期刊文献+
共找到49,772篇文章
< 1 2 250 >
每页显示 20 50 100
Mining pressure monitoring and analysis in fully mechanized backfilling coal mining face-A case study in Zhai Zhen Coal Mine 被引量:16
1
作者 张强 张吉雄 +2 位作者 康涛 孙强 李伟康 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第5期1965-1972,共8页
Fully mechanized solid backfill mining(FMSBM) technology adopts dense backfill body to support the roof. Based on the distinguishing characteristics and mine pressure control principle in this technology, the basic pr... Fully mechanized solid backfill mining(FMSBM) technology adopts dense backfill body to support the roof. Based on the distinguishing characteristics and mine pressure control principle in this technology, the basic principles and methods for mining pressure monitoring were analyzed and established. And the characteristics of overburden strata movement were analyzed by monitoring the support resistance of hydraulic support, the dynamic subsidence of immediate roof, the stress of backfill body, the front abutment pressure, and the mass ratio of cut coal to backfilled materials. On-site strata behavior measurements of 7403 W solid backfilling working face in Zhai Zhen Coal Mine show that the backfill body can effectively support the overburden load, obviously control the overburden strata movement, and weaken the strata behaviors distinctly. Specific performances are as follows. The support resistance decreases obviously; the dynamic subsidence of immediate roof keeps consistent to the variation of backfill body stress, and tends to be stable after the face retreating to 120-150 m away from the cut. The peak value of front abutment pressure arises at 5-12 m before the operating face, and mass ratio is greater than the designed value of 1.15, which effectively ensures the control of strata movement. The research results are bases for intensively studying basic theories of solid backfill mining strata behaviors and its control, and provide theoretical guidance for engineering design in FMSBM. 展开更多
关键词 fully mechanized solid backfill mining(FMSBM) strata movement strata behavior mining pressure monitoring
在线阅读 下载PDF
Circle geometric constraint model for open-pit mine ore-matching and its applications 被引量:2
2
作者 黄俊歆 王李管 +3 位作者 熊书敏 徐少游 谭正华 王海桥 《Journal of Central South University》 SCIE EI CAS 2012年第9期2598-2603,共6页
The circle geometric constraint model (CGCM) was put forward for resolving the open-pit mine ore-matching problems (OMOMP). By adopting the approaches of graph theory, block model of blasted piles was abstracted i... The circle geometric constraint model (CGCM) was put forward for resolving the open-pit mine ore-matching problems (OMOMP). By adopting the approaches of graph theory, block model of blasted piles was abstracted into a set of nodes and directed edges, which were connected together with other nodes in the range of circle constraints, to describe the mining sequence. Also, the constructing method of CGCM was introduced in detail. The algorithm of CGCM has been realized in the DIM1NE system, and applied to a short-term (5 d) program calculation for ore-matching of a cement limestone mine in Hebei Province, China. The applications show that CGCM can well describe the mining sequence of ore blocks and its mining geometric constraints in the process of mining blasted piles. This model, which is applicable for resolving OMOMP under complicated geometric constraints with accurate results, provides effective ways to solve the problems of open-pit ore-matching. 展开更多
关键词 open-pit mine block model blasted-pile mining optimization linear programming mixed integer programming (MIP)
在线阅读 下载PDF
Analysis of factors and countermeasures of mining subsidence in Kaiyang Phosphorus Mine 被引量:11
3
作者 邓建 边利 +2 位作者 李夕兵 赵国彦 王新民 《Journal of Central South University of Technology》 EI 2006年第6期733-737,共5页
Ground crack and subsidence were investigated in Kaiyang Phosphorus Mine as an example. Contribution factors to cause ground crack and mining subsidence were studied, including mining method, mining depth and ore thic... Ground crack and subsidence were investigated in Kaiyang Phosphorus Mine as an example. Contribution factors to cause ground crack and mining subsidence were studied, including mining method, mining depth and ore thickness and stope size, dip angle of orebody, geological structure, nature of overburden and water contents, and roof supports, etc. Countermeasures against cracks and subsidence were put forward. The uniaxial compressive strength of compounded phosphorus gypsum after 28 d of curing period was tested to be more than 1 MPa. Phosphorus gypsum can be used as materials for the backfill of stope. By comparison and numerical simulation, cut and fill mining method with middle-deep drilling holes and ore transportation by blasting force was selected as the optimum mining method in Kaiyang Phosphorus Mine. 展开更多
