This paper selected the corn processing industry technology innovation alliance in Heilongjiang Province as the research object, evaluated the operational performance of the alliance by using analytic hierarchy proces...This paper selected the corn processing industry technology innovation alliance in Heilongjiang Province as the research object, evaluated the operational performance of the alliance by using analytic hierarchy process(AHP) and fuzzy comprehensive evaluation methods. AHP empirical results showed that the satisfaction of information communication and the satisfaction of the management process were the weakest. And the order from high to low on the level of indicators of the impact for the alliance was the result of alliance operations and the process of alliance operations, the behavioral attitude of alliance members. Besides, the results of fuzzy comprehensive evaluation showed that the operational performance of the corn processing industry technology innovation alliance in Heilongjiang Province was in the general level.展开更多
This paper discusses an optimization of operating a p ermutation circulation-type vehicle routing system (PCVRS, for short), in w hich several stages are located along by a single loop, and a fleet of vehicles travels...This paper discusses an optimization of operating a p ermutation circulation-type vehicle routing system (PCVRS, for short), in w hich several stages are located along by a single loop, and a fleet of vehicles travels on the loop unidirectionally and repeatedly. Traveling on the loop, each vehicle receives an object from the loading stage and then carries it to a cert ain processing stage, or receives an object from a certain processing stage and then carries it to the unloading stage per a turnaround. No passing is allowed f or the vehicles on the loop (from which the system is called permutation, and th is restriction may cause interferences between vehicles). Material handling systems such as PCVRS are actually encountered in flexible man ufacturing systems and in automated storage/retrieval systems. In this paper, we propose a heuristic algorithm for operating the PCVRS, which i ncorporates a new scheduling method for the vehicles with the SPT (shortest proc essing time) numbering of jobs and a round-robin manner of allocating jobs to t he stages, aiming to reduce interferences between the vehicles. We also give num erical results with respect to system performances attained by the heuristic. Description of the system The PCVRS consists of a set of n v vehicles V={V 1,V 2,...,V n v}, a set of n s, processing stages S p={S 1,S 2,...,S n s}, a loading stage S 0 and an unloading stage S n s +1. We denote by S=S p∪{S 0,S n s+l} the set of all the stages. The vehicles travel on a single loop unidirectionany and repeated ly. The system layout is depicted in Fig.1. There is a set of n jobs J={J 1,J 2,...,J n} to be processed b y the vehicles. Each job consists of two tasks: That is, each vehicle receives a n object from S 0 and then carries it to S l with a certain l∈{1,2, ...,n s} (a throw-in job), or receives an object from S l with a certain l∈{1,2,...,n s} and then carries it to S n s+1 (a throw-out job ) per a turnaround. The loop consists of buffer zones BZ(l) and travel zones TZ(l) (see Fig. 1). Each buffer zone BZ(l) is placed in front of stage S l, l=0,1,..., n s, n s+1, in order to avoid a collision between vehicles (i.e., the syste m adopts the so-called zone control strategy). A heuristic algorithm We develop a heuristic algorithm to obtain a good performance for the PCVRS. An operation π={A/B/C} for the PCVRS consists of three decision factors: (A) Numbering jobs Jobs are loaded into S 0 according to an assending order of job numbers. In this paper, we use the following rules to number jobs: SPT: Order jobs in the shortest processing time rule, i.e., P 1≤P 2≤...≤P n for the set of jobs J={J 1,J 2,...,J n}, rather than the FCFS numbering (i.e., number jobs in first-come-first-served order). The SPT rule intends to reduce interferences between two adjacent vehicles at stages. (B) Allocating jobs to stages For the purpose of balancing loads of processing stages, we adopt the following to allocate jobs to the stages: ORDER: Allocate n jobs to n s, processing stages by an in-order manner , i.e., let l(i) be the index of processing stage allocated job J i by ORDER, it holds that l(i)=n s+1-(i-[(i-1)/n s]n s).(1) The ORDER rule intends to process jobs parallel at stages as many as possible. (C) Scheduling vehicles The following method for scheduling vehicles under ORDER rule is already known: Fig.1 The vehicle ro uting system, PCVRS Fig.2 Mean turnaroun d times by heuristics Unchange: Assign n jobs to n v vehicles such that let k(i) be the i ndex of vehicle processing job J i, then k(i)= i-[(i-1)/n v]n v.(2) In csse of n v≥n s, mod (n v,n s)=0 or n v<n s, mod (n s,n v)=0 (mod(x,y) is the remainder of x/y), the number of interferences between vehicles is minimized at stage S 1 under Unchange sche dules, while in the other cases it is not [Lu et al. (2001a)]. Therefore, in t his paper, we develop a new scheduling method of the vehicles, denoted by Ex change, to modify Unchange schedules. Note展开更多
