期刊文献+
共找到1,231篇文章
< 1 2 62 >
每页显示 20 50 100
Study on Accounting Principle and Method of Activity-Based Costing of CIMS Enterprises in China 被引量:1
1
作者 丁日佳 杜爱静 +1 位作者 强桂英 王立杰 《International Journal of Mining Science and Technology》 SCIE EI 2000年第2期26-29,共4页
关键词 of CIMS Enterprises in China and method of Activity-Based costing Study on Accounting Principle CIMS ACTIVITY
在线阅读 下载PDF
A Review of Deepwater Pipeline Construction in the U.S. Gulf of Mexico-Contracts, Cost, and Installation Methods 被引量:1
2
作者 Mark J. Kaiser 《Journal of Marine Science and Application》 CSCD 2016年第3期288-306,共19页
The offshore pipeline network in the U.S. Gulf of Mexico is the largest and most transparent system in the world. A review of deepwater projects in the region provides insight into construction cost and installation m... The offshore pipeline network in the U.S. Gulf of Mexico is the largest and most transparent system in the world. A review of deepwater projects in the region provides insight into construction cost and installation methods and the evolution of contract strategies. Pipeline projects are identified as export systems, infield flowline systems, and combined export and infield systems, and three dozen deepwater pipeline installations from 1980–2014 are described based on Offshore Technology Conference(OTC) and Society of Petroleum Engineers(SPE) industry publications and press release data. Export lines and infield flowlines are equally represented and many projects used a combination of J-lay, S-lay and reel methods with rigid steel, flexible line, and pipe-in-pipe systems. The average 2014 inflation-adjusted cost for pipeline projects based on OTC/SPE publications was $2.76 million/mi and ranged from $520 000/mi to $12.94 million/mi. High cost pipelines tend to be short segments or specialized pipeline. Excluding the two cost endpoints, the majority of projects ranged from $1 to $6 million/mi. The average inflation-adjusted cost to install deepwater pipelines in the U.S. Gulf of Mexico based on available public data is estimated at $3.1 million/mi. 展开更多
