期刊文献+
共找到1,651篇文章
< 1 2 83 >
每页显示 20 50 100
Uncertain optimal model and solving method to platform scheduling problem in battlefield 被引量:2
1
作者 Yu Sun Peiyang Yao +1 位作者 Dongdong Shui Jieyong Zhang 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2016年第1期157-165,共9页
The platform scheduling problem in battlefield is one of the important problems in military operational research.It needs to minimize mission completing time and meanwhile maximize the mission completing accuracy with... The platform scheduling problem in battlefield is one of the important problems in military operational research.It needs to minimize mission completing time and meanwhile maximize the mission completing accuracy with a limited number of platforms.Though the traditional certain models obtain some good results,uncertain model is still needed to be introduced since the battlefield environment is complex and unstable.An uncertain model is prposed for the platform scheduling problem.Related parameters in this model are set to be fuzzy or stochastic.Due to the inherent disadvantage of the solving methods for traditional models,a new method is proposed to solve the uncertain model.Finally,the practicability and availability of the proposed method are demonstrated with a case of joint campaign. 展开更多
关键词 operational research platform scheduling uncertain model solving method.
在线阅读 下载PDF
Hybrid scheduling model and analysis of performance for switched industrial Ethernet 被引量:1
2
作者 胡春华 吴敏 +1 位作者 刘国平 王四春 《Journal of Central South University of Technology》 EI 2007年第2期271-277,共7页
The fact that outburst traffic in industrial Ethemet was focused on that would bring self-similar phenomenon leading to the delay increase of the cyclical data, and a hybrid priority queue schedule model was proposed ... The fact that outburst traffic in industrial Ethemet was focused on that would bring self-similar phenomenon leading to the delay increase of the cyclical data, and a hybrid priority queue schedule model was proposed in which the outburst data was given the highest priority. Some properties of the self-similar outburst data were proved by network calculus, and its service curve scheduled by the switch was gained. And then the performance of the scheduling algorithm was obtained. The simulation results are close to those calculated by using network calculus model. Some results are of actual significance to the construction of switched industrial Ethernet. 展开更多
关键词 switched industrial Ethemet scheduling model SELF-SIMILAR network calculus
在线阅读 下载PDF
