Accurate 3-D fracture network model for rock mass in dam foundation is of vital importance for stability,grouting and seepage analysis of dam foundation.With the aim of reducing deviation between fracture network mode...Accurate 3-D fracture network model for rock mass in dam foundation is of vital importance for stability,grouting and seepage analysis of dam foundation.With the aim of reducing deviation between fracture network model and measured data,a 3-D fracture network dynamic modeling method based on error analysis was proposed.Firstly,errors of four fracture volume density estimation methods(proposed by ODA,KULATILAKE,MAULDON,and SONG)and that of four fracture size estimation methods(proposed by EINSTEIN,SONG and TONON)were respectively compared,and the optimal methods were determined.Additionally,error index representing the deviation between fracture network model and measured data was established with integrated use of fractal dimension and relative absolute error(RAE).On this basis,the downhill simplex method was used to build the dynamic modeling method,which takes the minimum of error index as objective function and dynamically adjusts the fracture density and size parameters to correct the error index.Finally,the 3-D fracture network model could be obtained which meets the requirements.The proposed method was applied for 3-D fractures simulation in Miao Wei hydropower project in China for feasibility verification and the error index reduced from 2.618 to 0.337.展开更多
结合东坪金矿南山采区1号空区的工程实际,采用Plaxis 3D Tunnel对其建立三维数值模型,并对其不同开挖顺序的开挖过程进行数值模拟。通过对开采过程中的地压活动规律和围岩稳定性进行分析,论证了地下采空区开挖方案的可行性,揭示了采空...结合东坪金矿南山采区1号空区的工程实际,采用Plaxis 3D Tunnel对其建立三维数值模型,并对其不同开挖顺序的开挖过程进行数值模拟。通过对开采过程中的地压活动规律和围岩稳定性进行分析,论证了地下采空区开挖方案的可行性,揭示了采空区不同开挖阶段应力的集中部位和围岩的潜在破坏部位。计算表明该空区由上向下开挖顺序较为有利,其开挖过程总体可以保持稳定,但也存在不安全隐患。计算结果对该矿山的安全生产具有指导意义。展开更多
基金Project(51321065)supported by the Innovative Research Groups of the National Natural Science Foundation of ChinaProject(2013CB035904)supported by the National Basic Research Program of China(973 Program)Project(51439005)supported by the National Natural Science Foundation of China
文摘Accurate 3-D fracture network model for rock mass in dam foundation is of vital importance for stability,grouting and seepage analysis of dam foundation.With the aim of reducing deviation between fracture network model and measured data,a 3-D fracture network dynamic modeling method based on error analysis was proposed.Firstly,errors of four fracture volume density estimation methods(proposed by ODA,KULATILAKE,MAULDON,and SONG)and that of four fracture size estimation methods(proposed by EINSTEIN,SONG and TONON)were respectively compared,and the optimal methods were determined.Additionally,error index representing the deviation between fracture network model and measured data was established with integrated use of fractal dimension and relative absolute error(RAE).On this basis,the downhill simplex method was used to build the dynamic modeling method,which takes the minimum of error index as objective function and dynamically adjusts the fracture density and size parameters to correct the error index.Finally,the 3-D fracture network model could be obtained which meets the requirements.The proposed method was applied for 3-D fractures simulation in Miao Wei hydropower project in China for feasibility verification and the error index reduced from 2.618 to 0.337.
文摘结合东坪金矿南山采区1号空区的工程实际,采用Plaxis 3D Tunnel对其建立三维数值模型,并对其不同开挖顺序的开挖过程进行数值模拟。通过对开采过程中的地压活动规律和围岩稳定性进行分析,论证了地下采空区开挖方案的可行性,揭示了采空区不同开挖阶段应力的集中部位和围岩的潜在破坏部位。计算表明该空区由上向下开挖顺序较为有利,其开挖过程总体可以保持稳定,但也存在不安全隐患。计算结果对该矿山的安全生产具有指导意义。