期刊文献+
共找到13,848篇文章
< 1 2 250 >
每页显示 20 50 100
Model test to investigate failure mechanism and loading characteristics of shallow-bias tunnels with small clear distance 被引量:11
1
作者 雷明锋 林大涌 +3 位作者 杨伟超 施成华 彭立敏 黄娟 《Journal of Central South University》 SCIE EI CAS CSCD 2016年第12期3312-3321,共10页
Based on the similarity theory,a tunnel excavation simulation testing system under typical unsymmetrical loading conditions was established.Using this system,the failure mechanism of surrounding rock of shallow-bias t... Based on the similarity theory,a tunnel excavation simulation testing system under typical unsymmetrical loading conditions was established.Using this system,the failure mechanism of surrounding rock of shallow-bias tunnels with small clear distance was analyzed along with the load characteristics.The results show that:1) The failure process of surrounding rock of shallow-bias tunnels with small clear distance consists of structural and stratum deformation induced by tunnel excavation; Microfracture surfaces are formed in the tunnel surrounding rock and extend deep into the rock mass in a larger density; Tensile cracking occurs in shallow position on the deep-buried side,with shear slip in deep rock mass.In the meantime,rapid deformation and slip take place on the shallow-buried side until the surrounding rocks totally collapse.The production and development of micro-fracture surfaces in the tunnel surrounding rock and tensile cracking in the shallow position on the deep-buried side represent the key stages of failure.2) The final failure mode is featured by an inverted conical fracture with tunnel arch as its top and the slope at tunnel entrance slope as its bottom.The range of failure on the deep-buried side is significantly larger than that on the shallow-buried side.Such difference becomes more prominent with the increasing bias angle.What distinguishes it from the "linear fracture surface" model is that the model proposed has a larger fracture angle on the two sides.Moreover,the bottom of the fracture is located at the springing line of tunnel arch.3) The total vertical load increases with bias angle.Compared with the existing methods,the unsymmetrical loading effect in measurement is more prominent.At last,countermeasures are proposed according to the analysis results: during engineering process,1) The surrounding rock mass on the deep-buried side should be reinforced apart from the tunnel surrounding rock for shallow-buried tunnels with small clear distance; moreover,the scope of consolidation should go beyond the midline of tunnel(along the direction of the top of slope) by 4 excavation spans of single tunnel.2) It is necessary to modify the load value of shallow-bias tunnels with small clear distance. 展开更多
关键词 shallow-bias tunnels with small spacing failure mechanism loading characteristics model test
在线阅读 下载PDF
Water shutoff model test in water-rich sandy stratum by phosphoric acid-water glass grout 被引量:5
2
作者 杨宇友 倪茂光 《Journal of Central South University》 SCIE EI CAS 2014年第10期4014-4020,共7页
The rheological behavior of phosphoric acid-water glass grout in different mixing ratios was studied. Grout made of water glass with Baume degree of 20° and 13.4% phosphoric acid by 1:1 volume ratio is found to b... The rheological behavior of phosphoric acid-water glass grout in different mixing ratios was studied. Grout made of water glass with Baume degree of 20° and 13.4% phosphoric acid by 1:1 volume ratio is found to be more effective in stopping water. Laboratory model test of water shutoff by grouting was conducted. Test results show that the diffusion length and water cutoff effect of the grout are significantly improved as the grout head is raised, due to the dilution of underground water, and it takes the grout longer than its gel time to cut off water. 展开更多
关键词 water-rich sandy stratum phosphoric acid-water glass grout grouting water shutoff model test
在线阅读 下载PDF
Model test on vertical bearing capacity of X-section concrete pile raft foundation in silica sand 被引量:4
3
作者 XU Lai PENG Yu +1 位作者 DING Xuan-ming LIU Jia-yi 《Journal of Central South University》 SCIE EI CAS CSCD 2020年第6期1861-1869,共9页
