°、90°、135°的花岗岩试件进行了动态劈裂拉伸实验,探讨了双椭圆缺陷夹角、缺陷间距与花岗岩破坏形态及能量之间的关系。结果表明:双椭圆缺陷间距不变时,夹角越大,试件越容易断裂;夹角不变时,间距增大,岩样更容易断裂。试件的耗散能密度随夹角的增大而降低,且下降趋势逐渐趋于平缓。试件的破坏形态对夹角的敏感程度较高,即随着夹角的增大,岩样破碎程度逐渐加剧,碎块对称性消失,楔体效应逐渐明显,塑性增强;当夹角超过90°时,破碎程度又开始减小,岩样又呈对称断裂。 展开更多
关键词 冲击荷载 分离式霍普金森杆 DIC(digital image correlation method) 动态断裂 耗散能
在线阅读 下载PDF
Controlling roof with potential rock burst risk through different pre-crack length:Mechanism and effect research 被引量:7
2
作者 ZHAO Tong-bin ZHANG Peng-fei +3 位作者 GUO Wei-yao GONG Xu-fei WANG Chao CHEN Yang 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第11期3706-3719,共14页
Roof pre-splitting is an effective method to control the roof with potential rock burst risk.In this study,three-point bending tests were carried out by using fine sandstone specimens with different pre-cracked length... Roof pre-splitting is an effective method to control the roof with potential rock burst risk.In this study,three-point bending tests were carried out by using fine sandstone specimens with different pre-cracked lengths as test objects,and digital speckle correlation method(DSCM)and acoustic emission(AE)technology were used to track the entire process of crack propagation.The effect of pre-cracks on the fracture of rock beams was evaluated,and the mechanical mechanism of the rock beam fracture process was analyzed.The rock beam pre-splitting design method was developed,and the application effect of the method was proved by the microseismic monitoring data obtained from the 10303 working face of Jining No.2 coal mine in China.The results show that the loading time history curve of pre-cracked beams exhibits obvious residual characteristics.Compared with the intact rock beam,the tensile strength,and maximum tensile strain of 35 mm pre-cracked rock beam are decreased by 32.4% and 33.1%,respectively and the acoustic emission b value is increased by 30.2%.According to the pre-splitting design method of rock beam,the maximum and average microseismic energy of the 10303 working face after pre-splitting construction are reduced by 25.6% and 6.4%,respectively,with excellent prevention and control effect of thick roof. 展开更多
关键词 three-point bending acoustic emission roof pre-splitting digital speckle correlation method rock burst control
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部