Model Transformation and Optimization of the Olympics Scheduling Problem
3
作者 JIANG Yong-Heng GU Qing-Hua HUANG Bi-Qing CHEN Xi XIAO Tian-Yuan 《自动化学报》 EI CSCD 北大核心 2007年第4期409-413,共5页
安排问题的奥林匹克作为限制满足问题被建模,它被弄软最后的比赛的时间限制转变成一个抑制优化问题。分解方法论为抑制优化问题基于 Lagrangian 松驰被介绍。为双问题优化,有可变直径的亚坡度设计方法被学习。方法能收敛到全球性最佳... 安排问题的奥林匹克作为限制满足问题被建模,它被弄软最后的比赛的时间限制转变成一个抑制优化问题。分解方法论为抑制优化问题基于 Lagrangian 松驰被介绍。为双问题优化,有可变直径的亚坡度设计方法被学习。方法能收敛到全球性最佳的答案,效率被给。数字结果证明方法是有效的。 展开更多
关键词 最佳化设计 程序安排 拉格朗日 转换模型
在线阅读 下载PDF
Multi-satellite observation integrated scheduling method oriented to emergency tasks and common tasks 被引量:23
4
作者 Guohua Wu Manhao Ma +1 位作者 Jianghan Zhu Dishan Qiu 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2012年第5期723-733,共11页
Satellite observation scheduling plays a significant role in improving the efficiency of satellite observation systems.Although many scheduling algorithms have been proposed,emergency tasks,characterized as importance... Satellite observation scheduling plays a significant role in improving the efficiency of satellite observation systems.Although many scheduling algorithms have been proposed,emergency tasks,characterized as importance and urgency(e.g.,observation tasks orienting to the earthquake area and military conflict area),have not been taken into account yet.Therefore,it is crucial to investigate the satellite integrated scheduling methods,which focus on meeting the requirements of emergency tasks while maximizing the profit of common tasks.Firstly,a pretreatment approach is proposed,which eliminates conflicts among emergency tasks and allocates all tasks with a potential time-window to related orbits of satellites.Secondly,a mathematical model and an acyclic directed graph model are constructed.Thirdly,a hybrid ant colony optimization method mixed with iteration local search(ACO-ILS) is established to solve the problem.Moreover,to guarantee all solutions satisfying the emergency task requirement constraints,a constraint repair method is presented.Extensive experimental simulations show that the proposed integrated scheduling method is superior to two-phased scheduling methods,the performance of ACO-ILS is greatly improved in both evolution speed and solution quality by iteration local search,and ACO-ILS outperforms both genetic algorithm and simulated annealing algorithm. 展开更多
关键词 satellite scheduling emergency task ant colony optimization(ACO) iteration local search(ILS) acyclic directed graph model
在线阅读 下载PDF
Missile robust gain scheduling autopilot design using full block multipliers 被引量:3
5