To reveal the bearing capacity of the X-section concrete piles pile raft foundation in silica sand,a series of vertical load tests are carried out.The X-section concrete piles are compared with circular section pile w... To reveal the bearing capacity of the X-section concrete piles pile raft foundation in silica sand,a series of vertical load tests are carried out.The X-section concrete piles are compared with circular section pile with the same section area.The load−settlement curves,axial force and skin friction,strain on concave and convex edge of the pile,pile-sand stress ratio,distributions of side and tip resistance are presented.The results show that bearing capacity of the X section concrete pile raft foundation is much larger than that of the circular pile raft foundation.Besides,compared with the circular pile,the peak axial force of X-section piles under raft is deeper and smaller while the neutral point of X-section concrete pile is deeper.Moreover,the strain on the concave edge is much larger than that on the convex edge of the pile,and the convex edge has more potential in bearing capacity as the vertical load increases.The X-section pile has higher pile-sand stress ratios and load-sharing between side resistance and tip resistance.Above all,the X-section concrete pile can significantly increase the bearing capacity of pile-raft foundations in silica sand. 展开更多
关键词 X-section pile pile raft foundation model test neutral point pile-soil stress ratio
在线阅读 下载PDF
Factors affecting thin coal seam shearer drum coal-loading performance by a model test method 被引量:3
4
作者 GAO Kui-dong XU Wen-bo +1 位作者 JIANG Shou-bo DU Chang-long 《Journal of Central South University》 SCIE EI CAS CSCD 2019年第6期1619-1636,共18页
To solve the problem of a low coal-loading rate being exhibited by the drum shearer on Chinese thin coal seams,systematic tests and research were performed to study the pivotal factors’influences on drum coal-loading... To solve the problem of a low coal-loading rate being exhibited by the drum shearer on Chinese thin coal seams,systematic tests and research were performed to study the pivotal factors’influences on drum coal-loading rate using a model test method.The effects of the drum hub diameter,cutting depth,vane helix angle,drum rotation speed and hauling speed on drum coal-loading rate were determined under circumstances of coal-loading with drum ejection and pushing modes,and reasons for these phenomena were analyzed.The results indicate that the influence of the drum cutting depth on the drum coal-loading rate is the most significant.The parameters of hub diameter,drum rotation speed and hauling speed can influence the drum coal-loading rate by cutting the coals’filling rate in the drum.The parameters of vane helix angle and drum rotation speed can influence drum coal-loading rates by influencing the ratio of cutting coals’tangential and axial speed in the drum.The coal-loading rate with drum ejection is clearly higher than that observed with drum pushing.Research in this study can provide support to design the drum structure and select drum operational parameters for a thin coal seam shearer. 展开更多
关键词 thin coal seam SHEARER CUTTING DRUM coal-loading rate model test
在线阅读 下载PDF
Centrifugal model test and numerical simulation of vertical earth pressure on soft foundation box culvert 被引量:3
5
作者 张军辉 姚永胜 +1 位作者 郑健龙 张涛 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第9期3556-3563,共8页
To obtain the vertical earth pressure on a soft foundation box culvert and investigate the interaction of the soil-culvert-foundation system, both a centrifugal model test and a numerical simulation were conducted and... To obtain the vertical earth pressure on a soft foundation box culvert and investigate the interaction of the soil-culvert-foundation system, both a centrifugal model test and a numerical simulation were conducted and the comparisons with the current methods to determine the load on a culvert were completed. The results of the model test and numerical analysis are in satisfactory agreement, which shows that the direction of the shear stress between the culvert and the adjacent embankment depends on the differential settlement between them. A vertical earth pressure concentration appears on the culvert with a rigid piles foundation because of a downward shear stress. The ratio of the load on a soft foundation culvert and the overburden pressure above the culvert raises first and then decreases as the backfill height increases. In order to reduce the load on a culvert, it is suggested to limit the stiffness difference of the foundations under the culvert and embankment and to use a light backfill over the culvert. 展开更多
