A 0-1 integer programming model for weekly fleet assignment was put forward based on linear network and weekly flight scheduling in China. In this model, the objective function is to maximize the total profit of fleet...A 0-1 integer programming model for weekly fleet assignment was put forward based on linear network and weekly flight scheduling in China. In this model, the objective function is to maximize the total profit of fleet assignment, subject to the constraints of coverage, aircraft flow balance, fleet size, aircraft availability, aircraft usage, flight restriction, aircraft seat capacity, and stopover. Then the branch-and-bound algorithm based on special ordered set was applied to solve the model. At last, a real- wofld case study on an airline with 5 fleets, 48 aircrafts and 1 786 flight legs indicated that the profit increase was ¥ 1 591276 one week and the running time was no more than 4 rain, which shows that the model and algorithm are fairly good for domestic airline.展开更多
A method for modeling the parallel machine scheduling problems with fuzzy parameters and precedence constraints based on credibility measure is provided. For the given n jobs to be processed on m machines, it is assum...A method for modeling the parallel machine scheduling problems with fuzzy parameters and precedence constraints based on credibility measure is provided. For the given n jobs to be processed on m machines, it is assumed that the processing times and the due dates are nonnegative fuzzy numbers and all the weights are positive, crisp numbers. Based on credibility measure, three parallel machine scheduling problems and a goal-programming model are formulated. Feasible schedules are evaluated not only by their objective values but also by the credibility degree of satisfaction with their precedence constraints. The genetic algorithm is utilized to find the best solutions in a short period of time. An illustrative numerical example is also given. Simulation results show that the proposed models are effective, which can deal with the parallel machine scheduling problems with fuzzy parameters and precedence constraints based on credibility measure.展开更多
For electromagnetic scattering of 3?D complex electrically large conducting targets,a new hybrid algorithm,MoM?PO/SBR algorithm,is presented to realize the interaction of information between method of moment(MoM)and p...For electromagnetic scattering of 3?D complex electrically large conducting targets,a new hybrid algorithm,MoM?PO/SBR algorithm,is presented to realize the interaction of information between method of moment(MoM)and physical optics(PO)/shooting and bouncing ray(SBR).In the algorithm,the COC file that based on the Huygens equivalent principle is introduced,and the conversion interface between the equivalent surface and the target is established.And then,the multi?task flow model presented in this paper is adopted to conduct CPU/graphics processing unit(GPU)tests of the algorithm under three modes,i.e.,MPI/OpenMP,MPI/compute unified device architecture(CUDA)and multi?task programming model(MTPM).Numerical results are presented and compared with reference solutions in order to illustrate the accuracy and the efficiency of the proposed algorithm.展开更多
Modulating both the clock frequency and supply voltage of the network-on-chip (NoC) during runtime can reduce the power consumption and heat flux, but will lead to the increase of the latency of NoC. It is necessary...Modulating both the clock frequency and supply voltage of the network-on-chip (NoC) during runtime can reduce the power consumption and heat flux, but will lead to the increase of the latency of NoC. It is necessary to find a tradeoff between power consumption and communication latency. So we propose an analytical latency model which can show us the relationship of them. The proposed model to analyze latency is based on the M/G/1 queuing model, which is suitable for dynamic frequency scaling. The experiment results show that the accuracy of this model is more than 90%.展开更多
This paper intends to complete the primary logistics planning of oil products under the imbalance of supply and demand. An integrated mathematical programming model is developed to simultaneously find the balance betw...This paper intends to complete the primary logistics planning of oil products under the imbalance of supply and demand. An integrated mathematical programming model is developed to simultaneously find the balance between supply and demand, and optimize the logistics scheme. The model takes minimum logistics cost and resource adjustment cost as the objective function, and takes supply and demand capacity, transportation capacity, mass balance, and resource adjustment rules as constraints.Three adjustment rules are considered in the model, including resource adjustment within oil suppliers,within oil consumers, and between oil consumers. The model is tested on a large-scale primary logistics of a state-owned petroleum enterprise, involving 37 affiliated refineries, 31 procurement departments,286 market depots and dedicated consumers. After the unified optimization, the supply and demand imbalance is eased by 97% and the total cost is saved by 7%, which proves the effectiveness and applicability of the proposed model.展开更多
Oil product pipelines have features such as transporting multiple materials, ever-changing operating conditions, and synchronism between the oil input plan and the oil offloading plan. In this paper, an optimal model ...Oil product pipelines have features such as transporting multiple materials, ever-changing operating conditions, and synchronism between the oil input plan and the oil offloading plan. In this paper, an optimal model was established for a single-source multi-distribution oil pro- duct pipeline, and scheduling plans were made based on supply. In the model, time node constraints, oil offloading plan constraints, and migration of batch constraints were taken into consideration. The minimum deviation between the demanded oil volumes and the actual offloading volumes was chosen as the objective function, and a linear programming model was established on the basis of known time nodes' sequence. The ant colony optimization algo- rithm and simplex method were used to solve the model. The model was applied to a real pipeline and it performed well.展开更多
基金The National Natural Science Foundationof China (70473037)
文摘A 0-1 integer programming model for weekly fleet assignment was put forward based on linear network and weekly flight scheduling in China. In this model, the objective function is to maximize the total profit of fleet assignment, subject to the constraints of coverage, aircraft flow balance, fleet size, aircraft availability, aircraft usage, flight restriction, aircraft seat capacity, and stopover. Then the branch-and-bound algorithm based on special ordered set was applied to solve the model. At last, a real- wofld case study on an airline with 5 fleets, 48 aircrafts and 1 786 flight legs indicated that the profit increase was ¥ 1 591276 one week and the running time was no more than 4 rain, which shows that the model and algorithm are fairly good for domestic airline.