关键词 construction cost contract type empirical statistics installation methods deepwater pipeline review
在线阅读 下载PDF
考虑潜在溃坝的水库大坝运行成本和收益量化方法
3
作者 葛巍 孙贺强 +3 位作者 李永闯 景来红 李宗坤 王建有 《郑州大学学报(工学版)》 CAS 北大核心 2025年第1期59-66,共8页
针对水库大坝逐渐老化、自身风险和运行成本不断增加的情况,为了进一步明确水库大坝运行的经济性,构建了一种考虑潜在溃坝损失作用下的水库大坝运行综合成本与综合收益量化模型。首先,综合考虑大坝潜在溃坝的影响,根据ISM理论明确了水... 针对水库大坝逐渐老化、自身风险和运行成本不断增加的情况,为了进一步明确水库大坝运行的经济性,构建了一种考虑潜在溃坝损失作用下的水库大坝运行综合成本与综合收益量化模型。首先,综合考虑大坝潜在溃坝的影响,根据ISM理论明确了水库大坝运行成本与收益影响因素之间的相互作用关系,确定了水库大坝运行综合成本与综合收益量化指标;其次,基于DEMATEL法分析了各因素之间的相互作用程度,明确了各成本与收益指标之间相对重要程度;最后,结合技术经济学理论,计算了潜在溃坝损失作用下的水库大坝运行综合成本和综合收益。将所提模型应用于国内某水库,计算了该水库的运行综合成本和综合收益,并对其经济性进行了分析,结果表明:在考虑潜在溃坝损失的情况下,该水库运行综合成本为743.62万元,综合收益为10911.83万元,收益成本比为14.67,运行综合收益远大于运行综合成本,创收能力良好,经济效益显著。 展开更多
关键词 水库大坝 成本收益 量化方法 自身风险 溃坝
在线阅读 下载PDF
数字人赋能高校计算机课程教学的探索
4
作者 李芳丽 《成才之路》 2025年第2期17-20,共4页
在当今信息化、智能化的时代背景下,数字人技术以其独特的优势逐渐渗透到各个领域,教育行业也不例外。高校计算机课程教学引入数字人技术,既是对传统教学模式的创新尝试,也是对新时代教育需求的积极回应。首先,对数字人相关概念进行阐述... 在当今信息化、智能化的时代背景下,数字人技术以其独特的优势逐渐渗透到各个领域,教育行业也不例外。高校计算机课程教学引入数字人技术,既是对传统教学模式的创新尝试,也是对新时代教育需求的积极回应。首先,对数字人相关概念进行阐述,进一步说明数字人在计算机课程教学中的优势以及数字人赋能计算机课程教学的重要意义。其次,分析现阶段数字人赋能计算机课程教学可能存在的问题。最后,从优化教学方案、更新教学方法,整合教学资源、优化资源内容,加大成本投入、强化师资力量等多个维度提出实践策略,旨在使数字人在计算机课程教学中发挥更大效能,从而提升整体教学质量。 展开更多
关键词 数字人技术 计算机课程 教学方案 教学方法 教学资源 成本投入 师资力量
在线阅读 下载PDF
医疗保险支付方式改革对医疗费用的影响及其作用机制——来自A市医保按病种分值付费的证据
5
作者 何文 朱艺唯 申曙光 《金融经济学研究》 北大核心 2025年第1期94-108,共15页
基于A市医疗保险大型微观报销数据,在准实验的分析框架下,运用事件研究法分析按病种分值付费这一新兴医保支付方式对医疗费用的影响及作用机制。实证结果表明,医院为了适应新的费用补偿机制,会主动控制每一诊次的住院费用,因此实施按病... 基于A市医疗保险大型微观报销数据,在准实验的分析框架下,运用事件研究法分析按病种分值付费这一新兴医保支付方式对医疗费用的影响及作用机制。实证结果表明,医院为了适应新的费用补偿机制,会主动控制每一诊次的住院费用,因此实施按病种分值付费后,单次住院费用显著降低了6.3%。为获得更多的分值,医院具有明显的分解住院次数和高套分值的道德风险,具体表现为住院总次数和次均住院病种分值在政策实施后反而显著提高了3.4%和14.0%,从而导致住院总费用居高不下。总体而言,不同级别医院在支付政策变更后的行为具有一致性,其中三级医院的反应程度更大。基于此,建议相关部门以价值为导向改革医保支付方式,提高医保精细化管理水平,从而实现患者、医院和医保基金利益的统一。 展开更多