关键词 box culvert vertical earth pressure soft foundation centrifugal model test
在线阅读 下载PDF
Design and implementation of model test installation of heave compensation system of deepsea mining 被引量:2
6
作者 胡琼 刘少军 郑皓 《Journal of Central South University》 SCIE EI CAS 2011年第3期642-649,共8页
In order to validate the simulation model and develop heave compensation control strategy,heave compensation model tests were performed.The model test installation includes themining ship motion simulator,the heave co... In order to validate the simulation model and develop heave compensation control strategy,heave compensation model tests were performed.The model test installation includes themining ship motion simulator,the heave compensation system,the lifting pipe simulator,the buffer simulator and the water pool.The tests ofmining ship motion simulator show that it is able to perform under the predetermined attitude path smoothly and can meet the requirements of themining ship motions.The heave compensation effect is more than 60% under random wave and the goal is set to be 50%.The model test results indicate that this heave compensation system is effective and feasible. 展开更多
关键词 deepsea mining heave compensation model test installation mining ship motion simulator gimbal
在线阅读 下载PDF
Model tests on uplift capacity of double-belled pile influenced by distance between bells
7
作者 SUN Tao CUI Xin-zhuang +5 位作者 SUN Yan-feng HAN Ruo-nan MA Rui-jin YANG Jun-jie WANG Yi-lin CHANG Yu-jun 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第5期1630-1640,共11页
To optimize the distance between the bells in pile design,this paper reports a series of small scale tests on the uplift capacity of double belled piles embedded in dry dense sand considering different bell space rati... To optimize the distance between the bells in pile design,this paper reports a series of small scale tests on the uplift capacity of double belled piles embedded in dry dense sand considering different bell space ratios.Finite element modelling is also performed to evaluate the range of soil failure around the piles during pile uplift displacement.Test results show that when bell space ratio is 6 or 8,the uplift capacity reaches the peak value.The upper bell bears more load than the lower one for the piles with bell space ratio less than 6,while the lower bell bears more load than the upper one for the piles with bell space ratio larger than 8. 展开更多
关键词 doubled-belled pile optimized distance uplift bearing capacity model test sand foundation
在线阅读 下载PDF
Explosion resistance performance of reinforced concrete box girder coated with polyurea:Model test and numerical simulation
8
作者 Guangpan Zhou Rong Wang +2 位作者 Mingyang Wang Jianguo Ding Yuye Zhang 《Defence Technology(防务技术)》 SCIE EI CAS CSCD 2024年第3期1-18,共18页
To study the anti-explosion protection effect of polyurea coating on reinforced concrete box girder,two segmental girder specimens were made at a scale of 1:3,numbered as G(without polyurea coating)and PCG(with polyur... To study the anti-explosion protection effect of polyurea coating on reinforced concrete box girder,two segmental girder specimens were made at a scale of 1:3,numbered as G(without polyurea coating)and PCG(with polyurea coating).The failure characteristics and dynamic responses of the specimens were compared through conducting explosion tests.The reliability of the numerical simulation using LS-DYNA software was verified by the test results.The effects of different scaled distances,reinforcement ratios,concrete strengths,coating thicknesses and ranges of polyurea were studied.The results show that the polyurea coating can effectively enhance the anti-explosion performance of the girder.The top plate of middle chamber in specimen G forms an elliptical penetrating hole,while that in specimen PCG only shows a very slight local dent.The peak vertical displacement and residual displacement of PCG decrease by 74.8% and 73.7%,respectively,compared with those of specimen G.For the TNT explosion with small equivalent,the polyurea coating has a more significant protective effect on reducing the size of fracture.With the increase of TNT equivalent,the protective effect of polyurea on reducing girder displacement becomes more significant.The optimal reinforcement ratio,concrete strength,thickness and range of polyurea coating were also drawn. 展开更多
