The damage of the self-compacting concrete in CRTSⅢslab ballastless track on bridge will lead to a partial void of the track slab,which will affect the comfort and safety of the train and the durability of the track ...The damage of the self-compacting concrete in CRTSⅢslab ballastless track on bridge will lead to a partial void of the track slab,which will affect the comfort and safety of the train and the durability of the track slab and bridge structure.In order to study the impact of the interface crack on the dynamic response of CRTSⅢballastless track system on bridge,based on the principle of multi-body dynamics theory and ANSYS+SIMPACK co-simulation,the spatial model of vehicle-track-bridge integration considering the longitudinal stiffness of supports,the track structure and interlayer contact characteristics were established.The dynamic characteristics of the system under different conditions of the width,length and position of the interface crack were analysed,and the limited values of the length and width of the cracks at the track slab edge were proposed.The results show that when the self-compacting concrete does not completely void along the transverse direction of the track slab,the crack has little effect on the dynamic characteristics of the vehicle-track-bridge system.However,when the self-compacting concrete is completely hollowed out along the transverse direction of the track slab,the dynamic amplitudes of the system increase.When the crack length is 1.6 m,the wheel load reduction rate reaches 0.769,which exceeds the limit value and threatens the safety of train operation.The vertical acceleration of the track slab increases by 250.1%,which affects the service life of the track system under the train speed of 200 km/h.展开更多
Pile-slab structure roadbed is a new form of ballastless track for high speed railway. Due to lack of corresponding design code, based on the analysis of its structure characteristics and application requirements, it ...Pile-slab structure roadbed is a new form of ballastless track for high speed railway. Due to lack of corresponding design code, based on the analysis of its structure characteristics and application requirements, it is proposed to carry out load effect combination according to ultimate limit state and serviceability limit state, and the most unfavorable combination of each state is chosen to carry through design calculation for pile-slab structure. Space model of pile-slab structure can be simplified as a plane flame model, by using the orthogonal test method, and the design parameter of pile-slab structure is optimized. Moreover, based on the engineering background of Suining-Chongqing high-speed railway, the dynamic deformation characteristics of pile-slab structure roadbed are further researched by carrying on the indoor dynamic model test. The test results show that the settlement after construction of subgrade satisfies the requirement of settlement control to build ballastless track on soil subgrade for high-speed railway. Slab structure plays the role of arch shell as load is transmitted from slab to pile, and the vertical dynamic stress of subgrade soil is approximately of "K" form distribution with the depth. The distribution of pile stress is closely related to soil characteristics, which has an upset triangle shape where the large dynamic stress is at the top. Pile compared with soil shares most dynamic stress. Pile structure expands the depth of the dynamic response of subgrade has limited effect on dynamic response. These results can provide subgrade. and improves the stress of subgrade soil, and the speed of train scientific basis for pile-slab structure roadbed used on soil展开更多
基金Project(2017YFB1201204)supported by National Key R&D Program of China。
文摘The damage of the self-compacting concrete in CRTSⅢslab ballastless track on bridge will lead to a partial void of the track slab,which will affect the comfort and safety of the train and the durability of the track slab and bridge structure.In order to study the impact of the interface crack on the dynamic response of CRTSⅢballastless track system on bridge,based on the principle of multi-body dynamics theory and ANSYS+SIMPACK co-simulation,the spatial model of vehicle-track-bridge integration considering the longitudinal stiffness of supports,the track structure and interlayer contact characteristics were established.The dynamic characteristics of the system under different conditions of the width,length and position of the interface crack were analysed,and the limited values of the length and width of the cracks at the track slab edge were proposed.The results show that when the self-compacting concrete does not completely void along the transverse direction of the track slab,the crack has little effect on the dynamic characteristics of the vehicle-track-bridge system.However,when the self-compacting concrete is completely hollowed out along the transverse direction of the track slab,the dynamic amplitudes of the system increase.When the crack length is 1.6 m,the wheel load reduction rate reaches 0.769,which exceeds the limit value and threatens the safety of train operation.The vertical acceleration of the track slab increases by 250.1%,which affects the service life of the track system under the train speed of 200 km/h.
基金Foundation item: Project(2013CB036405) supported by the National Basic Research Program of China Project(KZZD-EW-05) supported by the Key Research Program of the Chinese Academy of Sciences
文摘Pile-slab structure roadbed is a new form of ballastless track for high speed railway. Due to lack of corresponding design code, based on the analysis of its structure characteristics and application requirements, it is proposed to carry out load effect combination according to ultimate limit state and serviceability limit state, and the most unfavorable combination of each state is chosen to carry through design calculation for pile-slab structure. Space model of pile-slab structure can be simplified as a plane flame model, by using the orthogonal test method, and the design parameter of pile-slab structure is optimized. Moreover, based on the engineering background of Suining-Chongqing high-speed railway, the dynamic deformation characteristics of pile-slab structure roadbed are further researched by carrying on the indoor dynamic model test. The test results show that the settlement after construction of subgrade satisfies the requirement of settlement control to build ballastless track on soil subgrade for high-speed railway. Slab structure plays the role of arch shell as load is transmitted from slab to pile, and the vertical dynamic stress of subgrade soil is approximately of "K" form distribution with the depth. The distribution of pile stress is closely related to soil characteristics, which has an upset triangle shape where the large dynamic stress is at the top. Pile compared with soil shares most dynamic stress. Pile structure expands the depth of the dynamic response of subgrade has limited effect on dynamic response. These results can provide subgrade. and improves the stress of subgrade soil, and the speed of train scientific basis for pile-slab structure roadbed used on soil