关键词 mining subsidence ground crack cut and fill mining method Kaiyang Phosphorus Mine
在线阅读 下载PDF
Theoretical design and dynamic simulation of new mining paths of tracked miner on deep seafloor 被引量:8
4
作者 戴瑜 刘少军 《Journal of Central South University》 SCIE EI CAS 2013年第4期918-923,共6页
With comprehensive considerations of the operational safety and collection efficiency for the tracked miner collecting the seafloor poly-metallic nodules, two new improved mining paths for the miner on the deep seaflo... With comprehensive considerations of the operational safety and collection efficiency for the tracked miner collecting the seafloor poly-metallic nodules, two new improved mining paths for the miner on the deep seafloor were proposed. Compared to the conventional mining path, the design principles and superiorities of the two new paths are that the miner turning with relative long radius should avoid large sinkage and high slip, so as to ensure its operational safety, while the space between its straight-line trajectories before and after the turning is optimum, which is designed as the total width of the miner, and collect nodules as more as possible, so as to ensure its collection efficiency. To realize the new mining paths, theoretical designs and quantitative calculations were carried out to determine the exact positions for the speed controls of the miner during its whole operation process. With the new dynamic model of the miner, and through regulations of the speeds of the left and right tracks of the miner on the exact motion positions according to the theoretical calculations, the two new improved mining paths for the miner on the seafloor were successfully simulated, thus the turning radius of the miner in the simulation is about 21.8 m, while the distance between the straight-line trajectories before and after the turning is about 5.2 m. The dynamic simulation results preliminarily prove the feasibility of these two new mining paths, and further can provide important theoretical guidance and useful technical reference for the practical tracked miner operation and control on the seafloor. 展开更多
关键词 deep ocean mining tracked miner single-body model mesh element model collection efficiency mining path dynamic simulation
在线阅读 下载PDF
Investigation and characterization of mining subsidence in Kaiyang Phosphorus Mine 被引量:9
5
作者 邓建 边利 《Journal of Central South University of Technology》 EI 2007年第3期413-417,共5页
In Kaiyang Phosphorus Mine, serious environmental and safety problems are caused by large scale mining activities in the past 40 years. These problems include mining subsidence, low recovery ratio, too much dead ore i... In Kaiyang Phosphorus Mine, serious environmental and safety problems are caused by large scale mining activities in the past 40 years. These problems include mining subsidence, low recovery ratio, too much dead ore in pillars, and pollution of phosphorus gypsum. Mining subsidence falls into four categories: curved ground and mesa, ground cracks and collapse hole, spalling and eboulement, slope slide and creeping. Measures to treat the mining subsidence were put forward: finding out and managing abandoned stopes, optimizing mining method (cut and fill mining method), selecting proper backfilling materials (phosphogypsum mixtures), avoiding disorder mining operation, and treating highway slopes. These investigations and engineering treatment methods are believed to be able to contribute to the safety extraction of ore and sustainable development in Kaiyang Phosphorus Mine. 展开更多
关键词 mining subsidence ground cracking safety Kaiyang Phosphorus Mine cut and fill mining method
在线阅读 下载PDF
Characteristics of rockburst and its mining technology in mines 被引量:5
6
作者 吴爱祥 孙业志 +2 位作者 Gour Sen 沈慧明 杨保华 《Journal of Central South University of Technology》 2002年第4期255-259,共5页