关键词 Explosive load Explosion resistance performance model test POLYUREA Concrete box girder Numerical simulation
在线阅读 下载PDF
Sand deposit-detecting method and its application in model test of sand flow 被引量:2
9
作者 黎伟 房营光 +2 位作者 莫海鸿 谷任国 陈俊生 《Journal of Central South University》 SCIE EI CAS 2013年第10期2840-2848,共9页
Against the background of the sand-flow foundation treatment engineering of Guangzhou Zhoutouzui variable cross-section immersed tunnel, a kind of sand deposit-detecting method was devised on the basis of full-scale m... Against the background of the sand-flow foundation treatment engineering of Guangzhou Zhoutouzui variable cross-section immersed tunnel, a kind of sand deposit-detecting method was devised on the basis of full-scale model test of sand-flow method. The real-time data of sand-deposit height and radius were obtained by the self-developed sand-deposit detectors. The test results show that the detecting method is simple and has high precision. In the use of sand-flow method, the sand-carrying capability of fluid is limited, and sand particles are all transported to the sand-deposit periphery through crater, gap and chutes after the sand deposit formed. The diffusion range of the particles outside the sand-deposit does not exceed 2.0 m. Severe sorting of sand particles is not observed because of the unique oblique-layered depositing process. The temporal and spatial distributions of gap and chutes directly affect the sand-deposit expansion, and the expansion trend of the average sand-deposit radius accords with quadratic time-history curve. 展开更多
关键词 immersed tube TUNNEL FOUNDATION treatment model test of sand-flow method SAND DEPOSIT detecting structural characteristics of sand-deposit
在线阅读 下载PDF
Investigation on the Ice Load on a Cylinder Vertically Breaking through Model Ice Sheet from Underneath
10
作者 ZHAO Wei−hang TIAN Yu−kui +3 位作者 JI Shao−peng GANG Xu−hao YU Chao−ge KONG Shuai 《船舶力学》 北大核心 2025年第6期964-975,共12页
Ice load on underwater vehicles breaking through ice covers from underneath is a significant concern for researchers in polar exploration,and the research on this problem is still in its early stages.Both mechanical e... Ice load on underwater vehicles breaking through ice covers from underneath is a significant concern for researchers in polar exploration,and the research on this problem is still in its early stages.Both mechanical experimental measurement and numerical simulation pose research challenges.This study focuses on the ice load of a cylinder structure breaking upward through the ice sheet form underneath in the Small Ice Model Basin of China Ship Scientific Research Center(CSSRC SIMB).A high-speed camera system was employed to observe the ice sheet failure during the tests,in which,with the loading position as center,local radial cracks and circumferential cracks were generated.A load sensor was used to measure the overall ice load during this process.Meanwhile,a numerical model was developed using LS-DYNA for validation and comparison.With this model,numerical simulation was conducted under various ice thicknesses and upgoing speeds to analyze the instantaneous curves of ice load.The calculation results were statistically analyzed under different working conditions to determine the influence of the factors on the ice load of the cylinder.The study explores the measurement method about ice load of objects vertically breaking through model ice sheet and is expected to provide some fundamental insights into the safety design of underwater structures operating in ice waters. 展开更多
关键词 CYLINDER model test failure mode crack propagation ice load numerical modeling
在线阅读 下载PDF
On modeling approach for embedded real-time software simulation testing 被引量:6
11
作者 Yin Yongfeng Liu Bin Zhong Deming Jiang Tongmin 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2009年第2期420-426,共7页
