Two building factors-a longer thermal lag of more than one hour for building envelops and a lag of indoor radiation to convert into cooling load-have impact on the instantaneous heat input and instantaneous cooling lo...Two building factors-a longer thermal lag of more than one hour for building envelops and a lag of indoor radiation to convert into cooling load-have impact on the instantaneous heat input and instantaneous cooling load.So the two factors should be taken into account when selecting the weather parameters for air-conditioning system design.This paper developed a new statistic method for the rational selection of coincident solar irradiance,dry-bulb and wet-bulb temperatures.The method was applied to historic weather records of 25 years in Hong Kong to generate coincident design weather data.And the results show that traditional design solar irradiance,dry-bulb and wet-bulb temperatures may be significantly overestimated in many conditions,and the design weather data for the three different constructions is not kept constant.展开更多
During architectural conception phase,building maintenance problematic is mostly a result of the unintentional use of preconceived architectonical solutions rather than a consequence of a specific influence of mainten...During architectural conception phase,building maintenance problematic is mostly a result of the unintentional use of preconceived architectonical solutions rather than a consequence of a specific influence of maintenance requirements.Hardly the architect in the act of design understands the importance of these solutions in the service life span of a building.Being aware of this,is it possible for the architect to be supplied with a decision support system that allows him to consider the implications of building maintenance since the early design phases? Having awareness of this problem and its consequences in the early design phases a research project was started at the Faculty Engineering of the University of Oporto(FEUP),under which the implications of building maintenance in the act of architectural design is studied.This article presents the methodology developed to identify the needs of maintenance of buildings based on a DSS-decision support system that provides simple tools the architect can use in design phase.This methodology is based on decomposition of building parts-Elements Source of Maintenance ESM-,and subsequently,a set of functional requirements that determine the performance regarding building maintenance on account of architectural decisions.Relevant maintenance actions are defined: Inspection,Pro-action,Cleaning,Correction,Replacement,Legal enforcement,Limits of use.One can thus set up a relationship between the act of design and its performance framework based on behavior,intervention and the ownership of the work of architecture.Using a Multicriteria Analysis(MCA) a qualitative evaluation of different options based on maintenance requirements accomplishment.Conclusions on the importance of architectural conception concerning the building maintenance were clearly arrived at and the utility of the developed decision support tool was also highlighted.展开更多
以北京市四惠枢纽为研究对象,探索以数据驱动为导向满足乘客需求的枢纽动态导向标识方案评估及优化设计方法。首先,搭建KANO乘客需求模型,通过桌面实验,形成动态导向标识在内容、样式及空间位置上的优化设计方案,与四惠枢纽现有方案形...以北京市四惠枢纽为研究对象,探索以数据驱动为导向满足乘客需求的枢纽动态导向标识方案评估及优化设计方法。首先,搭建KANO乘客需求模型,通过桌面实验,形成动态导向标识在内容、样式及空间位置上的优化设计方案,与四惠枢纽现有方案形成对比。其次,基于寻路理论通过建筑信息建模(building information modeling,BIM)+虚拟现实(virtual reality,VR)仿真技术,实现人与枢纽的信息交互,提取新旧导向标识方案作用下乘客寻路过程的特征参数。最后,通过对寻路实验中主客观指标分析可知,被试在新版动态导向标识方案中寻路时间、犯错误点数及迷茫点数显著降低,且新版动态导向标识方案在内容、样式及空间位置上满意度均优于旧版。结果表明:研究搭建BIM+VR的虚拟仿真平台,形成以数据驱动为导向的枢纽动态导向标识方案综合评估及优化设计方法,为枢纽动态导向标识方案设计及合理应用提供技术与理论支撑。展开更多
智能建筑是建筑技术与信息技术相结合的产物,代表了现代建筑技术发展的新趋势。BIM(Building Information Modeling,建筑信息模型)作为一种先进的数字化设计与管理工具,其在智能建筑设计中的应用日益广泛。本文旨在探讨BIM在智能建筑设...智能建筑是建筑技术与信息技术相结合的产物,代表了现代建筑技术发展的新趋势。BIM(Building Information Modeling,建筑信息模型)作为一种先进的数字化设计与管理工具,其在智能建筑设计中的应用日益广泛。本文旨在探讨BIM在智能建筑设计中的应用现状、优势、挑战及未来发展趋势,以期为智能建筑的设计与管理提供有益的参考。展开更多
文摘Two building factors-a longer thermal lag of more than one hour for building envelops and a lag of indoor radiation to convert into cooling load-have impact on the instantaneous heat input and instantaneous cooling load.So the two factors should be taken into account when selecting the weather parameters for air-conditioning system design.This paper developed a new statistic method for the rational selection of coincident solar irradiance,dry-bulb and wet-bulb temperatures.The method was applied to historic weather records of 25 years in Hong Kong to generate coincident design weather data.And the results show that traditional design solar irradiance,dry-bulb and wet-bulb temperatures may be significantly overestimated in many conditions,and the design weather data for the three different constructions is not kept constant.