In order to resolve how to mine under the condition of high stress with rockburst, this paper analyzes the law of rockburst, and considers that most of the rockbursts occur in the high stress area of stope. A method o... In order to resolve how to mine under the condition of high stress with rockburst, this paper analyzes the law of rockburst, and considers that most of the rockbursts occur in the high stress area of stope. A method of rockburst forecast and its steps are given, and three different stages of rockburst are identified. Furthermore, this paper considers that blasting energy can effectively control rockburst by changing the characteristics of rock mass, which decreases the probability of rockburst happening. According to characteristics of rockburst, two feasible mining techniques under rockburst conditions are put forward, that is stoping and filling method, and sublevel caving method of mining without any sills in hanging wall. 展开更多
关键词 ROCKBURST ROCKBURST FORECAST ROCKBURST CONTROL mining method
在线阅读 下载PDF
Key factor analysis and model establishment of variation of rock face temperature in a deep open-pit mine 被引量:5
7
作者 WANG Yuan DU Cui-feng +1 位作者 JIN Wen-bo WANG Pu-yu 《Journal of Central South University》 SCIE EI CAS CSCD 2018年第7期1786-1798,共13页
In recent years, with the increase of the depth of open-pit mining, the pollution level has been on the rise due to harmful gases and dust occurring in the process of mining. In order to accelerate the diffusion of th... In recent years, with the increase of the depth of open-pit mining, the pollution level has been on the rise due to harmful gases and dust occurring in the process of mining. In order to accelerate the diffusion of these air pollutants, the distributed regularity of the rock face temperature which is directly related to the air ventilation in deep open-pit mines should be studied. Here, we establish the key factors influencing the rock face temperature in a deep open-pit mine. We also present an empirical model of the rock face temperature variation in the deep open-pit mine, of which the performance is interestingly high compared with that of the field test. This study lays a foundation to study the ventilation thermodynamic theory in the deep open-pit mine, which is of great importance for theoretical studies and engineering applications of solving air pollution problem in deep open-pit mines. 展开更多
关键词 deep open-pit mine distributed regularity of rock face temperature dimensional analysis nonlinear regression analysis
在线阅读 下载PDF
Application of reliability-centered maintenance for productivity improvement of open pit mining equipment:Case study of Sungun Copper Mine 被引量:5
8
作者 Amin Moniri Morad Mohammad Pourgol-Mohammad Javad Sattarvand 《Journal of Central South University》 SCIE EI CAS 2014年第6期2372-2382,共11页
Equipment plays an important role in open pit mining industry and its cost competence at efficient operation and maintenance techniques centered on reliability can lead to significant cost reduction.The application of... Equipment plays an important role in open pit mining industry and its cost competence at efficient operation and maintenance techniques centered on reliability can lead to significant cost reduction.The application of optimal maintenance process was investigated for minimizing the equipment breakdowns and downtimes in Sungun Copper Mine.It results in the improved efficiency and productivity of the equipment and lowered expenses as well as the increased profit margin.The field operating data of 10 trucks are used to estimate the failure and maintenance profile for each component,and modeling and simulation are accomplished by using reliability block diagram method.Trend analysis was then conducted to select proper probabilistic model for maintenance profile.Then reliability of the system was evaluated and importance of each component was computed by weighted importance measure method.This analysis led to identify the items with critical impact on availability of overall equipment in order to prioritize improvement decisions.Later,the availability of trucks was evaluated using Monte Carlo simulation and it is revealed that the uptime of the trucks is around 11000 h at 12000 operation hours.Finally,uncertainty analysis was performed to account for the uncertainty sources in data and models. 展开更多
关键词 operating costs maintenance mining dump truck RELIABILITY AVAILABILITY UNCERTAINTY
在线阅读 下载PDF
Stability and reliability of pit slopes in surface mining combined with underground mining in Tonglushan mine 被引量:10
9
作者 罗一忠 吴爱祥 +1 位作者 刘湘平 王洪江 《Journal of Central South University of Technology》 EI 2004年第4期434-439,共6页