作者 Jianqiao Yu Guanchen Luo Wentao Yin 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2010年第5期883-891,共9页
Reduction of conservatism is one of the key and difficult problems in missile robust gain scheduling autopilot design based on multipliers.This article presents a scheme of adopting linear parameter-varying(LPV) con... Reduction of conservatism is one of the key and difficult problems in missile robust gain scheduling autopilot design based on multipliers.This article presents a scheme of adopting linear parameter-varying(LPV) control approach with full block multipliers to design a missile robust gain scheduling autopilot in order to eliminate conservatism.A model matching design structure with a high demand on matching precision is constructed based on the missile linear fractional transformation(LFT) model.By applying full block S-procedure and elimination lemma,a convex feasibility problem with an infinite number of constraints is formulated to satisfy robust quadratic performance specifications.Then a grid method is adopted to transform the infinite-dimensional convex feasibility problem into a solvable finite-dimensional convex feasibility problem,based on which a gain scheduling controller with linear fractional dependence on the flight Mach number and altitude is derived.Static and dynamic simulation results show the effectiveness and feasibility of the proposed scheme. 展开更多
关键词 full block multiplier gain scheduling control robust control model matching autopilot.
在线阅读 下载PDF
Towards optimal recovery scheduling for dynamic resilience of networked infrastructure 被引量:2
6
作者 WANG Yang FU Shanshan +2 位作者 WU Bing HUANG Jinhui WEI Xiaoyang 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2018年第5期995-1008,共14页
Prior research on the resilience of critical infrastructure usually utilizes the network model to characterize the structure of the components so that a quantitative representation of resilience can be obtained. Parti... Prior research on the resilience of critical infrastructure usually utilizes the network model to characterize the structure of the components so that a quantitative representation of resilience can be obtained. Particularly, network component importance is addressed to express its significance in shaping the resilience performance of the whole system. Due to the intrinsic complexity of the problem, some idealized assumptions are exerted on the resilience-optimization problem to find partial solutions. This paper seeks to exploit the dynamic aspect of system resilience, i.e., the