Due to the pressure gain combustion characteristics,the rotating detonation combustor(RDC)can enhance thermodynamic cycle efficiency.Therefore,the performance of gas-turbine engine can be further improved with this co...Due to the pressure gain combustion characteristics,the rotating detonation combustor(RDC)can enhance thermodynamic cycle efficiency.Therefore,the performance of gas-turbine engine can be further improved with this combustion technology.In the present study,the RDC operation performance with a turbine guide vane(TGV)is experimentally investigated.Hydrogen and air are used as propellants while hydrogen and air mass flow rate are about 16.1 g/s and 500 g/s and the equivalence ratio is about 1.0.A pre-detonator is used to ignite the mixture.High-frequency dynamic pressure transducers and silicon pressure sensors are employed to measure pressure oscillations and static pressure in the combustion chamber.The experimental results show that the steady propagation of rotating detonation wave(RDW)is observed in the combustion chamber and the mean propagation velocity is above 1650 m/s,reaching over 84%of theoretical Chapman-Jouguet detonation velocity.Clockwise and counterclockwise propagation directions of RDW are obtained.For clockwise propagation direction,the static pressure is about 15%higher in the combustor compared with counterclockwise propagation direction,but the RDW dominant frequency is lower.When the oblique shock wave propagates across the TGV,the pressure oscillations reduces significantly.In addition,as the detonation products flow through the TGV,the static pressure drops up to 32%and 43%for clockwise and counterclockwise propagation process respectively.展开更多
The energy efficiency monitoring is an essential precondition for ground source heat pump system's controlling and energy saving operation. Based on the data monitoring applied in the school building, this work is...The energy efficiency monitoring is an essential precondition for ground source heat pump system's controlling and energy saving operation. Based on the data monitoring applied in the school building, this work is focused on the parameters acquisition and operation analysis of the GSHP system in Tangshan. Results show the average COPs(coefficient of performance) are2.85 and 2.70 in summer and winter, respectively, and heat(cold) unbalance underground existed after whole year operation. The analysis of data also indicates that the direct borehole air-conditioning saved some power consumption obviously in the early stage of summer and energy saving of the GSHP system depended remarkably on its operation and management level. Besides the observation points of ground temperature are laid for a large-scale GSHP system, and the hydraulic balance of the pipes group needs to be concerned specially in safeguarding better reliability.展开更多
基金Supported by Technology Research and Development Project of Heilongjiang Province(GB14D202)
文摘This paper selected the corn processing industry technology innovation alliance in Heilongjiang Province as the research object, evaluated the operational performance of the alliance by using analytic hierarchy process(AHP) and fuzzy comprehensive evaluation methods. AHP empirical results showed that the satisfaction of information communication and the satisfaction of the management process were the weakest. And the order from high to low on the level of indicators of the impact for the alliance was the result of alliance operations and the process of alliance operations, the behavioral attitude of alliance members. Besides, the results of fuzzy comprehensive evaluation showed that the operational performance of the corn processing industry technology innovation alliance in Heilongjiang Province was in the general level.
文摘This paper discusses an optimization of operating a p ermutation circulation-type vehicle routing system (PCVRS, for short), in w hich several stages are located along by a single loop, and a fleet of vehicles travels on the loop unidirectionally and repeatedly. Traveling on the loop, each vehicle receives an object from the loading stage and then carries it to a cert ain processing stage, or receives an object from a certain processing stage and then carries it to the unloading stage per a turnaround. No passing is allowed f or the vehicles on the loop (from which the system is called permutation, and th is restriction may cause interferences between vehicles). Material handling systems such as PCVRS are actually encountered in flexible man ufacturing systems and in automated storage/retrieval systems. In this paper, we propose a heuristic algorithm for operating the PCVRS, which i ncorporates a new scheduling method for the vehicles with the SPT (shortest proc essing time) numbering of jobs and a round-robin manner of allocating jobs to t he stages, aiming to reduce interferences between the vehicles. We also give num erical results with respect to system performances attained by the heuristic. Description of the system The PCVRS consists of a set of n v vehicles V={V 1,V 2,...,V n v}, a set of n s, processing stages S p={S 1,S 2,...,S n s}, a loading stage S 0 and an unloading stage S n s +1. We denote by S=S p∪{S 0,S n s+l} the set of all the stages. The