Modeling technology has been introduced into software testing field. However, how to carry through the testing modeling effectively is still a difficulty. Based on combination of simulation modeling technology and emb... Modeling technology has been introduced into software testing field. However, how to carry through the testing modeling effectively is still a difficulty. Based on combination of simulation modeling technology and embedded real-time software testing method, the process of simulation testing modeling is studied first. And then, the supporting environment of simulation testing modeling is put forward. Furthermore, an approach of embedded real-time software simulation testing modeling including modeling of cross-linked equipments of system under testing (SUT), test case, testing scheduling, and testing system service is brought forward. Finally, the formalized description and execution system of testing models are given, with which we can realize real-time, closed loop, mad automated system testing for embedded real-time software. 展开更多
关键词 embedded real-time software software testing testing modeling SIMULATION
在线阅读 下载PDF
Multiscale Hierarchical Digital Rock Mass Models and Numerical Testing on Mechanical and Hydaulic Properties of Rock Mass 被引量:1
12
作者 Xiaoli Liu~1,Sijing Wang~2,Enzhi Wang~1 1.State Key Laboratory of Hydroscience and Engineering,Tsinghua University,Beijing 100084,China. 2.Institute of Geology and Geophysics of the Chinese Academy of Sciences,Beijing 100029,China 《地学前缘》 EI CAS CSCD 北大核心 2009年第S1期188-188,共1页
Underground space utilization and exploration is an irreversible trend for promoting sustainable development especially in megacities.Geotechnical engineering safety is always one of the most important issues in all p... Underground space utilization and exploration is an irreversible trend for promoting sustainable development especially in megacities.Geotechnical engineering safety is always one of the most important issues in all phases,including planning,design, construction and operation,of the underground project.Engineering geological and hydro-geological characteristics of the foundation rock mass 展开更多
关键词 multiscale HIERARCHICAL DIGITAL ROCK MASS modelS numerical test underground space evaluation of ROCK MASS quality
在线阅读 下载PDF
Determination of Aquifer Parameters by Numerical Model Based on the Large Scale-Pumping Test:A Case Study in Yanqi Basin
13
作者 Jin Gao,Xinguang Dong 1.College of Resources and Environment Science,Xinjiang University,rümqi,China. 2.Xinjiang Water Resources Bureau,rümqi,China 《地学前缘》 EI CAS CSCD 北大核心 2009年第S1期21-21,共1页
The determination of aquifer parameters is the basis for groundwater resource evaluation,development and protection as well as scientific management. Pumping test is a main method to determine the aquifer parameters.H... The determination of aquifer parameters is the basis for groundwater resource evaluation,development and protection as well as scientific management. Pumping test is a main method to determine the aquifer parameters.However,the analytic methods can’t be used to describe the heterogeneous and spatial variant of the parameters in detail.The aquifer parameters derived from analytic methods may lead much uncertainty of groundwater resource evaluation. 展开更多
关键词 PUMPING test PARAMETERS NUMERICAL modelING INVERSION modelING
在线阅读 下载PDF
Optimum design of equivalent accelerated life testing plans based on proportional hazards-proportional odds model 被引量:3
14
作者 Tingting Huang Tongmin Jiang 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2011年第5期871-878,共8页
The optimum design of equivalent accelerated life testing plan based on proportional hazards-proportional odds model using D-optimality is presented. The defined equivalent test plan is the test plan that has the same... The optimum design of equivalent accelerated life testing plan based on proportional hazards-proportional odds model using D-optimality is presented. The defined equivalent test plan is the test plan that has the same value of the determinant of Fisher information matrix. The equivalent test plan of step stress accelerated life testing (SSALT) to a baseline optimum constant stress accelerated life testing (CSALT) plan is obtained by adjusting the censoring time of SSALT and solving the optimization problem for each case to achieve the same value of the determinant of Fisher information matrix as in the baseline optimum CSALT plan. Numer- ical examples are given finally which demonstrate the equivalent SSALT plan to the baseline optimum CSALT plan reduces almost half of the test time while achieving approximately the same estimation errors of model parameters. 展开更多
关键词 equivalent test plan proportional hazards-proportional odds (PH-PO) model D-OPTIMALITY constant stress step stress accelerated life testing (ALT).