关键词 医疗保险 支付方式 医疗费用 道德风险 按病种分值付费
在线阅读 下载PDF
改进型目标作业成本法在房地产行业中的应用研究
6
作者 封珏 封斌 《广州建筑》 2025年第1期103-107,共5页
在城镇化速度放缓,居民负债率不断增高的背景下,我国房地产行业面临众多挑战。优秀的成本管控方法能有效解决成本控制能力弱、成本预算准确度低等问题,帮助房地产商在有限的市场份额中赢得竞争,实现长远发展。本文首先分析了房地产行业... 在城镇化速度放缓,居民负债率不断增高的背景下,我国房地产行业面临众多挑战。优秀的成本管控方法能有效解决成本控制能力弱、成本预算准确度低等问题,帮助房地产商在有限的市场份额中赢得竞争,实现长远发展。本文首先分析了房地产行业当前的发展现状,然后对比分析了目标成本法和作业成本法并介绍了大数据技术在成本管控方面的价值,接着提出了基于大数据技术的改进型目标作业成本法应用于房地产建设过程的成本控制,并着重分析了大数据技术对成本管控的作用。最后,从规范目标作业成本管理流程、加强人员理论培训、完善绩效考核体系、优化成本管控系统四个方面提出了成本管控的建议与方法。 展开更多
关键词 房地产 成本管控 目标作业成本法 大数据技术
在线阅读 下载PDF
探究智能化技术助力建筑工程造价专业的优化
7
作者 刘彬 《智能建筑与智慧城市》 2025年第2期122-124,共3页
随着建筑工程行业飞速发展,传统落后工程建设与设计工艺,极大限制了工程造价水平提升。文章研究了智能化技术助力建筑工程造价专业优化的方法,在掌握当前建筑工程造价管理现状的基础上,从数据分析与成本预测、机器学习在成本优化中的角... 随着建筑工程行业飞速发展,传统落后工程建设与设计工艺,极大限制了工程造价水平提升。文章研究了智能化技术助力建筑工程造价专业优化的方法,在掌握当前建筑工程造价管理现状的基础上,从数据分析与成本预测、机器学习在成本优化中的角色、人工智能与自动化决策支持系统三个方面,分析了智能化技术在建筑造价控制中的应用前景。同时,强调了项目决策、工程设计、施工、竣工几个环节中,智能化技术在造价控制中的具体应用,有助于转变传统造价管理模式,充分发挥智能化技术的应用价值,确保造价控制更加精准,助力建筑工程行业健康发展。 展开更多
关键词 工程造价 智能化技术 优化方法
在线阅读 下载PDF
职业教育产教融合动力机制——基于交易成本的DEMATEL方法实证研究
8
作者 陈质彬 梁骥 《宁波教育学院学报》 2025年第1期108-112,共5页
产教融合是推动教学改革和经济发展的重要策略,相关动力机制研究能有效地总结教育服务属性与经济交易属性之间存在的互动逻辑。以江北新媒体产业学院为例,运用交易成本理论,依托决策试验与评价实验室法(DEMATEL)对产教融合的关键成本因... 产教融合是推动教学改革和经济发展的重要策略,相关动力机制研究能有效地总结教育服务属性与经济交易属性之间存在的互动逻辑。以江北新媒体产业学院为例,运用交易成本理论,依托决策试验与评价实验室法(DEMATEL)对产教融合的关键成本因素进行实证分析。研究发现,产教融合的事后成本较事前成本居于相对主导地位,而议价成本和准租金攫取成本在产教融合动力形成中发挥着核心作用,可从建立全过程产教融合配套举措、保障育人主体的事后权益、发挥合作对话的组织机制优势、科学管理专用资产的投入规模等方面优化产教融合动力机制成本控制,推动产教融合格局向好发展。 展开更多
关键词 产教融合 动力机制优化 交易成本理论 DEMATEL方法
在线阅读 下载PDF
轨道交通中人员伤亡与控制措施成本的关系研究
9
作者 李莎莎 崔铁军 《交通工程》 2025年第3期81-85,93,共6页
