The artificial bee colony(ABC) algorithm is improved to construct a hybrid multi-objective ABC algorithm, called HMOABC, for resolving optimal power flow(OPF) problem by simultaneously optimizing three conflicting obj...The artificial bee colony(ABC) algorithm is improved to construct a hybrid multi-objective ABC algorithm, called HMOABC, for resolving optimal power flow(OPF) problem by simultaneously optimizing three conflicting objectives of OPF, instead of transforming multi-objective functions into a single objective function. The main idea of HMOABC is to extend original ABC algorithm to multi-objective and cooperative mode by combining the Pareto dominance and divide-and-conquer approach. HMOABC is then used in the 30-bus IEEE test system for solving the OPF problem considering the cost, loss, and emission impacts. The simulation results show that the HMOABC is superior to other algorithms in terms of optimization accuracy and computation robustness.展开更多
There are many motors in operation or on standby in nuclear power plants,and the startup of group motors will have a great impact on the voltage of the emergency bus.At present,there is no special or inexpensive softw...There are many motors in operation or on standby in nuclear power plants,and the startup of group motors will have a great impact on the voltage of the emergency bus.At present,there is no special or inexpensive software to solve this problem,and the experience of engineers is not accurate enough.Therefore,this paper developed a method and system for the startup calculation of group motors in nuclear power plants and proposed an automatic generation method of circuit topology in nuclear power plants.Each component in the topology was given its unique number,and the component class could be constructed according to its type and upper and lower connections.The subordination and topology relationship of switches,buses,and motors could be quickly generated by the program according to the component class,and the simplified direct power flow algorithm was used to calculate the power flow for the startup of group motors according to the above relationship.Then,whether the bus voltage is in the safe range and whether the voltage exceeds the limit during the startup of the group motor could be judged.The practical example was used to verify the effectiveness of the method.Compared with other professional software,the method has high efficiency and low cost.展开更多
为了解决高比例新能源地区电网中新能源不确定性所导致的N-1故障线路过载问题,提出一种计及新能源不确定性并应用混合型潮流控制器(hybrid power flow controller,HPFC)控制模式的电网潮流优化方法。首先,建立了适应于多线路控制的HPFC...为了解决高比例新能源地区电网中新能源不确定性所导致的N-1故障线路过载问题,提出一种计及新能源不确定性并应用混合型潮流控制器(hybrid power flow controller,HPFC)控制模式的电网潮流优化方法。首先,建立了适应于多线路控制的HPFC稳态计算模型,并给出了在不同控制模式下的HPFC运行约束条件。其次,以电网有功网损和线路负载率指标为目标函数,考虑N-1安全约束和HPFC运行约束,建立应用HPFC控制模式的电网潮流优化模型。然后,通过模糊C均值聚类获取反映新能源出力、负荷不确定性的场景集合,并采用多目标多元宇宙优化算法(multi-objective multi-verse optimization,MOMVO)求解所提优化模型。最后,将所提潮流优化方法应用于江苏南通某地区电网。结果表明,所提方法能有效提高电网的经济性与静态安全性,且计算结果具有较好的稳定性。展开更多
新能源随机性使得电力系统潮流复杂多变,加之大量新能源需要远距离输送消纳,输电阻塞问题日益严重。动态热定值(dynamic line rating,DTR)技术能够提升既有架空线路的输电能力,充分发挥系统的灵活调节能力。特别是在N-1事故场景下,采用...新能源随机性使得电力系统潮流复杂多变,加之大量新能源需要远距离输送消纳,输电阻塞问题日益严重。动态热定值(dynamic line rating,DTR)技术能够提升既有架空线路的输电能力,充分发挥系统的灵活调节能力。特别是在N-1事故场景下,采用DTR技术提升线路输送能力,能够缓解严重输电阻塞。然而,传统方法在考虑N-1事故时存在维数灾难问题,因此应用DTR技术仍然存在挑战性。为此,提出了一种两阶段分布鲁棒优化(distributionally robust optimization,DRO)方法以提升架空线路的输电能力。首先,构建了架空线路暂态温度计算模型并做适当简化处理,从而保证后续优化模型的凸性。随后,建立了考虑DTR和N-1安全准则的两阶段DRO模型以避免N-1事故下的持续停电,考虑无功与网损的线性化交流潮流模型能够更准确地计算线路潮流。最后,使用IEEE-24节点系统和IEEE-118节点系统验证了所提方法的有效性。展开更多
基金Projects(61105067,61174164)supported by the National Natural Science Foundation of China
文摘The artificial bee colony(ABC) algorithm is improved to construct a hybrid multi-objective ABC algorithm, called HMOABC, for resolving optimal power flow(OPF) problem by simultaneously optimizing three conflicting objectives of OPF, instead of transforming multi-objective functions into a single objective function. The main idea of HMOABC is to extend original ABC algorithm to multi-objective and cooperative mode by combining the Pareto dominance and divide-and-conquer approach. HMOABC is then used in the 30-bus IEEE test system for solving the OPF problem considering the cost, loss, and emission impacts. The simulation results show that the HMOABC is superior to other algorithms in terms of optimization accuracy and computation robustness.
基金Key Project of National Natural Science Foundation of China(52237008)Beijing Municipal Education Commission Research Program Funding Project(KM202111232022)。
文摘There are many motors in operation or on standby in nuclear power plants,and the startup of group motors will have a great impact on the voltage of the emergency bus.At present,there is no special or inexpensive software to solve this problem,and the experience of engineers is not accurate enough.Therefore,this paper developed a method and system for the startup calculation of group motors in nuclear power plants and proposed an automatic generation method of circuit topology in nuclear power plants.Each component in the topology was given its unique number,and the component class could be constructed according to its type and upper and lower connections.The subordination and topology relationship of switches,buses,and motors could be quickly generated by the program according to the component class,and the simplified direct power flow algorithm was used to calculate the power flow for the startup of group motors according to the above relationship.Then,whether the bus voltage is in the safe range and whether the voltage exceeds the limit during the startup of the group motor could be judged.The practical example was used to verify the effectiveness of the method.Compared with other professional software,the method has high efficiency and low cost.
文摘新能源随机性使得电力系统潮流复杂多变,加之大量新能源需要远距离输送消纳,输电阻塞问题日益严重。动态热定值(dynamic line rating,DTR)技术能够提升既有架空线路的输电能力,充分发挥系统的灵活调节能力。特别是在N-1事故场景下,采用DTR技术提升线路输送能力,能够缓解严重输电阻塞。然而,传统方法在考虑N-1事故时存在维数灾难问题,因此应用DTR技术仍然存在挑战性。为此,提出了一种两阶段分布鲁棒优化(distributionally robust optimization,DRO)方法以提升架空线路的输电能力。首先,构建了架空线路暂态温度计算模型并做适当简化处理,从而保证后续优化模型的凸性。随后,建立了考虑DTR和N-1安全准则的两阶段DRO模型以避免N-1事故下的持续停电,考虑无功与网损的线性化交流潮流模型能够更准确地计算线路潮流。最后,使用IEEE-24节点系统和IEEE-118节点系统验证了所提方法的有效性。