scheduling problem of link recovery in the post-disruption phase.The aim is to analyze the recovery strategy of the system with more practical assumptions, especially inhomogeneous time cost among links. In view of this, the presented work translates the resilience-maximization recovery plan into the dynamic decisionmaking of runtime recovery option. A heuristic scheme is devised to treat the core problem of link selection in an ongoing style.Through Monte Carlo simulation, the link recovery order rendered by the proposed scheme demonstrates excellent resilience performance as well as accommodation with uncertainty caused by epistemic knowledge. 展开更多
关键词 dynamic resilience network model component importance recovery scheduling epistemic uncertainty
在线阅读 下载PDF
Try and error-based scheduling algorithm for cluster tools of wafer fabrications with residency time constraints 被引量:4
7
作者 ZHOU Bing-hai LI Xin 《Journal of Central South University》 SCIE EI CAS 2012年第1期187-192,共6页
To improve the productivity of cluster tools in semiconductor fabrications,on the basis of stating scheduling problems,a try and error-based scheduling algorithm was proposed with residency time constraints and an obj... To improve the productivity of cluster tools in semiconductor fabrications,on the basis of stating scheduling problems,a try and error-based scheduling algorithm was proposed with residency time constraints and an objective of minimizing Makespan for the wafer jobs in cluster tools.Firstly,mathematical formulations of scheduling problems were presented by using assumptions and definitions of a scheduling domain.Resource conflicts were analyzed in the built scheduling model,and policies to solve resource conflicts were built.A scheduling algorithm was developed.Finally,the performances of the proposed algorithm were evaluated and compared with those of other methods by simulations.Experiment results indicate that the proposed algorithm is effective and practical in solving the scheduling problem of the cluster tools. 展开更多
关键词 cluster tools residency constraints scheduling model ALGORITHM simulation experiments
在线阅读 下载PDF
Project Scheduling问题和Job-Shop问题的神经网络解 被引量:1
8
作者 章烔民 吴文娟 陶增乐 《计算机应用与软件》 CSCD 1998年第2期21-28,共8页
Project Scheduling问题和Job-Shop问题是著名的NP难题。本文用神经网络方法去解这两个问题,软件模拟结果是令人满意的。这种方法也为解一大类组合优化问题提供了一个新的途径。
关键词 JOB-SHOP问题 神经网络 优化问题
在线阅读 下载PDF
Reservation-based feedback scheduling of MPC tasks 被引量:1
9
作者 Zhou Pingfang Xie Jianying 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2007年第1期132-136,共5页