在线阅读 下载PDF
Time-dependent behavior comparison of long-span concrete arch bridge between prototype and model 被引量:1
15
作者 WANG Yong-bao QIN Peng-ju +2 位作者 LIU Zhi-hua ZHANG Xiao MAO Min 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第5期1565-1577,共13页
Beipanjiang Bridge is a long-span concrete arch bridges with stiffened skeleton(CABSS)in China.It has a fixed end arch with the span of 445 m and the rise of 100 m.To evaluate the rationality of the construction seque... Beipanjiang Bridge is a long-span concrete arch bridges with stiffened skeleton(CABSS)in China.It has a fixed end arch with the span of 445 m and the rise of 100 m.To evaluate the rationality of the construction sequence and the time-dependent behavior of CABSS,an experimental study of a model bridge was explored.But the measured displacement and stress ratios of arch rib between prototype and model bridge did not subject to linear similarity relation when the time-dependent behavior was considered.So,the three-dimensional finite element models were established,and verified by the measured data.Then,the displacements and stresses of the prototype and model were compared with each other,when the elastic analysis or coupling of temperature and shrinkage,creep effect was considered.Furthermore,a parametric study was studied.The results showed that when the temperature,shrinkage and creep effect of concrete are considered,the finite element analysis results of prototype and model agree well with the measured results.The displacement and stress ratios of prototype and model bridge in construction and bridge completed stage do not present the geometric similarity ratio 7.5 and 1.0,respectively.They are also much influenced by concrete predicting model and variation of temperature. 展开更多
关键词 concrete arch bridge time-dependent behavior finite element model test stiffened skeleton
在线阅读 下载PDF
The damage to model concrete gravity dams subjected to water explosions 被引量:1
16
作者 Shang Ma Ye-qing Chen +3 位作者 Zhen-qing Wang Shu-tao Li Qing Zhu Long-ming Chen 《Defence Technology(防务技术)》 SCIE EI CAS CSCD 2023年第9期119-137,共19页
Over the past century,the safety of dams has gradually attracted attention from all parties.Research on the dynamic response and damage evolution of dams under extreme loads is the basis of dam safety issues.In recent... Over the past century,the safety of dams has gradually attracted attention from all parties.Research on the dynamic response and damage evolution of dams under extreme loads is the basis of dam safety issues.In recent decades,scholars have studied the responses of dams under earthquake loads,but there is still much room for improvement in experimental and theoretical research on small probability loads such as explosions.In this paper,a 50-m-high concrete gravity dam is used as a prototype dam,and a water explosion model test of a 2.5-m-high concrete gravity dam is designed.The water pressure and the acceleration response of the dam body in the test are analysed.The pressure characteristics and dynamic response of the dam body are assessed.Taking the dam damage test as an example,a numerical model of concrete gravity dam damage is established,and the damage evolution of the dam body is analysed.By combining experiments and numerical simulations,the damage characteristics of the dam body under the action of different charge water explosions are clarified.The integrity of the dam body is well maintained under the action of a small-quantity water explosion,and the dynamic response of the dam body is mainly caused by the shock wave.Both the shock wave and the bubble pulsation cause the dam body to accelerate,and the peak acceleration of the dam body under the action of the bubble pulsation is only one percent of the peak acceleration of the dam body under the action of the shock wave.When subjected to explosions in large quantities of water,the dam body is seriously damaged.Under the action of a shock wave,the dam body produces a secondary acceleration response,which is generated by an internal interaction after the dam body is damaged.The damage evolution process of the dam body under the action of a large-scale water explosion is analysed,and it is found that the shock wave pressure of the water explosion causes local damage to the dam body facing the explosion.After the peak value of the shock wave,the impulse continues to act on the dam body,causing cumulative damage and damage inside the dam body. 展开更多