为研究轨道交通中控制不良人为事件的措施成本效用,提出人员伤亡与控制措施成本关系分析方法。研究轨道交通中人为事件与伤亡事故演化过程;人为事件发生概率与控制措施成本关系;最后提出关系分析方法。研究表明:人为事件易导致伤亡,乘... 为研究轨道交通中控制不良人为事件的措施成本效用,提出人员伤亡与控制措施成本关系分析方法。研究轨道交通中人为事件与伤亡事故演化过程;人为事件发生概率与控制措施成本关系;最后提出关系分析方法。研究表明:人为事件易导致伤亡,乘客缺乏专业知识与应急能力,因此不安全行为易传播成群体性事件。研究应考虑人为事件及其演化条件对伤亡事件的影响,及措施成本与效用的非线性关系。利用空间故障网络理论构建伤亡演化图,确定事件与演化条件发生概率,人员伤亡措施成本函数,得到措施成本与人员伤亡概率分布图。通过实例分析,发现即便增加措施成本,人员伤亡概率降幅有限。说明该现象原因,并基于此给出通用防治手段。 展开更多
关键词 安全系统工程 轨道交通 人员伤亡 措施成本 关系分析 方法研究
在线阅读 下载PDF
Cost control for real estate development projects in China - Part 1: Literature review
10
作者 夏煦 《Journal of Chongqing University》 CAS 2014年第2期54-61,共8页
The background and purpose, and the current situation of the cost control theory of real estate development project are disscussed in the paper. Problems of cost control for real estate development projects in China a... The background and purpose, and the current situation of the cost control theory of real estate development project are disscussed in the paper. Problems of cost control for real estate development projects in China are analyzed and summarized. According to the real estate development project cost control problems and related factors, a cost control index system of real estate development enterprise, and a cost control factors index system of real estate projects are constructed respectively. Cost control in the five stages of a real estate development project is introduced and summarized respectively. The five stages include: the investment decision-making, planning and design stage, the bidding phase, project implementation stage, and rental or sale. 展开更多
关键词 real estate cost control index system cost control factors cost control method
在线阅读 下载PDF
基于机器学习的成本法在专利价值评估中的应用研究--以“新能源汽车”为例 被引量:4
11
作者 冉从敬 李旺 +1 位作者 胡启彪 黄文俊 《现代情报》 CSSCI 北大核心 2024年第5期140-152,共13页
