Computational fluid dynamics(CFD) simulation is an effective approach to develop and optimise gas drainage design for underground longwall coal mining. As part of the project supported by the Australian Government Coa...Computational fluid dynamics(CFD) simulation is an effective approach to develop and optimise gas drainage design for underground longwall coal mining. As part of the project supported by the Australian Government Coal Mining Abatement Technology Support Package(CMATSP), threedimensional CFD simulations were conducted to test and optimise a conceptual design which proposes using horizontal boreholes to replace vertical boreholes at an underground coal mine in Australia.Drainage performance between a vertical borehole and a horizontal borehole was first carried out to compare their capacity and effectiveness. Then a series of cases with different horizontal borehole designs were simulated to optimise borehole configuration parameters such as location, diameter, and number of boreholes. The study shows that the horizontal borehole is able to create low pressure sinks that protect the workings from goaf gas ingresses by changing goaf gas flow directions, and that it has the advantage to continuously maintain such low pressure sinks near the tailgate as the longwall advances. An example of optimising horizontal borehole locations in the longwall lateral direction is also given in this paper.展开更多
It is very difficult to evaluate the productivity of horizontal wells in fault block reservoirs due to the influence of fault sealing.On the basis of the method of images and source-sink theory,a semianalytical model ...It is very difficult to evaluate the productivity of horizontal wells in fault block reservoirs due to the influence of fault sealing.On the basis of the method of images and source-sink theory,a semianalytical model coupling reservoir and finite conductivity horizontal wellbore flow dynamics was built,in which the influence of fault sealing was taken into account.The distribution of wellbore flow and radial inflow profiles along the horizontal interval were also obtained.The impact of the distance between the horizontal well and the fault on the well productivity was quantitatively analyzed.Based on this analysis,the optimal distance between the horizontal well and the fault in banded fault block reservoirs could be determined.According to the field application,the relative error calculated by the model proposed in this paper is within ±15%.It is an effective evaluation method for the productivity of horizontal wells in fault block reservoirs.The productivity of the horizontal well increases logarithmically as the distance between the horizontal well and the fault increases.The optimal distance between the horizontal well and the fault is 0.25-0.3 times the horizontal well length.展开更多
Temperature drop is commonly observed in subsea vertical X-mas trees during shutdown.The presence of a huge temperature difference between internal crude oil and external seawater can cause severe equipment degradatio...Temperature drop is commonly observed in subsea vertical X-mas trees during shutdown.The presence of a huge temperature difference between internal crude oil and external seawater can cause severe equipment degradation of the oil flow channel(e.g.,hydrate precipitation),which can block the oil flow channel and interrupt the production process.The most vulnerable parts of a subsea vertical X-mas tree tend to be components with high convective heat transfer rates,such as production modules and short joints.We proposed an innovative approach for the insulation design of underwater equipment under a shutdown condition.First,we obtained a heat transfer analysis of the tree under working conditions through computational fluid dynamics to ascertain the initial temperature condition for an unsteadystate analysis.Second,we investigated the unsteady heat transfer characteristics of the tree with an insulation layer in the shutdown state and derived the relationships between insulation duration and thickness by data analysis.We used data analysis to identify the relationship between insulation duration and thickness.Finally,we derived the empirical formula of insulation thickness for underwater equipment given the effect of environmental factors on the heat preservation effect.We performed the experiment with an oil pipeline,and the results showed that the internal oil of the equipment did not hydrate within 8 h under the shutdown condition with insulation layers.展开更多
In order to obtain accurate conflict risks in terminal airspace design,the concept and calculation model of potential conflict frequency for intersected routes are proposed.Conflict frequency is represented by the pro...In order to obtain accurate conflict risks in terminal airspace design,the concept and calculation model of potential conflict frequency for intersected routes are proposed.Conflict frequency is represented by the product of horizontal conflict frequency and vertical conflict probability.The horizontal conflict frequency is derived from the probability density distribution of conflicts in a period of time.Based on the recorded radar trajectory data,the concept and model of ROUTE distance are proposed,and the probability density function of aircraft height at a specified ROUTE distance is deduced by kernel density estimation.Furthermore,vertical conflict probability and its horizontal distribution are achieved.Examples of three intersected arrival and departure route design schemes are studied.Compared with scheme 1,the conflict frequency values of the other two improved schemes decrease to53% and 24%,respectively.The results show that the model can quantify potential conflict frequency of intersected routes.展开更多