Slope stability is of critical importance in the process of surface-underground mining combination. The influence of underground mining on pit slope stability was mainly discussed, and the self-stabilization of underg... Slope stability is of critical importance in the process of surface-underground mining combination. The influence of underground mining on pit slope stability was mainly discussed, and the self-stabilization of underground stopes was also studied. The random finite element method was used to analyze the probability of the rock mass stability degree of both pit slopes and underground stopes. Meanwhile, 3D elasto-plastic finite element method was used to research into the stress, strain and rock mass failure resulting from mining. The results of numerical simulation indicate that the mining of the underground test stope has certain influence on the stability of the pit slope, but the influence is not great. The safety factor of pit slope is decreased by 0.06, and the failure probability of the pit slope is increased by 1.84%. In addition, the strata yielding zone exists around the underground test stope. The results basically conform to the information coming from the field monitoring. 展开更多
关键词 surface-underground mining combination STABILITY RELIABILITY random finite element method (numerical simulation)
在线阅读 下载PDF
Improving performance of open-pit mine production scheduling problem under grade uncertainty by hybrid algorithms 被引量:2
10
作者 Kamyar TOLOUEI Ehsan MOOSAVI +2 位作者 Amir Hossein BANGIAN TABRIZI Peyman AFZAL Abbas AGHAJANI BAZZAZI 《Journal of Central South University》 SCIE EI CAS CSCD 2020年第9期2479-2493,共15页
One of the surface mining methods is open-pit mining,by which a pit is dug to extract ore or waste downwards from the earth’s surface.In the mining industry,one of the most significant difficulties is long-term produ... One of the surface mining methods is open-pit mining,by which a pit is dug to extract ore or waste downwards from the earth’s surface.In the mining industry,one of the most significant difficulties is long-term production scheduling(LTPS)of the open-pit mines.Deterministic and uncertainty-based approaches are identified as the main strategies,which have been widely used to cope with this problem.Within the last few years,many researchers have highly considered a new computational type,which is less costly,i.e.,meta-heuristic methods,so as to solve the mine design and production scheduling problem.Although the optimality of the final solution cannot be guaranteed,they are able to produce sufficiently good solutions with relatively less computational costs.In the present paper,two hybrid models between augmented Lagrangian relaxation(ALR)and a particle swarm optimization(PSO)and ALR and bat algorithm(BA)are suggested so that the LTPS problem is solved under the condition of grade uncertainty.It is suggested to carry out the ALR method on the LTPS problem to improve its performance and accelerate the convergence.Moreover,the Lagrangian coefficients are updated by using PSO and BA.The presented models have been compared with the outcomes of the ALR-genetic algorithm,the ALR-traditional sub-gradient method,and the conventional method without using the Lagrangian approach.The results indicated that the ALR is considered a more efficient approach which can solve a large-scale problem and make a valid solution.Hence,it is more effectual than the conventional method.Furthermore,the time and cost of computation are diminished by the proposed hybrid strategies.The CPU time using the ALR-BA method is about 7.4%higher than the ALR-PSO approach. 展开更多
关键词 open-pit mine long-term production scheduling grade uncertainty augmented Lagrangian relaxation particle swarm optimization algorithm bat algorithm
在线阅读 下载PDF
Mechanism,prevention,and control of mining-induced dynamic disasters in underground metal mines in China:Challenges and solutions 被引量:2
11
作者 LI Peng CAI Mei-feng +3 位作者 MIAO Sheng-jun REN Fen-hua GORJIAN Mostafa PENG Chao 《Journal of Central South University》 SCIE EI CAS CSCD 2024年第8期2549-2606,共58页
Metal mineral resources play an indispensable role in the development of the national economy.Dynamic disasters in underground metal mines seriously threaten mining safety,which are major scientific and technological ... Metal mineral resources play an indispensable role in the development of the national economy.Dynamic disasters in underground metal mines seriously threaten mining safety,which are major scientific and technological problems to be solved urgently.In this article,the occurrence status and grand challenges of some typical dynamic disasters involving roof falling,spalling,collapse,large deformation,rockburst,surface subsidence,and water inrush in metal mines in China are systematically presented,the