[目的/意义]构建基于机器学习的成本法专利价值评估方法,快速识别海量专利的实际成本,并预测其价值区间,在为专利价值评估提供新研究思路的同时,也为专利转移转化定价提供了参考借鉴。[方法/过程]通过Innography数据库与Incopat数据库... [目的/意义]构建基于机器学习的成本法专利价值评估方法,快速识别海量专利的实际成本,并预测其价值区间,在为专利价值评估提供新研究思路的同时,也为专利转移转化定价提供了参考借鉴。[方法/过程]通过Innography数据库与Incopat数据库下载“新能源汽车”领域多指标专利数据,提取专利成本影响因素与专利价值影响因素,并形成专利数据训练集与专利数据预测集;构建AutoGluon机器学习分类算法,将包含成本数据的Innography专利数据训练集导入模型进行训练,并将训练好的模型对Incopat专利数据预测集进行成本预测;最后使用成本法并结合本研究提出的专利价值指数对预测结果进行计算,估算其价格区间。[结果/结论]通过实证分析与结果验证可知,本研究构建的基于机器学习的成本法专利价值评估方法在预测专利价值区间中具备一定有效性,为促进专利价值评估研究深化及专利转移转化定价实践发展提供了参考。 展开更多
关键词 机器学习 成本法 价格预估 专利价值
在线阅读 下载PDF
关键路径挣值法在输变电工程中的应用——以上海市某110 kV变电站工程为例
12
作者 阳山 《河南科技》 2025年第1期11-16,共6页
【目的】以上海市某110 kV变电站工程为例,探讨关键路径法(Critical Path Method,CPM)在变电站工程施工管理中的实际应用效果,特别是在进度控制、成本管理和风险评估方面的表现。【方法】对一个110 kV变电站工程案例进行分析,详细阐述CP... 【目的】以上海市某110 kV变电站工程为例,探讨关键路径法(Critical Path Method,CPM)在变电站工程施工管理中的实际应用效果,特别是在进度控制、成本管理和风险评估方面的表现。【方法】对一个110 kV变电站工程案例进行分析,详细阐述CPM的具体应用流程,包括识别项目关键路径、优化资源分配及预测进度和成本的偏差。【结果】研究结果表明,采用CPM能显著提高项目管理的精确度,为项目团队的决策提供及时且有效的支持,从而提高整个施工过程的效率和质量。【结论】不仅为类似输变电工程项目提供了科学的管理策略和方法论,还对推动工程管理领域的理论发展与实践创新具有重要的参考价值。通过实证分析,表明在变电站工程施工中运用CPM的必要性,为未来工程管理的标准化和精细化提供可行的路径,同时也为应对复杂工程项目中的风险和挑战指明方向。 展开更多
关键词 关键路径挣值法 110 kV变电站 施工管理 成本进度控制
在线阅读 下载PDF
中国社会物流成本占GDP比重下降成因实证研究——基于因素分析法 被引量:2
13
作者 潘文轩 《中国流通经济》 CSSCI 北大核心 2024年第7期76-86,共11页
为探究2004—2022年中国社会物流成本占GDP比重趋于下降的成因,在物流成本分类基础上对社会物流成本占GDP比重作了指标分解,并采用差额分析法测算物流需求系数、货物单位价值、平均运输距离、物流费率的变动对社会物流成本占GDP比重变... 为探究2004—2022年中国社会物流成本占GDP比重趋于下降的成因,在物流成本分类基础上对社会物流成本占GDP比重作了指标分解,并采用差额分析法测算物流需求系数、货物单位价值、平均运输距离、物流费率的变动对社会物流成本占GDP比重变化的影响。研究发现,2022年中国社会物流成本占GDP比重相比2004年有所降低,主要源于运输成本占GDP比重的下降和货物单位价值的提高,而物流需求系数、平均运输距离、物流费率的变动均使社会物流成本占GDP比重上升;在运输费率、保管费率、管理费率中,只有运输费率的变动起到了降低社会物流成本占GDP比重的作用;物流需求系数以2013年为拐点先升后降,其影响社会物流成本占GDP比重变化的方向发生了阶段性转折。降低社会物流成本占GDP比重绝不能通过去工业化或过度追求经济服务化的方式实现,而必须在保持制造业比重基本稳定的前提下稳步推进。同时,还须妥善处理好物流服务质量与成本的关系,从两者最佳组合上谋求物流效益的提高,防止物流降成本以牺牲服务质量为代价。展望未来,中国社会物流成本占GDP比重仍有继续下降的空间与潜力,可从结构优化、制度改革、科技赋能、资源整合、供应链协同等方面入手,采取合理有效措施进一步降低社会物流成本占GDP比重。 展开更多
关键词 社会物流成本占GDP比重 因素分析法 物流费率 降低社会物流成本
在线阅读 下载PDF
铁路数据资产流通价值下数据资产定价
14