关键词 Underwater explosion Concrete gravity dam model test Damage evolution
在线阅读 下载PDF
Incorporating S-shaped testing-effort functions into NHPP software reliability model with imperfect debugging 被引量:8
17
作者 Qiuying Li Haifeng Li Minyan Lu 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2015年第1期190-207,共18页
Testing-effort(TE) and imperfect debugging(ID) in the reliability modeling process may further improve the fitting and prediction results of software reliability growth models(SRGMs). For describing the S-shaped... Testing-effort(TE) and imperfect debugging(ID) in the reliability modeling process may further improve the fitting and prediction results of software reliability growth models(SRGMs). For describing the S-shaped varying trend of TE increasing rate more accurately, first, two S-shaped testing-effort functions(TEFs), i.e.,delayed S-shaped TEF(DS-TEF) and inflected S-shaped TEF(IS-TEF), are proposed. Then these two TEFs are incorporated into various types(exponential-type, delayed S-shaped and inflected S-shaped) of non-homogeneous Poisson process(NHPP)SRGMs with two forms of ID respectively for obtaining a series of new NHPP SRGMs which consider S-shaped TEFs as well as ID. Finally these new SRGMs and several comparison NHPP SRGMs are applied into four real failure data-sets respectively for investigating the fitting and prediction power of these new SRGMs.The experimental results show that:(i) the proposed IS-TEF is more suitable and flexible for describing the consumption of TE than the previous TEFs;(ii) incorporating TEFs into the inflected S-shaped NHPP SRGM may be more effective and appropriate compared with the exponential-type and the delayed S-shaped NHPP SRGMs;(iii) the inflected S-shaped NHPP SRGM considering both IS-TEF and ID yields the most accurate fitting and prediction results than the other comparison NHPP SRGMs. 展开更多
关键词 testing-effort(TE) imperfect debugging(ID) software reliability growth models(SRGMs) S-shaped non-homogeneous Poisson process(NHPP)
在线阅读 下载PDF
Anti-model测试框架的研究与实现
18
作者 王立新 高翠云 《计算机应用研究》 CSCD 北大核心 2011年第1期167-171,共5页
对于继承的系统或基于组件的系统,常常得不到系统详细的信息,测试这样的系统很困难,采用Anti-model测试思想和方法可以解决此类问题。基于Anti-model测试思想,设计出基于Anti-model的测试框架,详细分析和说明了Anti-model的测试过程中... 对于继承的系统或基于组件的系统,常常得不到系统详细的信息,测试这样的系统很困难,采用Anti-model测试思想和方法可以解决此类问题。基于Anti-model测试思想,设计出基于Anti-model的测试框架,详细分析和说明了Anti-model的测试过程中的几个关键性的技术,包括动态数据的获得、动态数据的存储格式、综合行为模型、修正和精炼系统行为模型、再测试的测试用例的获得等。编程实验表明,本方法具有实用性和可行性。 展开更多
关键词 Anti—model测试 组件 面向方面 测试用例
在线阅读 下载PDF
基于Modelica的电动汽车电池建模与仿真 被引量:6
19
作者 黄锡昌 宗志坚 +1 位作者 陈承鹤 查鸿山 《计算机工程与设计》 CSCD 北大核心 2012年第5期2073-2077,共5页
为了实时仿真电动汽车电池组的动态性能,应用Modelica多领域建模语言建立描述电池组的PNGV等效电路模型。通过电池的动态充放电性能实验标定电池组模型的电阻、电容等参数,并利用Dymola多领域仿真软件进行性能参数求解。将该电池模型应... 为了实时仿真电动汽车电池组的动态性能,应用Modelica多领域建模语言建立描述电池组的PNGV等效电路模型。通过电池的动态充放电性能实验标定电池组模型的电阻、电容等参数,并利用Dymola多领域仿真软件进行性能参数求解。将该电池模型应用在电动汽车整车的仿真分析中,实验结果表明,该模型准确度高,能实时地仿真电动汽车的动力性能。该电池组建模方法实现简单且便于扩展,可以为电动汽车的产品设计、系统性能分析提供有效的解决办法。 展开更多
关键词 电动汽车 计算机仿真 电池建模 多领域建模语言 脉冲电池试验
在线阅读 下载PDF
基于Modelica的汽车转向系统建模仿真及实验验证 被引量:5
20
作者 莫以为 周勇 黄伟 《机械科学与技术》 CSCD 北大核心 2013年第1期86-90,共5页
为研究汽车转向系统的转向性能,在对其进行动力学分析的基础上,采用多领域统一建模语言Modelica在仿真平台Dymola环境下建立转向系统模块、整车模块、轮胎模块及力矩计算模块,并将以上模块连接综合为转向系统整体仿真模型。针对某商用... 为研究汽车转向系统的转向性能,在对其进行动力学分析的基础上,采用多领域统一建模语言Modelica在仿真平台Dymola环境下建立转向系统模块、整车模块、轮胎模块及力矩计算模块,并将以上模块连接综合为转向系统整体仿真模型。针对某商用车的液压助力转向系统搭建了"汽车转向系统参数测量试验台"。通过台架试验测出模型中待定参数,将所得参数输入模型中进行仿真计算,结果表明:原地转向工况下仿真模型能较准确地反映车辆的转向性能。 展开更多
关键词 多领域建模 modelICA 转向系统 台架试验 原地转向
在线阅读 下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部