characteristics of mining-induced dynamic disasters are analyzed,the examples of dynamic disasters occurring in some metal mines in China are summarized,the occurrence mechanism,monitoring and early warning methods,and prevention and control techniques of these disasters are highlighted,and some new opinions,suggestions,and solutions are proposed simultaneously.Moreover,some shortcomings in current disaster research are pointed out,and the direction of efforts to improve the prevention and control level of dynamic disasters in China’s metal mines in the future is prospected.The integration of forward-looking key innovative theories and technologies in the abovementioned aspects will greatly enhance the cognitive level of disaster prevention and mitigation in China’s metal mining industry and achieve a significant shift from passive disaster relief to active disaster prevention. 展开更多
关键词 underground metal mines dynamic disasters MECHANISM monitoring and early warning prevention and control
在线阅读 下载PDF
Study on Influencing Factors and Planning Model of Mining Quantity about Mineral Resources in Open Pit
12
作者 KE Lihua CHEN Jie 《矿物学报》 CAS CSCD 北大核心 2013年第S1期41-41,共1页
According to the particularity of the open pit, the main influencing factors of mining quantity about mineral resources have been summarized systematically in life cycle and the structured hierarchical relation of its... According to the particularity of the open pit, the main influencing factors of mining quantity about mineral resources have been summarized systematically in life cycle and the structured hierarchical relation of its influencing factors has been constructed. In the light of the production process of open pit, the functional relationships between investment, mining cost and mining quantity have been defined based on the process of mining and loading so that the relation of the life cycle cost and mining quantity can be set up. And what’s more, in order to obtain the maximum economic profit of mining enterprises in life cycle, the planning model of mining quantity has been established based on the life cycle cost. The rational distribution of mining quantity will have been found on the condition of obtaining optimal solution about the planning model so as to determine scientifically the production scale of mining enterprises from the point of view of the sustainable development. 展开更多
关键词 OPEN PIT mining quantity LIFE-CYCLE COST PLANNING model
在线阅读 下载PDF
Measurement and numerical analysis of influence of key stratum breakage on mine pressure in top-coal caving face with super great mining height
13
作者 李猛 张吉雄 +1 位作者 黄艳利 高瑞 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第8期1881-1888,共8页
To analyze the influence of movement in shallow-buried working faces with large mining heights on mine pressure manifestation, the key stratum at a working face was categorised using the 1313 top-coal caving face with... To analyze the influence of movement in shallow-buried working faces with large mining heights on mine pressure manifestation, the key stratum at a working face was categorised using the 1313 top-coal caving face with super great mining height under cover as a case study. The research combined theoretical analysis, field measurement, and numerical simulation to analyze the influencing mechanism of key stratum. Moreover, the research results were verified by numerical simulation and indicate that the sub-key stratum is prone to be broken to form a "cantilever beam" structure rather than a stable hinged structure during the excavation of working faces with super great mining heights. When the "cantilever beam" structure is unstable, a low pressure will occur on the working face, and the overlying strata will subside simultaneously with the sub-key stratum to induce the breakage of the primary key stratum: the breakage will further trigger the periodic breakage of sub-key stratum, causing a greater load on the working face. Finally, steps, and strength of weighting in the working face vary to be great or small alternatively. This is the main reason explaining why the 1313 working face shows strong mine pressure manifestation. The results provide theoretical and practical experience for forecasting and controlling mine pressure manifestation. 展开更多
关键词 super great mining height key stratum cantilever beam mine pressure manifestation under cover
在线阅读 下载PDF
Distribution and Fate of Arsenic in Copper Mining,Beneficiation and Smelting in China
14
作者 HAN Wei WANG Yujing NIE Jinglei 《有色金属(中英文)》 北大核心 2025年第10期1844-1853,共10页
