期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Enterprise resource planning implementation decision & optimization models 被引量:4
1
作者 Wang Shaojun Wang Gang Lü Min 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2008年第3期513-521,共9页
To study the uncertain optimization problems on implementation schedule, time-cost trade-off and quality in enterprise resource planning (ERP) implementation, combined with program evaluation and review technique (... To study the uncertain optimization problems on implementation schedule, time-cost trade-off and quality in enterprise resource planning (ERP) implementation, combined with program evaluation and review technique (PERT), some optimization models are proposed, which include the implementation schedule model, the timecost trade-off model, the quality model, and the implementation time-cost-quality synthetic optimization model. A PERT-embedded genetic algorithm (GA) based on stochastic simulation technique is introduced to the optimization models solution. Finally, an example is presented to show that the models and algorithm are reasonable and effective, which can offer a reliable quantitative decision method for ERP implementation. 展开更多
关键词 optimization model ERP chance-constrained programming PERT genetic algorithm time cost quality.
在线阅读 下载PDF
Site selection of emergency material warehouse under fuzzy environment 被引量:2
2
作者 刘诚 陈则辉 龚玉燕 《Journal of Central South University》 SCIE EI CAS 2013年第6期1610-1615,共6页
The objective of this work was to determine the location of emergency material warehouses. For the site selection problem of emergency material warehouses, the triangular fuzzy numbers are respectively demand of the d... The objective of this work was to determine the location of emergency material warehouses. For the site selection problem of emergency material warehouses, the triangular fuzzy numbers are respectively demand of the demand node, the distance between the warehouse and demand node and the cost of the warehouse, a bi-objective programming model was established with minimum total cost of the system and minimum distance between the selected emergency material warehouses and the demand node. Using the theories of fuzzy numbers, the fuzzy programming model was transformed into a determinate bi-objective mixed integer programming model and a heuristic algorithm for this model was designed. Then, the algorithm was proven to be feasible and effective through a numerical example. Analysis results show that the location of emergency material warehouse depends heavily on the values of degree a and weight wl. Accurate information of a certain emergency activity should be collected before making the decision. 展开更多
关键词 bi-objective mixed-integer programming emergency material warehouse triangular fuzzy number site selection
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部