A new method for array calibration of array gain and phase uncertainties, which severely degrade the performance of spatial spectrum estimation, is presented. The method is based on the idea of the instrumental sensor...A new method for array calibration of array gain and phase uncertainties, which severely degrade the performance of spatial spectrum estimation, is presented. The method is based on the idea of the instrumental sensors method (ISM), two well-calibrated sensors are added into the original array. By applying the principle of estimation of signal parameters via rotational invariance techniques (ESPRIT), the direction-of-arrivals (DOAs) and uncertainties can be estimated simultaneously through eigen-decomposition. Compared with the conventional ones, this new method has less computational complexity while has higher estimation precision, what's more, it can overcome the problem of ambiguity. Both theoretical analysis and computer simulations show the effectiveness of the proposed method.展开更多
Random dynamic responses caused by the uncertainty of structural parameters of the coupled train-ballasted track-subgrade system under train loading can pose safety concerns to the train operation.This paper introduce...Random dynamic responses caused by the uncertainty of structural parameters of the coupled train-ballasted track-subgrade system under train loading can pose safety concerns to the train operation.This paper introduced a computational model for analyzing probabilistic dynamic responses of three-dimensional(3D)coupled train-ballasted track-subgrade system(TBTSS),where the coupling effects of uncertain rail irregularities,stiffness and damping properties of ballast and subgrade layers were simultaneously considered.The number theoretical method(NTM)was employed to design discrete points for the multi-dimensional stochastic parameters.The time-histories of stochastic dynamic vibrations of the TBSS with systematically uncertain structural parameters were calculated accurately and efficiently by employing the probability density evolution method(PDEM).The model-predicted results were consistent with those by the Monte Carlo simulation method.A sensitivity study was performed to assess the relative importance of those uncertain structural parameters,based on which a case study was presented to explore the stochastic probability evolution mechanism of such train-ballasted track-subgrade system.展开更多
In this paper,the distributed fuzzy fault-tolerant tracking consensus problem of leader-follower multi-agent systems(MASs)is studied.The objective system includes actuator faults,mismatched parameter uncertainties,non...In this paper,the distributed fuzzy fault-tolerant tracking consensus problem of leader-follower multi-agent systems(MASs)is studied.The objective system includes actuator faults,mismatched parameter uncertainties,nonlinear functions,and exogenous disturbances under switching communication topologies.To solve this problem,a distributed fuzzy fault-tolerant controller is proposed for each follower by adaptive mechanisms to track the state of the leader.Furthermore,the fuzzy logic system is utilized to approximate the unknown nonlinear dynamics.An error estimator is introduced between the mismatched parameter matrix and the input matrix.Then,a selective adaptive law with relative state information is adopted and applied.When calculating the Lyapunov function’s derivative,the coupling terms related to consensus error and mismatched parameter uncertainties can be eliminated.Finally,a numerical simulation is given to validate the effectiveness of the proposed protocol.展开更多
分布式资源大规模并网要求配电网的灵活调控能力不断增强,如何充分利用多层级灵活性资源协助系统运行成为目前亟待解决的问题。为此,文中提供一种支撑多种资源接入配电网的分级自治协同策略。首先,分析多层级下灵活性资源特性,对分布式...分布式资源大规模并网要求配电网的灵活调控能力不断增强,如何充分利用多层级灵活性资源协助系统运行成为目前亟待解决的问题。为此,文中提供一种支撑多种资源接入配电网的分级自治协同策略。首先,分析多层级下灵活性资源特性,对分布式资源出力采用概率模型以减少其不确定性因素影响。其次,构建主变-馈线-台区分层分区优化调度模型,台区层进行内部自治并将等值结果传递给馈线层,馈线层基于网络架构和资源运行特性进行区域划分,实现兼顾系统安全性和经济性的主配协同优化,并采用基于谱惩罚参数的自适应交替方向乘子法(spectral penalty parameter based adaptive alternating direction method of multipliers,SPPA-ADMM)进行求解。最后,选用改进的IEEE 33节点算例进行仿真,仿真结果表明文中所采用的并行控制方式能有效提高优化求解的效率,验证了所提策略对多种分布式资源分级接入配电网运行调控具有指导意义。展开更多
An adaptive actuator failure compensation control scheme is developed using an indirect adaptive control method,by calculating the controller parameters from adaptive estimates of system parameters and actuator failur...An adaptive actuator failure compensation control scheme is developed using an indirect adaptive control method,by calculating the controller parameters from adaptive estimates of system parameters and actuator failure parameters.A key technical issue is how to deal with the actuator failure uncertainties such as failure pattern,time and values.A complete parametrization covering all possible failures is used to solve this issue for adaptive parameter estimation.A simultaneous mapping from the estimated system/failure parameters to the controller parameters is employed to make the control system capable of ensuring the desired system performance under failures,which is verified by simulation results.展开更多
基金This work was supported by the National Natural Science Foundation of China (61374054, 61203007), and Natural Science Foundation Research Projection of Shaanxi Province (2013JQ8038).