Copper smelting is the main source of arsenic pollution in the environment,and China is the largest country for copper smelting.Taking 2022 as an example,this study analyzes the distribution and fate of arsenic across... Copper smelting is the main source of arsenic pollution in the environment,and China is the largest country for copper smelting.Taking 2022 as an example,this study analyzes the distribution and fate of arsenic across the copper mining,beneficiation,and smelting processes using a life-cycle approach,providing important insights for arsenic pollution prevention and the resource utilization of arsenic-bearing solid waste.The results show that the amount of As in waste rock,tailing and concentrate are 53483 t,86632 t,76162 t,respectively.After smelting treatment,the amount of arsenic in different types of solid waste,wastewater,waste gas and products are 76128 t,1 t,31 t and 2 t,respectively,and the proportion in arsenic sulfide slag is the highest(55%).The amount of emission to the environment is 32 t,accounting for only 0.04%of total amount.In the future,key considerations are to improve the resource utilization rate of arsenic-containing solid waste(tailing,smelting slag),especially arsenic sulfide slag,and to digest its environmental risk. 展开更多
关键词 arsenic contamination copper mining copper beneficiation copper smelting material flow
在线阅读 下载PDF
Identifying potential hazards of opencast mining area using acoustic velocity structure imaging method
15
作者 DONG Long-jun YAN Ming-chun +2 位作者 PEI Zhong-wei ZHANG Yi-han YANG Long-bin 《Journal of Central South University》 2025年第2期405-419,共15页
Identifying potential hazards is crucial for maintaining the structural stability of opencast mining area.To address the limitations of irregular structure and sparse microseismic events in opencast mining monitoring,... Identifying potential hazards is crucial for maintaining the structural stability of opencast mining area.To address the limitations of irregular structure and sparse microseismic events in opencast mining monitoring,this paper proposes an active-source imaging method for identifying potential hazards precisely based on velocity structure.This method innovatively divides the irregular structure into unstructured grids and introduces a damping and smoothing regularization operator into the inversion process,mitigating the ill-posedness caused by the sparse distribution of events and rays.Numerical and laboratory experiments were conducted to verify the reliability and effectiveness of the proposed method.The results demonstrate the competitive performance of the method in identifying hazard areas of varying sizes and numbers.The proposed method shows potential for meeting hazard identification requirements in the complex opencast mining structure.Furthermore,field experiments were conducted on an rare earth mine slope.It confirms that the proposed method provides a more concrete and intuitive scheme for stability monitoring for the microseismic monitoring system.This paper not only demonstrates the application of acoustic structure velocity imaging technology in detecting unstructured potential hazard regions but also provides valuable insights into the construction and maintenance of stable opencast mining area. 展开更多
关键词 opencast mining traveltime tomography ray tracing velocity structure
在线阅读 下载PDF
An innovative N00 mining approach for protecting entries and mining panels
16
作者 ZHANG Jun HE Man-chao +7 位作者 WANG Ya-jun YANG Gang HOU Shi-lin CHEN Yu-wen KANG Xu-hui SHI Zhen FU Qiang DU Fu-kang 《Journal of Central South University》 2025年第9期3514-3538,共25页
Addressing the issues of significant entry settlement and severe mining pressure manifestations in the conventional 121 approach,an innovative N00 approach is proposed.By comparing the mining process and entry formati... Addressing the issues of significant entry settlement and severe mining pressure manifestations in the conventional 121 approach,an innovative N00 approach is proposed.By comparing the mining process and entry formation process of different approaches,the characteristics of entry roof settlement evolution under different approaches are obtained.The N00 approach,which incorporates roof cutting and NPR cable support,optimizes the mining and entry formation process to reduce the settlement phase of entry roof,decreases the settlement of entry roof,and enhances the steadiness of entry roof.The N00 approach modifies the entry roof structure through roof cutting and establishes a hydraulic support load mechanics model for the mining panel to derive the theoretical load pressure formula for the N00 approach’s hydraulic support.Compared with the conventional 121 approach,the pressure on the N00 approach’s hydraulic support is reduced.Empirical data obtained through field monitoring demonstrate that the N00 approach has reduced the roof settlement of the entry and weakened the mining pressure manifestation at the mining panel,achieving the goal of protecting the entry and mining panel. 展开更多