According to the variable toe-to-heel well spacing, combined with the dislocation theory, discrete lattice method, and finite-element-method(FEM) based fluid-solid coupling, an integrated geological-engineering method...According to the variable toe-to-heel well spacing, combined with the dislocation theory, discrete lattice method, and finite-element-method(FEM) based fluid-solid coupling, an integrated geological-engineering method of volume fracturing for fan-shaped well pattern is proposed considering the geomechanical modeling, induced stress calculation, hydraulic fracturing simulation, and post-frac productivity evaluation. Besides, we propose the differential fracturing design for the conventional productivity-area and the potential production area for fan-shaped horizontal wells. After the fracturing of the conventional production area for H1 fan-shaped well platform, the research shows that the maximum reduction of the horizontal principal stress difference in the potential productivity-area is 0.2 MPa, which cannot cause the stress reversal, but this reduction is still conducive to the lateral propagation of hydraulic fractures. According to the optimized fracturing design, in zone-Ⅰ of the potential production area, only Well 2 is fractured, with a cluster spacing of 30 m and an injection rate of 12 m^(3)/min per stage;in zone-Ⅱ, Well 2 is fractured before Well 3, with a cluster spacing of 30 m and an injection rate of 12 m^(3)/min per stage. The swept area of the pore pressure drop in the potential production area is small, showing that the reservoir is not well developed. The hydraulic fracturing in the toe area can be improved by, for example, properly densifying the fractures and adjusting the fracture distribution, in order to enhance the swept volume and increase the reservoir utilization.展开更多
基金the Department of Industry and Science,Australian Government for funding this researchthe management and staff of Glencore Bulga Underground Operations for their significant contributions in this project
文摘Computational fluid dynamics(CFD) simulation is an effective approach to develop and optimise gas drainage design for underground longwall coal mining. As part of the project supported by the Australian Government Coal Mining Abatement Technology Support Package(CMATSP), threedimensional CFD simulations were conducted to test and optimise a conceptual design which proposes using horizontal boreholes to replace vertical boreholes at an underground coal mine in Australia.Drainage performance between a vertical borehole and a horizontal borehole was first carried out to compare their capacity and effectiveness. Then a series of cases with different horizontal borehole designs were simulated to optimise borehole configuration parameters such as location, diameter, and number of boreholes. The study shows that the horizontal borehole is able to create low pressure sinks that protect the workings from goaf gas ingresses by changing goaf gas flow directions, and that it has the advantage to continuously maintain such low pressure sinks near the tailgate as the longwall advances. An example of optimising horizontal borehole locations in the longwall lateral direction is also given in this paper.
基金support from the National Science & Technology Major Project of China (No. 2009ZX05009-006)the China National Offshore Oil Corporation (CNOOC)
文摘It is very difficult to evaluate the productivity of horizontal wells in fault block reservoirs due to the influence of fault sealing.On the basis of the method of images and source-sink theory,a semianalytical model coupling reservoir and finite conductivity horizontal wellbore flow dynamics was built,in which the influence of fault sealing was taken into account.The distribution of wellbore flow and radial inflow profiles along the horizontal interval were also obtained.The impact of the distance between the horizontal well and the fault on the well productivity was quantitatively analyzed.Based on this analysis,the optimal distance between the horizontal well and the fault in banded fault block reservoirs could be determined.According to the field application,the relative error calculated by the model proposed in this paper is within ±15%.It is an effective evaluation method for the productivity of horizontal wells in fault block reservoirs.The productivity of the horizontal well increases logarithmically as the distance between the horizontal well and the fault increases.The optimal distance between the horizontal well and the fault is 0.25-0.3 times the horizontal well length.