作者 王雅 张博勇 +1 位作者 王旭琴 赵娅琴 《兰州交通大学学报》 CAS 2024年第4期10-16,共7页
随着大数据技术的发展,数据作为生产要素在经济中起到关键作用,企业逐渐开始利用大数据通过各种方式赋能,以求能给企业带来更大利益。交通是经济建设的“先行官”,铁路是交通体系的重要一环,其积累的大量数据资源具有极高的应用价值。... 随着大数据技术的发展,数据作为生产要素在经济中起到关键作用,企业逐渐开始利用大数据通过各种方式赋能,以求能给企业带来更大利益。交通是经济建设的“先行官”,铁路是交通体系的重要一环,其积累的大量数据资源具有极高的应用价值。铁路信息数据化的底层逻辑是通过对数据的开发和对数据进行二次分析,将数据跨行业、跨系统传递利用,从而推动数据价值的增值。本文结合铁路数据动态性复杂、保密性强等特点,挖掘铁路数据资产定价的影响因素,通过对传统定价方法进行改进,结合AHP分析法构建出更切合实际的铁路数据资产价值评估模型。 展开更多
关键词 铁路数据资产 数据价值评估 成本法
在线阅读 下载PDF
超超临界火电站用COST-FB2转子钢控氮工艺研究 被引量:5
15
作者 彭雷朕 姜周华 +1 位作者 耿鑫 李晓凯 《东北大学学报(自然科学版)》 EI CAS CSCD 北大核心 2020年第4期505-509,527,共6页
利用30 kg真空感应炉进行不同氮分压和渗氮时间条件下的气相渗氮实验和热力学计算,研究COST-FB2钢的气相渗氮工艺.使用ARL4460直读光谱仪、TC-500气体分析仪、HIR-944B红外分析仪等对冶炼铸锭中部成分进行分析.结果表明:渗氮压力≤20 kP... 利用30 kg真空感应炉进行不同氮分压和渗氮时间条件下的气相渗氮实验和热力学计算,研究COST-FB2钢的气相渗氮工艺.使用ARL4460直读光谱仪、TC-500气体分析仪、HIR-944B红外分析仪等对冶炼铸锭中部成分进行分析.结果表明:渗氮压力≤20 kPa时,计算值和实验值吻合较好;气相渗氮是一级反应,渗氮时间为15 min时,钢中氮含量达到平衡值;氮分压为1.5~6 kPa时,COST-FB2钢中氮的质量分数可控制在0.015%~0.03%;为了避免浇铸过程中铸锭内部形成气孔缺陷,宜采用加压浇铸,压力至少为20 kPa;为避免钢中大颗粒BN的形成,钢中氮的质量分数应控制在0.015%~0.02%,冶炼时,氮分压应控制为1.5~3 kPa. 展开更多
关键词 cost-FB2 氮的合金化 氮分压 Factsage方法 氮化硼(BN)
在线阅读 下载PDF
城市物流枢纽经济规划技术方法与实践
16
作者 苏腾 郭轶博 +1 位作者 罗霄 张乐诗 《规划师》 CSSCI 北大核心 2024年第S01期213-219,共7页
枢纽经济已成为国家及省市关注的发展重点,但目前其顶层设计和规划编制体系尚未建立。基于国家、省、市已出台的有关政策文件,从货运物流的角度论证物流、枢纽和经济的关联性,从物流成本的角度指出物流枢纽经济衔接不畅是造成物流成本... 枢纽经济已成为国家及省市关注的发展重点,但目前其顶层设计和规划编制体系尚未建立。基于国家、省、市已出台的有关政策文件,从货运物流的角度论证物流、枢纽和经济的关联性,从物流成本的角度指出物流枢纽经济衔接不畅是造成物流成本偏高的关键因素,其根源之一即交通规划、物流规划和产业规划3类规划缺乏融合,未能形成合力。以现有研究为基础,提出物流枢纽经济规划编制总体框架,明确量化分析、集聚发展、多式联运、产业耦合和政策配套5大技术要点,并结合湖北襄阳的规划实践探索具体方法,助力枢纽经济发展壮大。 展开更多
关键词 枢纽经济 物流 成本 规划 技术方法
在线阅读 下载PDF
不同除草方式对苹果苗木生长的影响 被引量:1
17
作者 刘丽媛 王淼 +4 位作者 马娟娟 张东 吴婉莉 丁亦非 李高潮 《陕西农业科学》 2024年第4期109-114,共6页