A reservation-based feedback scheduling (FS-CBS) of a set of model predictive control (MPC) tasks is presented to optimize the global control performance subject to limited computational resource. Implemented as a... A reservation-based feedback scheduling (FS-CBS) of a set of model predictive control (MPC) tasks is presented to optimize the global control performance subject to limited computational resource. Implemented as anytime algorithm, MPC task allows computation time to be traded for control performance. Each MPC task is assigned with a constant bandwidth server (CBS), whose reserved processor time is adjusted dynamically. The FS-CBS is shown robust against the varying of execution time of MPC tasks at runtime. Simulation results illustrate its effectiveness. 展开更多
关键词 Real-time control system Real-time scheduling model predictive control
在线阅读 下载PDF
源-荷匹配机制下的水光互补系统中长期与短期嵌套优化调度模型 被引量:1
10
作者 黄显峰 黄晗 +3 位作者 鲜于虎成 张艳青 李旭 许昌 《水利水电科技进展》 北大核心 2025年第2期38-45,共8页
针对高比例光伏发电渗透下水光互补系统源-荷同步性显著下降的问题,构建了一种外层长期水量调蓄与内层短期电力互补相耦合的嵌套调度模型。该模型在外层识别光伏出力与负荷曲线特征,而在内层基于源-荷匹配机制,根据水、光、荷特性将输... 针对高比例光伏发电渗透下水光互补系统源-荷同步性显著下降的问题,构建了一种外层长期水量调蓄与内层短期电力互补相耦合的嵌套调度模型。该模型在外层识别光伏出力与负荷曲线特征,而在内层基于源-荷匹配机制,根据水、光、荷特性将输电通道划分为多个目标空间,并采用层内目标分级与层间全局搜索的耦合联动机制,求解输电通道电量配比,得到各目标空间的电量分布情况。澜沧江西藏段水光互补系统实例分析结果表明,构建的模型能够有效引导系统运行工况趋近目标偏好区域,所制订的调度方案能够满足短期弃电、波动风险控制与电力调峰需求,验证了模型的合理性。 展开更多
关键词 水光互补系统 源-荷匹配 输电通道 优化调度模型
在线阅读 下载PDF
基于电碳耦合的多园区综合能源系统双层博弈优化模型 被引量:2
11
作者 王永利 周含芷 +2 位作者 姜斯冲 张云飞 李雨洋 《可再生能源》 北大核心 2025年第3期388-399,共12页
随着用户侧分布式能源的不断发展,多主体资源间逐渐呈现互动态势。由于分布式能源设备自主调控以及新能源、负荷等主体的运营方式多样化明显,亟须建立多主体博弈优化模型,满足多样化利益诉求。文章以多园区综合能源系统为研究对象,构建... 随着用户侧分布式能源的不断发展,多主体资源间逐渐呈现互动态势。由于分布式能源设备自主调控以及新能源、负荷等主体的运营方式多样化明显,亟须建立多主体博弈优化模型,满足多样化利益诉求。文章以多园区综合能源系统为研究对象,构建双层博弈优化调度模型。首先,综合考虑园区在生产经营活动中所产生的碳排放量,构建考虑等效抵消机制的阶梯碳-绿证交易模型;其次,依据园区实际合作情况,构建多园区博弈优化模型,研究系统运营商动态定价与园区优化运行调度问题;最后,通过算例分析验证所构建模型能够在保证经济性的同时降低系统碳排放量,实现了经济与碳减排效益相统一。 展开更多
关键词 多园区综合能源系统 双层博弈优化调度模型 阶梯碳-绿证交易机制 动态定价
在线阅读 下载PDF
考虑潮流限值的水库群联合发电调度研究
12
作者 刘园 刘珍珍 +4 位作者 鲍正风 赵辉 刘攀 汪涛 张晓菁 《中国农村水利水电》 北大核心 2025年第11期187-191,197,共6页
水库群联合发电优化调度可提高可再生能源的高效利用。现有发电调度研究多注重发电效益的最大化,较少关注梯级电站外送能力的限制问题。为此,研究提出了一种考虑潮流限值约束的水库群联合发电调度模型,模型外层采用动态规划逐次渐进法(D... 水库群联合发电优化调度可提高可再生能源的高效利用。现有发电调度研究多注重发电效益的最大化,较少关注梯级电站外送能力的限制问题。为此,研究提出了一种考虑潮流限值约束的水库群联合发电调度模型,模型外层采用动态规划逐次渐进法(DPSA),内层根据装机容量分配各机组的出力。以三峡-葛洲坝和清江梯级电站2020年秋季典型日为研究案例,并与实际调度运行过程作对比。结果表明,在无潮流限值约束条件下,三峡-葛洲坝与清江梯级电站联合调度方案能够实现最高的发电效益;而引入潮流限值后,系统发电量相较实际调度方案的增加比例下降了0.73%,其中三峡梯级和清江梯级电站的增发比例分别下降了0.72%和0.81%。这表明,潮流限值对源端发电厂的发电上限具有显著影响,合理分配各电厂机组出力对于保障电网的安全稳定运行至关重要。提出的方法为梯级水库的联合发电调度提供了理论依据和实践指导。 展开更多
关键词 发电调度 水库群 潮流限值 DPSA优化算法 调度模型
在线阅读 下载PDF
