期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Dynamic behavior of reinforced concrete frame structure during construction 被引量:3
1
作者 田明革 易伟建 《Journal of Central South University of Technology》 EI 2008年第3期418-422,共5页
The effects of concrete's time-variant elastic modulus,casting structural components,assembling temporary shoring framework system,and shock by operating construction equipment on dynamic behavior of the reinforce... The effects of concrete's time-variant elastic modulus,casting structural components,assembling temporary shoring framework system,and shock by operating construction equipment on dynamic behavior of the reinforced concrete frame structure during construction were investigated. The dynamic tests of an eight-storey reinforced concrete frame structure during full-scaled stages of the sixth storey construction cycle were carried out by ambient vibration. Natural frequencies,corresponding mode shapes and damping ratio were determined by power spectrum processing the tested signal data in frequency domain. The changes of frequencies,mode shapes and damping ratios at different construction stages were given. The results show that natural frequencies and modal damping ratios reach the maximum at stage of casting fresh concrete,especially for higher modes. Modal damping ratios at each construction stage are less than 5% of those during usage. 展开更多
关键词 structural dynamics ambient vibration structure during construction mode shape natural frequency modal damping ratio
在线阅读 下载PDF
Rapid excavation with a newly developed retaining system: Spiral assembly steel structure
2
作者 关成立 杨宇友 王成彪 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第7期2719-2729,共11页
The spiral assembly steel structure, a newly developed retaining wall for the rapid excavation of small-sized foundation pits in unsaturated soil, is presented. This new type of retaining structure is prefabricated in... The spiral assembly steel structure, a newly developed retaining wall for the rapid excavation of small-sized foundation pits in unsaturated soil, is presented. This new type of retaining structure is prefabricated in the factory and is assembled on site in the excavation of a pit. This retaining structure is composed of several prefabricated steel structural units, in which the adjacent steel structural units are joined with connectors. Each steel structural unit has one steel pipe in the radial direction and is welded to a single piece of steel plate. After full installation in situ, the retaining structure becomes a cylindrical steel structure. With the protection afforded by this new type of retaining structure, excavation work can be completed within 24 h to a depth up to 5 m. In order to verify the reliability and effectiveness of this new retaining structure, field construction tests were conducted in Beijing, China. The test construction was monitored. The monitoring program included measuring stress in the structure, lateral earth pressure, and lateral deformation of the surrounding soil. The monitoring data from the field test were compared with the theoretical results. The results show that the proposed new structure is reliable and effective. 展开更多
关键词 working shaft rapid excavation retaining structure field construction monitoring
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部