苗圃地极易滋生杂草,除草不当会阻碍苗木的正常生长发育,选择适宜的除草方式尤为重要,以苗木‘宫藤富士/G935’为试验材料,研究不同除草方式对苹果苗木生长的影响,为苗圃地绿色经济发展提供理论依据。结果表明:在苗木株高方面,地布防草... 苗圃地极易滋生杂草,除草不当会阻碍苗木的正常生长发育,选择适宜的除草方式尤为重要,以苗木‘宫藤富士/G935’为试验材料,研究不同除草方式对苹果苗木生长的影响,为苗圃地绿色经济发展提供理论依据。结果表明:在苗木株高方面,地布防草显著高于除草剂除草与人工除草为166.07 cm。不同除草方式对侧枝也有影响,表现为地布防草与除草剂除草显著提高了长枝的占比,分别为56.51%与52.11%,而人工除草的苗木以中枝为主,占52.11%。地布防草有效提高了有效分枝粗度与分枝角度,分别达到了3.96 mm与62.86度。此外,地布防草较人工除草每年每667 m^(2)节约除草成本约为150元。总之,地布防草不仅提高了苹果苗木的生长质量,还能节约成本,可在苗木繁育中大力推广应用。 展开更多
关键词 苹果 除草方式 苗木生长 成本分析
在线阅读 下载PDF
考虑出行成本不确定性的路网交通疏散策略
18
作者 温惠英 邱映寒 赵胜 《哈尔滨工业大学学报》 EI CAS CSCD 北大核心 2024年第3期19-28,共10页
为提高应急管理水平,考虑突发事件影响下的交通出行成本不确定性,对城市交通疏散问题进行研究。首先,根据交通疏散问题的时空特性创建时空耦合网络图,并且结合行程时间成本和冲突风险成本,提出了城市交通路网出行成本的量化方法。进一... 为提高应急管理水平,考虑突发事件影响下的交通出行成本不确定性,对城市交通疏散问题进行研究。首先,根据交通疏散问题的时空特性创建时空耦合网络图,并且结合行程时间成本和冲突风险成本,提出了城市交通路网出行成本的量化方法。进一步考虑路段资源权重上限的影响,通过增加边际约束,构建基于预算不确定集的先验疏散策略的鲁棒优化模型,以最小化路网疏散过程的总交通出行成本。然后运用模型重构技术,将搭建的鲁棒模型转化为混合整数线性规划模型,并设计改进的拉格朗日松弛方法进行解耦求解。最后以SiouxFalls网络进行算例分析,数值结果表明,随着不确定集和模型规模的增大,行程时间成本和冲突风险成本的增速分别提高约29.13%和236.46%,模型预算参数控制在一定的区间,能够较好地权衡解的鲁棒性与最优性。通过南京部分区域路网案例测试验证所述方法在更大规模网络算例的适用性,研究结果表明:相比于传统拉格朗日松弛方法,所提出的改良方法可以在较少的迭代次数内得到高质量的可行解。研究结果可以为应急指挥部门制定可靠的交通疏散策略提供思路。 展开更多
关键词 交通网络疏散 时空网络图 出行成本不确定性 鲁棒优化 改进拉格朗日松弛方法
在线阅读 下载PDF
复杂工况下盾构隧道施工成本控制研究 被引量:1
19
作者 杨帆 《铁路工程技术与经济》 2024年第4期52-56,共5页
随着轨道交通建设的快速发展,盾构法作为一种高效、安全的隧道施工方法,在铁路隧道建设中得到了广泛应用。然而,由于盾构段施工环境的复杂性和不确定性,施工过程中容易遇到各种难点问题,如何控制复杂工况下的施工成本成为项目成本控制... 随着轨道交通建设的快速发展,盾构法作为一种高效、安全的隧道施工方法,在铁路隧道建设中得到了广泛应用。然而,由于盾构段施工环境的复杂性和不确定性,施工过程中容易遇到各种难点问题,如何控制复杂工况下的施工成本成为项目成本控制的关键。基于此,本文结合铁路建设实际工程项目,详细探讨了盾构段的施工难点及痛点,并深入分析了其对施工成本控制的影响;随后,针对施工难点问题有针对性地提出了施工优化对策,并进一步系统地阐述了复杂工况下盾构隧道施工成本控制措施与建议,以期为类似工程项目提供了参考依据。 展开更多
关键词 铁路工程 施工成本 盾构法 隧道
在线阅读 下载PDF
化工工程设计阶段造价控制方法 被引量:1
20
作者 付然 《工程建设与设计》 2024年第2期243-245,共3页
针对化工工程设计阶段造价控制存在的问题,重点分析化工工程设计阶段造价控制的方法,概述化工工程设计阶段具体情况以后,明确控制的要点,并提出了实现设计阶段造价有效控制的建议,包括推行设计招标、处理好各种原因的工程设计变更、借... 针对化工工程设计阶段造价控制存在的问题,重点分析化工工程设计阶段造价控制的方法,概述化工工程设计阶段具体情况以后,明确控制的要点,并提出了实现设计阶段造价有效控制的建议,包括推行设计招标、处理好各种原因的工程设计变更、借助价值工程法展开设计方案对比与分析、积极推行限额设计、实行设计质量奖罚制度等。 展开更多
关键词 化工工程 设计阶段 造价 控制方法
在线阅读 下载PDF
上一页 1 2 62 下一页 到第
使用帮助 返回顶部