文摘A new method for array calibration of array gain and phase uncertainties, which severely degrade the performance of spatial spectrum estimation, is presented. The method is based on the idea of the instrumental sensors method (ISM), two well-calibrated sensors are added into the original array. By applying the principle of estimation of signal parameters via rotational invariance techniques (ESPRIT), the direction-of-arrivals (DOAs) and uncertainties can be estimated simultaneously through eigen-decomposition. Compared with the conventional ones, this new method has less computational complexity while has higher estimation precision, what's more, it can overcome the problem of ambiguity. Both theoretical analysis and computer simulations show the effectiveness of the proposed method.
基金Projects(51708558,51878673,U1734208,52078485,U1934217,U1934209)supported by the National Natural Science Foundation of ChinaProject(2020JJ5740)supported by the Natural Science Foundation of Hunan Province,China+1 种基金Project(KF2020-03)supported by the Key Open Fund of State Key Laboratory of Mechanical Behavior and System Safety of Traffic Engineering Structures,ChinaProject(2020-Special-02)supported by the Science and Technology Research and Development Program of China Railway Group Limited。
文摘Random dynamic responses caused by the uncertainty of structural parameters of the coupled train-ballasted track-subgrade system under train loading can pose safety concerns to the train operation.This paper introduced a computational model for analyzing probabilistic dynamic responses of three-dimensional(3D)coupled train-ballasted track-subgrade system(TBTSS),where the coupling effects of uncertain rail irregularities,stiffness and damping properties of ballast and subgrade layers were simultaneously considered.The number theoretical method(NTM)was employed to design discrete points for the multi-dimensional stochastic parameters.The time-histories of stochastic dynamic vibrations of the TBSS with systematically uncertain structural parameters were calculated accurately and efficiently by employing the probability density evolution method(PDEM).The model-predicted results were consistent with those by the Monte Carlo simulation method.A sensitivity study was performed to assess the relative importance of those uncertain structural parameters,based on which a case study was presented to explore the stochastic probability evolution mechanism of such train-ballasted track-subgrade system.
基金This work was supported by Tianjin Natural Science Foundation of China(20JCYBJC01060,20JCQNJC01450)the National Natural Science Foundation of China(61973175)Tianjin Postgraduate Scientific Research and Innovation Project(2020YJSZXB03,2020YJSZXB12).
文摘In this paper,the distributed fuzzy fault-tolerant tracking consensus problem of leader-follower multi-agent systems(MASs)is studied.The objective system includes actuator faults,mismatched parameter uncertainties,nonlinear functions,and exogenous disturbances under switching communication topologies.To solve this problem,a distributed fuzzy fault-tolerant controller is proposed for each follower by adaptive mechanisms to track the state of the leader.Furthermore,the fuzzy logic system is utilized to approximate the unknown nonlinear dynamics.An error estimator is introduced between the mismatched parameter matrix and the input matrix.Then,a selective adaptive law with relative state information is adopted and applied.When calculating the Lyapunov function’s derivative,the coupling terms related to consensus error and mismatched parameter uncertainties can be eliminated.Finally,a numerical simulation is given to validate the effectiveness of the proposed protocol.
文摘分布式资源大规模并网要求配电网的灵活调控能力不断增强,如何充分利用多层级灵活性资源协助系统运行成为目前亟待解决的问题。为此,文中提供一种支撑多种资源接入配电网的分级自治协同策略。首先,分析多层级下灵活性资源特性,对分布式资源出力采用概率模型以减少其不确定性因素影响。其次,构建主变-馈线-台区分层分区优化调度模型,台区层进行内部自治并将等值结果传递给馈线层,馈线层基于网络架构和资源运行特性进行区域划分,实现兼顾系统安全性和经济性的主配协同优化,并采用基于谱惩罚参数的自适应交替方向乘子法(spectral penalty parameter based adaptive alternating direction method of multipliers,SPPA-ADMM)进行求解。最后,选用改进的IEEE 33节点算例进行仿真,仿真结果表明文中所采用的并行控制方式能有效提高优化求解的效率,验证了所提策略对多种分布式资源分级接入配电网运行调控具有指导意义。
基金supported by the US National Science Foundation (ECS0601475)the National Natural Science Foundation of China (60904042)
文摘An adaptive actuator failure compensation control scheme is developed using an indirect adaptive control method,by calculating the controller parameters from adaptive estimates of system parameters and actuator failure parameters.A key technical issue is how to deal with the actuator failure uncertainties such as failure pattern,time and values.A complete parametrization covering all possible failures is used to solve this issue for adaptive parameter estimation.A simultaneous mapping from the estimated system/failure parameters to the controller parameters is employed to make the control system capable of ensuring the desired system performance under failures,which is verified by simulation results.