基金Sponsored by the Basic Research Foundation of Beijing Institute of Technology (BIT-UBF-200508G4212)
文摘A method for modeling the parallel machine scheduling problems with fuzzy parameters and precedence constraints based on credibility measure is provided. For the given n jobs to be processed on m machines, it is assumed that the processing times and the due dates are nonnegative fuzzy numbers and all the weights are positive, crisp numbers. Based on credibility measure, three parallel machine scheduling problems and a goal-programming model are formulated. Feasible schedules are evaluated not only by their objective values but also by the credibility degree of satisfaction with their precedence constraints. The genetic algorithm is utilized to find the best solutions in a short period of time. An illustrative numerical example is also given. Simulation results show that the proposed models are effective, which can deal with the parallel machine scheduling problems with fuzzy parameters and precedence constraints based on credibility measure.
文摘For electromagnetic scattering of 3?D complex electrically large conducting targets,a new hybrid algorithm,MoM?PO/SBR algorithm,is presented to realize the interaction of information between method of moment(MoM)and physical optics(PO)/shooting and bouncing ray(SBR).In the algorithm,the COC file that based on the Huygens equivalent principle is introduced,and the conversion interface between the equivalent surface and the target is established.And then,the multi?task flow model presented in this paper is adopted to conduct CPU/graphics processing unit(GPU)tests of the algorithm under three modes,i.e.,MPI/OpenMP,MPI/compute unified device architecture(CUDA)and multi?task programming model(MTPM).Numerical results are presented and compared with reference solutions in order to illustrate the accuracy and the efficiency of the proposed algorithm.
基金supported by the National Natural Science Foundation of China under Grant No.61376024 and No.61306024Natural Science Foundation of Guangdong Province under Grant No.S2013040014366Basic Research Programme of Shenzhen No.JCYJ20140417113430642 and JCYJ20140901003939020
文摘Modulating both the clock frequency and supply voltage of the network-on-chip (NoC) during runtime can reduce the power consumption and heat flux, but will lead to the increase of the latency of NoC. It is necessary to find a tradeoff between power consumption and communication latency. So we propose an analytical latency model which can show us the relationship of them. The proposed model to analyze latency is based on the M/G/1 queuing model, which is suitable for dynamic frequency scaling. The experiment results show that the accuracy of this model is more than 90%.
基金partially supported by the National Natural Science Foundation of China (51874325)the Science Foundation of China University of PetroleumBeijing (2462021BJRC009)。
文摘This paper intends to complete the primary logistics planning of oil products under the imbalance of supply and demand. An integrated mathematical programming model is developed to simultaneously find the balance between supply and demand, and optimize the logistics scheme. The model takes minimum logistics cost and resource adjustment cost as the objective function, and takes supply and demand capacity, transportation capacity, mass balance, and resource adjustment rules as constraints.Three adjustment rules are considered in the model, including resource adjustment within oil suppliers,within oil consumers, and between oil consumers. The model is tested on a large-scale primary logistics of a state-owned petroleum enterprise, involving 37 affiliated refineries, 31 procurement departments,286 market depots and dedicated consumers. After the unified optimization, the supply and demand imbalance is eased by 97% and the total cost is saved by 7%, which proves the effectiveness and applicability of the proposed model.
基金part of the Program of"Study on the mechanism of complex heat and mass transfer during batch transport process in products pipelines"funded under the National Natural Science Foundation of China(grant number 51474228)
文摘Oil product pipelines have features such as transporting multiple materials, ever-changing operating conditions, and synchronism between the oil input plan and the oil offloading plan. In this paper, an optimal model was established for a single-source multi-distribution oil pro- duct pipeline, and scheduling plans were made based on supply. In the model, time node constraints, oil offloading plan constraints, and migration of batch constraints were taken into consideration. The minimum deviation between the demanded oil volumes and the actual offloading volumes was chosen as the objective function, and a linear programming model was established on the basis of known time nodes' sequence. The ant colony optimization algo- rithm and simplex method were used to solve the model. The model was applied to a real pipeline and it performed well.