Top-coal deformation control of gob-side entry with narrow pillars and its application for fully mechanized mining face 被引量:3
1
作者 Qi Fangkun Zhou Yuejin +3 位作者 Li Jiawei Wang Erqian Cao Zhengzheng Li Ning 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第3期417-422,共6页
A mechanical model to control the top-coal deformation is established in accordance with the structural characters of the gob-side entry surrounding rock for the fully-mechanic top-coal caving; the analytical solution... A mechanical model to control the top-coal deformation is established in accordance with the structural characters of the gob-side entry surrounding rock for the fully-mechanic top-coal caving; the analytical solution of top coal roof-sag curve is deduced with Winkler elastic foundation beam model. By means of a calculating and analytic program, the top coal roof-sag values are calculated under the conditions of different supporting intensities, widths of narrow pillars and stiffness of top coal; meanwhile, the relationship between the roof-sag values and supporting intensity, width of narrow pillars and stiffness of top coal is analyzed as well. With the actual situation of the gob-side entry taken into consideration, the parameters of top-coal control are determined and a supporting plan is proposed for the top-coal control,which is proved to be reliable and effective by on-site verification. Some theoretical guidance and advice are put forward for the top-coal deformation control in gob-side entry for fully mechanized top-coal caving face. 展开更多
关键词 Fully mechanized top-coal caving Narrow pillar Gob-side entry Top coal deformation control
在线阅读 下载PDF
Floor heave characteristics and control technology of the roadway driven in deep inclined-strata 被引量:8
2
作者 Wang Meng Guo Guanlong +2 位作者 Wang Xiangyu Guo Yu Dao Vietdoan 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2015年第2期267-273,共7页
Based on in-mine instrumentation and theoretical analysis of the unsymmetrical large-deformation that occurred in the roadway after excavation,Differential Floor Heave(DFH)was found to be the main reason for roadway f... Based on in-mine instrumentation and theoretical analysis of the unsymmetrical large-deformation that occurred in the roadway after excavation,Differential Floor Heave(DFH)was found to be the main reason for roadway failure.It needs to be pointed out that the specific roadway was driven in inclined rock strata.In addition,the factors that contribute to the occurrence of DFH are discussed in detail.It is believed that DFH is triggered by the unsymmetrical stress distribution in the floor and the different rock types encountered near the two floor corners.Hence,DFH control should be focused on the left floor corner where shearing failure occurs initially and the left floor surface where tensile failure is more severe.The proposed DFH control strategies include unsymmetrical grouting for the whole roadway,re-design of the roof and ribs support,reinforcement of the weak zones,and release of the concentrated stress in the earlier stage.Meanwhile,it is recommended that in the later stage,both bolts and cable bolts with higher strength and the backfilling technique using the coal measure rocks and concrete should be employed in the reversed-arch floor.The field instrumentation results,after using the proposed control strategies,indicate that large deformation in a DFH roadway has been successfully controlled. 展开更多
关键词 Deep roadway Inclined strata Differential Floor Heave (DFH)Unsymmetrical deformation Two stage control strategies
在线阅读 下载PDF
High-resistance controlled yielding supporting technique in deep-well oil shale roadways 被引量:3
3
作者 Yu Yang Bai Jianbiao +3 位作者 Wang Xiangyu Wang Junde Xue Shizhi Xu Ke 《International Journal of Mining Science and Technology》 SCIE EI 2014年第2期229-236,共8页
In order to avoid the deep-well oil shale roadway being deformed, damaged, or difficult to maintain after excavating and supporting in Haishiwan coal mine, this paper has analyzed the characteristics of the deformed r... In order to avoid the deep-well oil shale roadway being deformed, damaged, or difficult to maintain after excavating and supporting in Haishiwan coal mine, this paper has analyzed the characteristics of the deformed roadway and revealed its failure mechanism by taking comprehensively the methods of field geological investigation, displacement monitoring of surrounding rock, rock properties and hydration properties experiments and field application tests. Based on this work, the high-resistance controlled yielding supporting principle is proposed, which is: to "resist" by high pre-tightening force and high stiff- ness in the early stage, to "yield" by making use of the controlled deformation of a yielding tube in the middle stage, and to "fix" by applying total-section Gunite in the later stage. A high-resistance controlled yielding supporting technique of "high pre-tightening force yielding anchor bolt + small-bore pre-tight- ening force anchor cable + rebar ladder beam + rhombic metal mesh + lagging gunite" has been estab- lished, and industrial on site testing implemented. The practical results show that the high-resistance controlled yielding supporting technique can effectively control the large deformation and long-time rheology of deep-well oil shale roadways and can provide beneficial references for the maintenance of other con-generic roadways.Deep-well Oil shale 展开更多
关键词 deformation failure mechanism High-resistance controlled yielding supporting Yielding anchor bolt
在线阅读 下载PDF
Study on gob-side entry retaining in fully-mechanized longwall with top-coal caving and its application 被引量:13
4
作者 Su Hai Bai Jianbiao +2 位作者 Yan Shuai Chen Yong Zhang Zizheng 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2015年第3期503-510,共8页
Based on the engineering background of gob-side entry retaining in fully-mechanized longwall with top coal caving(GER-FLTC) on N2105 working face of Yuwu coal mine, by adopting the methods of theoretical analysis and ... Based on the engineering background of gob-side entry retaining in fully-mechanized longwall with top coal caving(GER-FLTC) on N2105 working face of Yuwu coal mine, by adopting the methods of theoretical analysis and numerical calculation, the control techniques of surrounding rocks in GER-FLTC working face are studied in this paper. The two main difficulties of stability of surrounding rocks at gob-side retained entry in fully-mechanized longwall working face are the stability control of top coal and control of large deformation of GER-FLTC working face. Interaction mechanical model between roofing and roadside backfilling in GER-FLTC is established and the equations for the calculation of roof-cutting resistance of roadside backfilling are derived. Results of numerical calculation show that the damage zones of top coal can be categorized into the delaminating zone of top coal above the backfilling, tensile damage zone of top coal above the retained roadway and shear damage zone of the upper rib of the solid coal. Stability control of top coal is the critical part to success of GER-FLTC. With consideration of large deformation of surrounding rocks of gob-side retained entry in fully-mechanized longwall, the support technique of‘‘roofing control and wall strengthening'' is proposed where high strength and highly prestressed anchor rods and diagonal tensile anchor cables support are used for top coal, high strength and highly prestressed yielding anchor rod support is used for solid coal and roadside prestressed load-carrying backfilling is constructed by high-water material, in order to maintain the integrity of the top coal, transfer load, high resistance yielding load-carrying of solid coal, roof-cutting of roadside backfilling and support,and to achieve GER-FLTC. Results from this study are successfully applied in engineering practice. 展开更多
关键词 Gob-side entry retaining in fully-mechanized longwan with top coal caving Stability control of top coalLarge deformation control Roofing control and wall strengthening