文摘During architectural conception phase,building maintenance problematic is mostly a result of the unintentional use of preconceived architectonical solutions rather than a consequence of a specific influence of maintenance requirements.Hardly the architect in the act of design understands the importance of these solutions in the service life span of a building.Being aware of this,is it possible for the architect to be supplied with a decision support system that allows him to consider the implications of building maintenance since the early design phases? Having awareness of this problem and its consequences in the early design phases a research project was started at the Faculty Engineering of the University of Oporto(FEUP),under which the implications of building maintenance in the act of architectural design is studied.This article presents the methodology developed to identify the needs of maintenance of buildings based on a DSS-decision support system that provides simple tools the architect can use in design phase.This methodology is based on decomposition of building parts-Elements Source of Maintenance ESM-,and subsequently,a set of functional requirements that determine the performance regarding building maintenance on account of architectural decisions.Relevant maintenance actions are defined: Inspection,Pro-action,Cleaning,Correction,Replacement,Legal enforcement,Limits of use.One can thus set up a relationship between the act of design and its performance framework based on behavior,intervention and the ownership of the work of architecture.Using a Multicriteria Analysis(MCA) a qualitative evaluation of different options based on maintenance requirements accomplishment.Conclusions on the importance of architectural conception concerning the building maintenance were clearly arrived at and the utility of the developed decision support tool was also highlighted.
文摘以北京市四惠枢纽为研究对象,探索以数据驱动为导向满足乘客需求的枢纽动态导向标识方案评估及优化设计方法。首先,搭建KANO乘客需求模型,通过桌面实验,形成动态导向标识在内容、样式及空间位置上的优化设计方案,与四惠枢纽现有方案形成对比。其次,基于寻路理论通过建筑信息建模(building information modeling,BIM)+虚拟现实(virtual reality,VR)仿真技术,实现人与枢纽的信息交互,提取新旧导向标识方案作用下乘客寻路过程的特征参数。最后,通过对寻路实验中主客观指标分析可知,被试在新版动态导向标识方案中寻路时间、犯错误点数及迷茫点数显著降低,且新版动态导向标识方案在内容、样式及空间位置上满意度均优于旧版。结果表明:研究搭建BIM+VR的虚拟仿真平台,形成以数据驱动为导向的枢纽动态导向标识方案综合评估及优化设计方法,为枢纽动态导向标识方案设计及合理应用提供技术与理论支撑。
文摘智能建筑是建筑技术与信息技术相结合的产物,代表了现代建筑技术发展的新趋势。BIM(Building Information Modeling,建筑信息模型)作为一种先进的数字化设计与管理工具,其在智能建筑设计中的应用日益广泛。本文旨在探讨BIM在智能建筑设计中的应用现状、优势、挑战及未来发展趋势,以期为智能建筑的设计与管理提供有益的参考。