关键词 N00 approach entry formation process roof cutting roof settlement mining pressure manifestation
在线阅读 下载PDF
Determination of support mechanical mechanism of pre-stressed expandable props to stope roof in room-and-pillar mining
17
作者 LI Kun-meng WANG Yong-jiang +3 位作者 LIU Kai LI Yuan-hui FU Zheng-chun PANG Bo-xue 《Journal of Central South University》 2025年第9期3539-3556,共18页
This study is to determine the support mechanism of pre-stressed expandable props for the stope roof in room- and-pillar mining, which is crucial for maintaining stability and preventing roof collapse in mines. Utiliz... This study is to determine the support mechanism of pre-stressed expandable props for the stope roof in room- and-pillar mining, which is crucial for maintaining stability and preventing roof collapse in mines. Utilizing an engineering case from a gold mine in Dandong, China, a laboratory-based similar test is conducted to extract the actual roof characteristic curve. This test continues until the mining stope collapses due to a U-shaped failure. Concurrently, a semi-theoretical method for obtaining the roof characteristic curve is proposed and verified against the actual curve. The semi-theoretical method calculated that the support force and vertical displacement at the demarcation point between the elastic and plastic zones of the roof characteristic curve are 5.0 MPa and 8.20 mm, respectively, corroborating well with the laboratory-based similar test results of 0.22 MPa and 0.730 mm. The weakening factor for the plastic zone in the roof characteristic curve was semi-theoretically estimated to be 0.75. The intersection between the actual roof characteristic curve and the support characteristic curves of expandable props, natural pillars, and concrete props indicates that the expandable prop is the most effective “yielding support” for the stope roof in room-and-pillar mining. That is, the deformation and failure of the stope roof can be effectively controlled with proper release of roof stress. This study provides practical insights for optimizing support strategies in room-and-pillar mining, enhancing the safety and efficiency of mining operations. 展开更多
关键词 expandable prop room-and-pillar mining complex variable function roof characteristic curve support characteristic curve yielding support
在线阅读 下载PDF
基于Web-Log Mining的Web文档聚类 被引量:29
18
作者 苏中 马少平 +1 位作者 杨强 张宏江 《软件学报》 EI CSCD 北大核心 2002年第1期99-104,共6页
速度和效果是聚类算法面临的两大问题.DBSCAN(density based spatial clustering of applications with noise)是典型的基于密度的一种聚类方法,对于大型数据库的聚类实验显示了它在速度上的优越性.提出了一种基于密度的递归聚类算法(re... 速度和效果是聚类算法面临的两大问题.DBSCAN(density based spatial clustering of applications with noise)是典型的基于密度的一种聚类方法,对于大型数据库的聚类实验显示了它在速度上的优越性.提出了一种基于密度的递归聚类算法(recursive density based clustering algorithm,简称RDBC),此算法可以智能地、动态地修改其密度参数.RDBC是基于DBSCAN的一种改进算法,其运算复杂度和DBSCAN相同.通过在Web文档上的聚类实验,结果表明,RDBC不但保留了DBSCAN高速度的优点,而且聚类效果大大优于DBSCAN. 展开更多
关键词 数据库 聚类 数据挖掘 WEB 文档 Web-Logmining
在线阅读 下载PDF
基于Web-Log Mining的N元预测模型 被引量:14
19
作者 苏中 马少平 +1 位作者 杨强 张宏江 《软件学报》 EI CSCD 北大核心 2002年第1期136-141,共6页
随着Web上用户访问信息的不断增加,特别是Web服务器可提供大量的日志文件,使得有可能对这些大数据集进行知识挖掘,例如,对用户未来的访问进行预测.提出了一种利用服务器日志文件,运用N元(N-gram)预测模型对用户未来可能进行的Web访问请... 随着Web上用户访问信息的不断增加,特别是Web服务器可提供大量的日志文件,使得有可能对这些大数据集进行知识挖掘,例如,对用户未来的访问进行预测.提出了一种利用服务器日志文件,运用N元(N-gram)预测模型对用户未来可能进行的Web访问请求进行预测.这种模型会选择性地对用户可预测的请求进行预测,从而大大提高了预测精度.实验证明,在自然语言中普遍适用的N元预测模型同样适用于网页预测.同时,采用了一种有效的简化手段,大大压缩了模型的大小,使得5元模型和传统的2元模型大小基本相同,而预测精度提高了1倍.该结果可以广泛地运用到Web上,包括网页的预发送、预取、推荐以及Web上的caching机制.试验是建立在真实的Web日志上的,该算法无论在预测精度上还是在可适用度上都优于以往的算法. 展开更多
关键词 数据挖掘 INTERNET Web-Logmining N元预测模型 网页
在线阅读 下载PDF
基于DIMINE软件的采矿方法真三维设计研究与实现 被引量:20
20
作者 房智恒 王李管 何远富 《金属矿山》 CAS 北大核心 2009年第5期129-131,137,共4页
研究了数字矿山建设过程中采矿方法真三维设计实现的关键技术问题,分析了采矿方法真三维设计在数字矿山建设过程中的意义,借助于DIMINE矿山软件实现了矿山采矿方法真三维设计。结果表明,在矿山采矿方法设计中,应用可视化真三维技术不仅... 研究了数字矿山建设过程中采矿方法真三维设计实现的关键技术问题,分析了采矿方法真三维设计在数字矿山建设过程中的意义,借助于DIMINE矿山软件实现了矿山采矿方法真三维设计。结果表明,在矿山采矿方法设计中,应用可视化真三维技术不仅十分必要,而且完全可行,它突破了传统的设计模式和方法,极大提高了采矿方法设计的工作效率,使采矿方法的设计更加直观、形象、容易理解,应用前景必将越来越广泛。 展开更多
关键词 数字矿山 采矿方法设计三维可视化 采准切割
在线阅读 下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部