With the help of similar material simulation test,time series system for induced caving of roof in continuous mining under complex backfill in ore body No.92 of Tongkeng Tin Mine was studied. According to the similari...With the help of similar material simulation test,time series system for induced caving of roof in continuous mining under complex backfill in ore body No.92 of Tongkeng Tin Mine was studied. According to the similarity theory,a two-dimensional similar simulation test-bed was constructed. The stress and displacement that change along with the advance of mining were acquired and analyzed automatically by data system. The processes of continuous mining of ore-block in 5 intervals and artificial induced caving of roof were simulated. The results of the test show that ore body remained as safety roof in thickness of 15 m guarantees the safe advance of stoping work face. Caving of safety roof puts in practice at the first two mining intervals when the third interval of continuous mining is finished,and one interval as the safety distance should be kept all the time between stopping and caving. While mining in the last interval,pre-slotting should be implemented first of all,and the roof of the last two mining intervals is caved simultaneously. Only this kind of time series system can be an efficient and safe way for induced caving of roof in continuous mining.展开更多
The present problem of mining of narrow and gentle dip vein was analyzed. A new technique of rapidly following curtain filling was put forward. The results show that the new technique is feasible, has the characterist...The present problem of mining of narrow and gentle dip vein was analyzed. A new technique of rapidly following curtain filling was put forward. The results show that the new technique is feasible, has the characteristic to make the whole curtain wall filter, makes relative density of the filling tailings slurry reach saturation of 78.0% 80.0% in 25 min, and keeps the roof of mined out space stable in 60 min. The new technique of the rapidly following curtain filling has solved the difficult problem of the filling body filtering slowly and promptly controlling underground pressure, which cannot be solved in traditional ways.展开更多
基金Project(50490274) supported by the National Natural Science Foundation of ChinaProject(20050533035) supported by the Specialized Research Fund for the Doctoral Program of Higher Education of ChinaProject(1343-77236) supported by the Doctor Degree Paper Innovation Engineering of Central South University, China
文摘With the help of similar material simulation test,time series system for induced caving of roof in continuous mining under complex backfill in ore body No.92 of Tongkeng Tin Mine was studied. According to the similarity theory,a two-dimensional similar simulation test-bed was constructed. The stress and displacement that change along with the advance of mining were acquired and analyzed automatically by data system. The processes of continuous mining of ore-block in 5 intervals and artificial induced caving of roof were simulated. The results of the test show that ore body remained as safety roof in thickness of 15 m guarantees the safe advance of stoping work face. Caving of safety roof puts in practice at the first two mining intervals when the third interval of continuous mining is finished,and one interval as the safety distance should be kept all the time between stopping and caving. While mining in the last interval,pre-slotting should be implemented first of all,and the roof of the last two mining intervals is caved simultaneously. Only this kind of time series system can be an efficient and safe way for induced caving of roof in continuous mining.
文摘The present problem of mining of narrow and gentle dip vein was analyzed. A new technique of rapidly following curtain filling was put forward. The results show that the new technique is feasible, has the characteristic to make the whole curtain wall filter, makes relative density of the filling tailings slurry reach saturation of 78.0% 80.0% in 25 min, and keeps the roof of mined out space stable in 60 min. The new technique of the rapidly following curtain filling has solved the difficult problem of the filling body filtering slowly and promptly controlling underground pressure, which cannot be solved in traditional ways.