基于DRL的大规模定制装配车间调度研究
13
作者 屈新怀 张慧慧 +1 位作者 丁必荣 孟冠军 《合肥工业大学学报(自然科学版)》 北大核心 2025年第7期878-883,共6页
针对大规模定制装配车间中订单的随机性和偶然性问题,文章提出一种基于深度强化学习(deep reinforcement learning,DRL)的大规模定制装配车间作业调度优化方法。建立以最小化产品组件更换次数和最小化订单提前/拖期惩罚为目标的大规模... 针对大规模定制装配车间中订单的随机性和偶然性问题,文章提出一种基于深度强化学习(deep reinforcement learning,DRL)的大规模定制装配车间作业调度优化方法。建立以最小化产品组件更换次数和最小化订单提前/拖期惩罚为目标的大规模定制装配车间作业调度优化模型,基于调度模型建立马尔科夫决策过程,合理定义状态、动作和奖励函数;将调度模型优化问题与DRL方法相结合,并采用改进的D3QN算法进行模型求解;最后进行仿真实验验证。结果表明,文章所提方法能有效减少产品组件更换次数和降低订单提前/拖期惩罚。 展开更多
关键词 大规模定制 装配车间 深度强化学习(DRL) 车间作业调度 调度优化模型
在线阅读 下载PDF
基于边缘计算的多集群容器云弹性资源调度方法
14
作者 李金 刘科孟 +2 位作者 高红亮 樊腾飞 谢虎 《兵工自动化》 北大核心 2025年第5期42-46,60,共6页
为解决集中式云计算技术不能实现大量边缘数据的运算带宽及不能保证应用的隐私性和实时性等问题,对边缘容器云负载在多集群条件下的时间差异及存在时延敏感性需求差异的边缘应用进行系统分析,并提供一个主从模型管理的多集群边缘云架构... 为解决集中式云计算技术不能实现大量边缘数据的运算带宽及不能保证应用的隐私性和实时性等问题,对边缘容器云负载在多集群条件下的时间差异及存在时延敏感性需求差异的边缘应用进行系统分析,并提供一个主从模型管理的多集群边缘云架构。对时延敏感性运用的相关资源调配情况进行深入研究,通过比较存在的响应式策略,能够有效实现已经提出的相关研究;关于时延敏感应用的问题,采用在负荷上沿超前扩展,抑或在负荷下行时进行滞后缩容,以切实达到应用质量的需要。研究结果表明:边缘计算模式采取分布式,可提高在实际应用周围下沉云中的相关计算能力,能降低云中心自身的运算负荷,减轻核心骨干网带宽压力。 展开更多
关键词 边缘计算 资源调度 时延敏感 分布式模型
在线阅读 下载PDF
基于混合多目标粒子群算法的梯级橡胶坝群蓄洪调度研究 被引量:1
15
作者 徐伟 臧旭东 +2 位作者 夏冰 张磊 杨蕾 《沈阳农业大学学报》 北大核心 2025年第1期73-81,共9页
[目的]城市段河道梯级橡胶坝群蓄洪调度问题具有非线性、多维性和高约束性,研究其高效稳定的求解方法,有助于在保证防洪安全的前提下充分利用洪水退水期的水资源补充坝内库容,对提高汛期洪水利用效率具有重要意义。研究考虑社会目标、... [目的]城市段河道梯级橡胶坝群蓄洪调度问题具有非线性、多维性和高约束性,研究其高效稳定的求解方法,有助于在保证防洪安全的前提下充分利用洪水退水期的水资源补充坝内库容,对提高汛期洪水利用效率具有重要意义。研究考虑社会目标、生态目标和效率目标,建立梯级橡胶坝群多目标蓄洪调度模型。[方法]为提升模型求解性能,提出了一种混合多目标粒子群算法(HMOPSO)用于模型求解,该算法通过Logistic映射初始化种群,采用差分进化策略优化迭代过程,并引入轮盘赌法选择全局最优解。以阜新市细河城市中心段梯级橡胶坝实际工程为例,选取该区域1994年和2013年的典型洪水过程为条件进行多目标蓄洪调度模型求解,将HMOPSO算法结果与MOPSO和NSGA-Ⅱ算法结果进行对比,利用多种性能指标评价各算法的Pareto前沿,并对调度解集进行规律性分析。[结果]各算法均满足求解需求,而HMOPSO算法相较于其他算法的GD指标优越28.57%以上,HV指标优越19.96%以上,证明HMOPSO算法在收敛性、均匀性和多样性方面均优于其他对比算法,能更有效应对不同洪水情景下的蓄洪调度需求;生态目标与效率目标之间存在负相关关系,若侧重于生态目标的实现,则整体调度时间会增加;洪水退水期的线形特征对调度的解集范围具有影响,洪尾可蓄水量、可调度时间越长,可行解集范围则越大。[结论]基于HMOPSO算法为城市段河道梯级橡胶坝群的合理蓄洪调度提供了理论依据,可为类似地区的研究提供参考。 展开更多
关键词 梯级橡胶坝群 蓄洪调度模型 多目标粒子群算法 洪水资源利用
在线阅读 下载PDF
考虑沼气发电与新型热力循环的农村“化学-热-电”耦合系统低碳调度模型 被引量:1
16
作者 唐爱红 王庆铭 +2 位作者 周淼 王文浩 刘俊 《中国电机工程学报》 北大核心 2025年第5期1847-1859,I0020,共14页
随着“双碳”目标的逐步推进,新能源技术不断取得突破,沼气发电参与的热-电系统在农村能源结构优化中所占比重逐渐加大,开展沼气发电系统参与热电调度的研究极其迫切。该文首先基于沼气发电特性,建立农村“化学-热-电”耦合系统,并论证... 随着“双碳”目标的逐步推进,新能源技术不断取得突破,沼气发电参与的热-电系统在农村能源结构优化中所占比重逐渐加大,开展沼气发电系统参与热电调度的研究极其迫切。该文首先基于沼气发电特性,建立农村“化学-热-电”耦合系统,并论证该系统的可行性与重要性;其次,在所建立的系统中采用新型热力循环系统,通过建立考虑虚拟储能的热网动态模型,实现热能的跨时段转移;然后,基于沼气从产生到发电的全过程,提出一种“沼气-热-电”联储联供单元,实现系统中化学能、热能和电能的有效整合,最大化全系统的能源利用效率。最后,该模型以51节点系统为例进行实证分析,结果表明,该文所提“化学-热-电”耦合系统不仅能够弥补风光出力不确定的弊端,还通过整合多种能源形式,显著降低了系统的碳排放,展示了其在现代农村能源结构中的环保和经济双重优势。 展开更多
关键词 沼气发电 调度模型 “化学-热-电”耦合系统 热力循环系统 联储联供单元
