This paper proposes a joint inspection-based maintenance and spare ordering optimization policy that considers the problem of integrated inspection,preventive maintenance,spare ordering,and quality control for a four-...This paper proposes a joint inspection-based maintenance and spare ordering optimization policy that considers the problem of integrated inspection,preventive maintenance,spare ordering,and quality control for a four-state single-unit manufacturing system.When an inspection detects a minor defect,a second phase inspection is initiated and a regular order is placed.Product quality begins to deteriorate when the system undergoes a severe defect.To counter this,an advanced replacement of the minor defective system is carried out at the Jth second phase inspection.If a severe defect is recognized prior to the Jth inspection,or if system failure occurs,preventive or corrective replacement is executed.The timeliness of replacement depends on the availability of spare.We adopt two modes of ordering:a regular order and an emergency order.Meanwhile,a threshold level is introduced to determine whether an emergency order is preferred even when the regular order is already ordered but has not yet arrived.The optimal joint inspection-based maintenance and spare ordering policy is formulated by minimizing the expected cost per unit time.A simulation algorithm is proposed to obtain the optimal two-phase inspection interval,threshold level and advanced replacement interval.Results from several numerical examples demonstrate that,in terms of the expected cost per unit time,our proposed model is superior to some existing models.展开更多
This paper considers an optimal sequential inspection schedule for a second-hand product after that the free nonrenewable warranty is expired. The length of warranty is prespecified and during the warranty period, the...This paper considers an optimal sequential inspection schedule for a second-hand product after that the free nonrenewable warranty is expired. The length of warranty is prespecified and during the warranty period, the product is minimally repaired by the dealer when it fails. Following the expiration of the non-renewing warranty, the product is inspected and upgraded sequentially a fixed number of times at the expenses of the customer.At each inspection, the failure rate of the product is reduced proportionally so that the product is upgraded. The product is assumed to deteriorate as it ages and the replacement of the product occurs when a fixed number of inspections are rendered. In addition,the intervals between two successive inspections are assumed to decrease monotonically. The main objective of this paper is to determine the optimal improvement level to upgrade the product at each inspection so that the expected maintenance cost during the life cycle of the product is minimized from the perspective of the customer. Under the given cost structures, we derive an explicit formula to obtain the expected maintenance cost incurred during the life cycle of the product and discuss the method to find the optimal level of the improvement analytically in case the failure times follow the Weibull distribution. Numerical results are analyzed to observe the impact of relevant parameters on the optimal solution.展开更多
Component reallocation(CR)is receiving increasing attention in many engineering systems with functionally interchangeable and unbalanced degradation components.This paper studies a CR and system replacement maintenanc...Component reallocation(CR)is receiving increasing attention in many engineering systems with functionally interchangeable and unbalanced degradation components.This paper studies a CR and system replacement maintenance policy of series repairable systems,which undergoes minimal repairs for each emergency failure of components,and considers constant downtime and cost of minimal repair,CR and system replacement.Two binary mixed integer nonlinear programming models are respectively established to determine the assignment of CR,and the uptime right before CR and system replacement with the objective of minimizing the system average maintenance cost and maximizing the system availability.Further,we derive the optimal uptime right before system replacement with maximization of the system availability,and then give the relationship between the system availability and the component failure rate.Finally,numerical examples show that the CR and system replacement maintenance policy can effectively reduce the system average maintenance cost and improve the system availability,and further give the sensitivity analysis and insights of the CR and system replacement maintenance policy.展开更多
基金This work was supported by the National Natural Science Foundation of China(71471015)the Social Science Fund Base Project of Beijing(19JDGLA001).
文摘This paper proposes a joint inspection-based maintenance and spare ordering optimization policy that considers the problem of integrated inspection,preventive maintenance,spare ordering,and quality control for a four-state single-unit manufacturing system.When an inspection detects a minor defect,a second phase inspection is initiated and a regular order is placed.Product quality begins to deteriorate when the system undergoes a severe defect.To counter this,an advanced replacement of the minor defective system is carried out at the Jth second phase inspection.If a severe defect is recognized prior to the Jth inspection,or if system failure occurs,preventive or corrective replacement is executed.The timeliness of replacement depends on the availability of spare.We adopt two modes of ordering:a regular order and an emergency order.Meanwhile,a threshold level is introduced to determine whether an emergency order is preferred even when the regular order is already ordered but has not yet arrived.The optimal joint inspection-based maintenance and spare ordering policy is formulated by minimizing the expected cost per unit time.A simulation algorithm is proposed to obtain the optimal two-phase inspection interval,threshold level and advanced replacement interval.Results from several numerical examples demonstrate that,in terms of the expected cost per unit time,our proposed model is superior to some existing models.
基金supported by the Research Base Construction Fund Support Program funded by Chonbuk National University in 2013the Mid-career Research Program(2016R1A2B4010080)through NRF Grant funded by MEST
文摘This paper considers an optimal sequential inspection schedule for a second-hand product after that the free nonrenewable warranty is expired. The length of warranty is prespecified and during the warranty period, the product is minimally repaired by the dealer when it fails. Following the expiration of the non-renewing warranty, the product is inspected and upgraded sequentially a fixed number of times at the expenses of the customer.At each inspection, the failure rate of the product is reduced proportionally so that the product is upgraded. The product is assumed to deteriorate as it ages and the replacement of the product occurs when a fixed number of inspections are rendered. In addition,the intervals between two successive inspections are assumed to decrease monotonically. The main objective of this paper is to determine the optimal improvement level to upgrade the product at each inspection so that the expected maintenance cost during the life cycle of the product is minimized from the perspective of the customer. Under the given cost structures, we derive an explicit formula to obtain the expected maintenance cost incurred during the life cycle of the product and discuss the method to find the optimal level of the improvement analytically in case the failure times follow the Weibull distribution. Numerical results are analyzed to observe the impact of relevant parameters on the optimal solution.
基金supported by the National Natural Science Foundation of China(72101025,72271049)the Fundamental Research Funds for the Central Universities(FRF-TP-20-073A1)the China Postdoct oral Science Foundation(2021M690349)。
文摘Component reallocation(CR)is receiving increasing attention in many engineering systems with functionally interchangeable and unbalanced degradation components.This paper studies a CR and system replacement maintenance policy of series repairable systems,which undergoes minimal repairs for each emergency failure of components,and considers constant downtime and cost of minimal repair,CR and system replacement.Two binary mixed integer nonlinear programming models are respectively established to determine the assignment of CR,and the uptime right before CR and system replacement with the objective of minimizing the system average maintenance cost and maximizing the system availability.Further,we derive the optimal uptime right before system replacement with maximization of the system availability,and then give the relationship between the system availability and the component failure rate.Finally,numerical examples show that the CR and system replacement maintenance policy can effectively reduce the system average maintenance cost and improve the system availability,and further give the sensitivity analysis and insights of the CR and system replacement maintenance policy.