vehicles travel on a single loop unidirectionany and repeated ly. The system layout is depicted in Fig.1. There is a set of n jobs J={J 1,J 2,...,J n} to be processed b y the vehicles. Each job consists of two tasks: That is, each vehicle receives a n object from S 0 and then carries it to S l with a certain l∈{1,2, ...,n s} (a throw-in job), or receives an object from S l with a certain l∈{1,2,...,n s} and then carries it to S n s+1 (a throw-out job ) per a turnaround. The loop consists of buffer zones BZ(l) and travel zones TZ(l) (see Fig. 1). Each buffer zone BZ(l) is placed in front of stage S l, l=0,1,..., n s, n s+1, in order to avoid a collision between vehicles (i.e., the syste m adopts the so-called zone control strategy). A heuristic algorithm We develop a heuristic algorithm to obtain a good performance for the PCVRS. An operation π={A/B/C} for the PCVRS consists of three decision factors: (A) Numbering jobs Jobs are loaded into S 0 according to an assending order of job numbers. In this paper, we use the following rules to number jobs: SPT: Order jobs in the shortest processing time rule, i.e., P 1≤P 2≤...≤P n for the set of jobs J={J 1,J 2,...,J n}, rather than the FCFS numbering (i.e., number jobs in first-come-first-served order). The SPT rule intends to reduce interferences between two adjacent vehicles at stages. (B) Allocating jobs to stages For the purpose of balancing loads of processing stages, we adopt the following to allocate jobs to the stages: ORDER: Allocate n jobs to n s, processing stages by an in-order manner , i.e., let l(i) be the index of processing stage allocated job J i by ORDER, it holds that l(i)=n s+1-(i-[(i-1)/n s]n s).(1) The ORDER rule intends to process jobs parallel at stages as many as possible. (C) Scheduling vehicles The following method for scheduling vehicles under ORDER rule is already known: Fig.1 The vehicle ro uting system, PCVRS Fig.2 Mean turnaroun d times by heuristics Unchange: Assign n jobs to n v vehicles such that let k(i) be the i ndex of vehicle processing job J i, then k(i)= i-[(i-1)/n v]n v.(2) In csse of n v≥n s, mod (n v,n s)=0 or n v<n s, mod (n s,n v)=0 (mod(x,y) is the remainder of x/y), the number of interferences between vehicles is minimized at stage S 1 under Unchange sche dules, while in the other cases it is not [Lu et al. (2001a)]. Therefore, in t his paper, we develop a new scheduling method of the vehicles, denoted by Ex change, to modify Unchange schedules. Note
基金the National Natural Science Foundation of China(No.11702143 and 11802137)the Fundamental Research Funds for the Central Universities(No.30918011343 and 30919011259).
文摘Due to the pressure gain combustion characteristics,the rotating detonation combustor(RDC)can enhance thermodynamic cycle efficiency.Therefore,the performance of gas-turbine engine can be further improved with this combustion technology.In the present study,the RDC operation performance with a turbine guide vane(TGV)is experimentally investigated.Hydrogen and air are used as propellants while hydrogen and air mass flow rate are about 16.1 g/s and 500 g/s and the equivalence ratio is about 1.0.A pre-detonator is used to ignite the mixture.High-frequency dynamic pressure transducers and silicon pressure sensors are employed to measure pressure oscillations and static pressure in the combustion chamber.The experimental results show that the steady propagation of rotating detonation wave(RDW)is observed in the combustion chamber and the mean propagation velocity is above 1650 m/s,reaching over 84%of theoretical Chapman-Jouguet detonation velocity.Clockwise and counterclockwise propagation directions of RDW are obtained.For clockwise propagation direction,the static pressure is about 15%higher in the combustor compared with counterclockwise propagation direction,but the RDW dominant frequency is lower.When the oblique shock wave propagates across the TGV,the pressure oscillations reduces significantly.In addition,as the detonation products flow through the TGV,the static pressure drops up to 32%and 43%for clockwise and counterclockwise propagation process respectively.
基金Project(2012BAJ06B04)supported by"12th Five-Year Plan"National science and Technology,ChinaProject(2014-228)supported by Department of Housing and Urban Rural Development of Hebei,China
文摘The energy efficiency monitoring is an essential precondition for ground source heat pump system's controlling and energy saving operation. Based on the data monitoring applied in the school building, this work is focused on the parameters acquisition and operation analysis of the GSHP system in Tangshan. Results show the average COPs(coefficient of performance) are2.85 and 2.70 in summer and winter, respectively, and heat(cold) unbalance underground existed after whole year operation. The analysis of data also indicates that the direct borehole air-conditioning saved some power consumption obviously in the early stage of summer and energy saving of the GSHP system depended remarkably on its operation and management level. Besides the observation points of ground temperature are laid for a large-scale GSHP system, and the hydraulic balance of the pipes group needs to be concerned specially in safeguarding better reliability.