在线阅读 下载PDF
架空机器人紧凑型仓储系统单轨道取货调度研究
17
作者 马云峰 陈磊 +2 位作者 胡依娜 任亮 周志刚 《运筹与管理》 北大核心 2025年第5期97-103,共7页
架空机器人紧凑型仓储系统是一种密集型仓储系统,该系统在拥有超高存储密度的同时还保证了较高的存取速度。为解决架空机器人紧凑型仓储系统中的单轨道取货这一基本问题,以最小化翻箱次数和拣选机器人负载移动距离为目标,建立了整数规... 架空机器人紧凑型仓储系统是一种密集型仓储系统,该系统在拥有超高存储密度的同时还保证了较高的存取速度。为解决架空机器人紧凑型仓储系统中的单轨道取货这一基本问题,以最小化翻箱次数和拣选机器人负载移动距离为目标,建立了整数规划模型,并设计了基于集束搜索的启发式算法(BSH)。数值实验表明,对于小规模算例,整数规划模型可以在合理时间得到最优解,启发式算法也可以在短时间得出近似最优解并且与整数规划模型的gap维持在1%左右;对于中到大规模算例,整数规划模型无法在合理的时间得出最优解,BSH算法可以在短时间得出优质解,与企业常用的贪心算法对比均能降低20%以上的取货成本;与传统的集束搜索算法相比,BSH算法的性能提升了7%到12%,证明了BSH算法改进的有效性;在系统配置方面,得出了随着轨道中货位数量增加,最优堆栈层数也在增加的结论,为企业的实际应用提供决策支持。 展开更多
关键词 调度 紧致化仓储系统 ORCSRS 整数规划模型 启发式算法
在线阅读 下载PDF
城市轨道交通列车开行方案编制优化研究综述
18
作者 陶思宇 李治德 张永祥 《都市快轨交通》 北大核心 2025年第5期23-34,共12页
列车开行方案优化作为城市轨道交通运输组织中的核心研究问题,是提升轨道交通运营效率和服务质量的关键。为全面梳理该领域的研究进展,并促进其进一步发展,本文对国内外相关文献进行系统论述。首先,从数学建模角度出发,分别从线路层面... 列车开行方案优化作为城市轨道交通运输组织中的核心研究问题,是提升轨道交通运营效率和服务质量的关键。为全面梳理该领域的研究进展,并促进其进一步发展,本文对国内外相关文献进行系统论述。首先,从数学建模角度出发,分别从线路层面和网络层面总结列车开行方案优化的目标函数和约束条件等核心内容;在此基础上总结求解算法的研究,详细回顾启发式算法和精确算法的最新进展。最后,指出现有研究中的不足,并提出未来研究的方向,包括加强动态客流和乘客行为特征的建模,深化网络互联互通情境下的运营优化,探索多策略组合的运营组织模式,以及结合智能化优化算法进行综合分析,以推动城市轨道交通列车开行方案优化研究的创新与发展。 展开更多
关键词 城市轨道交通 列车开行方案 研究综述 数学模型 优化算法
在线阅读 下载PDF
计及SOC自恢复的混合储能系统功率优化分配策略
19
作者 马文忠 张家瑞 +3 位作者 王玉生 张文艳 李恒硕 朱亚恒 《电力自动化设备》 北大核心 2025年第3期16-23,共8页
直流微电网混合储能系统中的超级电容器和蓄电池在工作期间的荷电状态(SOC)易越限,且两者会相互影响,导致SOC恢复效果减弱。为了解决上述问题,提出一种基于双层模糊控制的混合储能系统功率二次分配策略。在第一层SOC自恢复控制上增加第... 直流微电网混合储能系统中的超级电容器和蓄电池在工作期间的荷电状态(SOC)易越限,且两者会相互影响,导致SOC恢复效果减弱。为了解决上述问题,提出一种基于双层模糊控制的混合储能系统功率二次分配策略。在第一层SOC自恢复控制上增加第二层约束控制,对恢复量加以限制,以增强SOC恢复效果。针对低频阶段虚拟电容因其特性减弱SOC恢复效果,高频阶段分频控制与SOC自恢复控制相互耦合影响的问题,对功率的二次分配进行优化,在低频阶段加入恢复补偿环节,在高频阶段将分频控制与SOC自恢复控制解耦并加入解耦补偿环节,使得恢复效果最大化,从而延长储能装置的寿命并加快功率响应速度。在MATLAB/Simulink中搭建相关模型进行仿真分析,结果表明所提控制策略可以增强SOC恢复效果,提高系统运行稳定性。 展开更多
关键词 混合储能系统 SOC自恢复 补偿环节 功率分配 模糊控制
在线阅读 下载PDF
永定河官厅下游防洪工程体系联合调度
20
作者 张运鑫 江泓莹 +4 位作者 翟明硕 蔡思宇 龙岩 程振宇 马滨 《南水北调与水利科技(中英文)》 北大核心 2025年第3期562-571,共10页
针对永定河官厅水库下游防洪工程体系在多工程联合调度中存在的边界条件固定等问题,提出耦合防洪调度规则的二维水动力模型方法。通过空间解耦技术实现控制工程边界条件的动态协调,显著提升联合调度下洪水演进模拟精度。以海河“23... 针对永定河官厅水库下游防洪工程体系在多工程联合调度中存在的边界条件固定等问题,提出耦合防洪调度规则的二维水动力模型方法。通过空间解耦技术实现控制工程边界条件的动态协调,显著提升联合调度下洪水演进模拟精度。以海河“23·7”流域性特大洪水为例,基于二维水动力模型(integrated terrestrial fluxes model for flood forecasting,ITF-Flood)对6个关键断面的洪水过程进行验证,结果显示:洪峰流量、峰现时间及洪量相对误差分别为-2.00%~3.39%、0~1.5 h和-4.90%~8.59%,均控制在±10%以内。针对百年一遇设计洪水工况,对比规则调度与控泄调度方案发现,控泄方案可削减下游河道洪峰流量10.7%,蓄滞洪区淹没面积减少19.5%。进一步模拟200 a、500 a一遇洪水溃堤风险,200 a一遇洪水时控泄方案风险指数降低2.36%,而500 a一遇洪水则更适用规则调度。研究成果为永定河流域防洪联合调度与风险评估提供了技术支撑,具有工程应用价值。 展开更多
关键词 防洪工程体系 ITF-Flood模型 联合调度规则 风险评估 永定河流域
在线阅读 下载PDF
上一页 1 2 83 下一页 到第
使用帮助 返回顶部