基金financed by the Scientific Research Project of Ocean Engineering Equipment,Ministry of Industry and Information Technology of China。
文摘Temperature drop is commonly observed in subsea vertical X-mas trees during shutdown.The presence of a huge temperature difference between internal crude oil and external seawater can cause severe equipment degradation of the oil flow channel(e.g.,hydrate precipitation),which can block the oil flow channel and interrupt the production process.The most vulnerable parts of a subsea vertical X-mas tree tend to be components with high convective heat transfer rates,such as production modules and short joints.We proposed an innovative approach for the insulation design of underwater equipment under a shutdown condition.First,we obtained a heat transfer analysis of the tree under working conditions through computational fluid dynamics to ascertain the initial temperature condition for an unsteadystate analysis.Second,we investigated the unsteady heat transfer characteristics of the tree with an insulation layer in the shutdown state and derived the relationships between insulation duration and thickness by data analysis.We used data analysis to identify the relationship between insulation duration and thickness.Finally,we derived the empirical formula of insulation thickness for underwater equipment given the effect of environmental factors on the heat preservation effect.We performed the experiment with an oil pipeline,and the results showed that the internal oil of the equipment did not hydrate within 8 h under the shutdown condition with insulation layers.
基金Supported by the National Natural Science Foundation of China(61039001)the State Technology Supporting Plan(2011BAH24B08)
文摘In order to obtain accurate conflict risks in terminal airspace design,the concept and calculation model of potential conflict frequency for intersected routes are proposed.Conflict frequency is represented by the product of horizontal conflict frequency and vertical conflict probability.The horizontal conflict frequency is derived from the probability density distribution of conflicts in a period of time.Based on the recorded radar trajectory data,the concept and model of ROUTE distance are proposed,and the probability density function of aircraft height at a specified ROUTE distance is deduced by kernel density estimation.Furthermore,vertical conflict probability and its horizontal distribution are achieved.Examples of three intersected arrival and departure route design schemes are studied.Compared with scheme 1,the conflict frequency values of the other two improved schemes decrease to53% and 24%,respectively.The results show that the model can quantify potential conflict frequency of intersected routes.
基金Supported by National Natural Science Foundation of China (52104029,U2139204)PetroChina Science and Technology Innovation Foundation (2021 DQ02-0501)。
文摘According to the variable toe-to-heel well spacing, combined with the dislocation theory, discrete lattice method, and finite-element-method(FEM) based fluid-solid coupling, an integrated geological-engineering method of volume fracturing for fan-shaped well pattern is proposed considering the geomechanical modeling, induced stress calculation, hydraulic fracturing simulation, and post-frac productivity evaluation. Besides, we propose the differential fracturing design for the conventional productivity-area and the potential production area for fan-shaped horizontal wells. After the fracturing of the conventional production area for H1 fan-shaped well platform, the research shows that the maximum reduction of the horizontal principal stress difference in the potential productivity-area is 0.2 MPa, which cannot cause the stress reversal, but this reduction is still conducive to the lateral propagation of hydraulic fractures. According to the optimized fracturing design, in zone-Ⅰ of the potential production area, only Well 2 is fractured, with a cluster spacing of 30 m and an injection rate of 12 m^(3)/min per stage;in zone-Ⅱ, Well 2 is fractured before Well 3, with a cluster spacing of 30 m and an injection rate of 12 m^(3)/min per stage. The swept area of the pore pressure drop in the potential production area is small, showing that the reservoir is not well developed. The hydraulic fracturing in the toe area can be improved by, for example, properly densifying the fractures and adjusting the fracture distribution, in order to enhance the swept volume and increase the reservoir utilization.