期刊文献+
共找到1,340篇文章
< 1 2 67 >
每页显示 20 50 100
Analysis and application in controlling surrounding rock of support reinforced roadway in gob-side entry with fully mechanized mining 被引量:10
1
作者 DENG Yuehua TANG Jianxin +2 位作者 ZHU Xiangke FU Yong DAI Zhangyin 《Mining Science and Technology》 EI CAS 2010年第6期839-845,共7页
In order to optimize gob-side entry in fully-mechanized working face in moderate-thick-coal seams, we adopt a new attempt to pack roadside by pumping ordinary concrete, which is very important for the development of g... In order to optimize gob-side entry in fully-mechanized working face in moderate-thick-coal seams, we adopt a new attempt to pack roadside by pumping ordinary concrete, which is very important for the development of gob-side entry technology. The concrete has a long initial setting time and a low initial strength. So it is difficult to control the surrounding rock. In this paper, we analyze the effect of using roadside cable to reinforce supporting in gob-side entry surrounding rock controlling based on elas-tic-plastic and material mechanics knowledge. And then we propose a scheme that cable is used to reinforce roadside supporting and a single hydraulic prop is used as the temporary supporting in gob side. Using the numerical simulation software FLAC2D, we numerically simulated supporting scheme. Results of both the 2D modeling and the industrial test on No.3117 face in Jingang Mine prove that the scheme is feasible. The results show that the technology of protecting the roadway in gob-entry retained efficiently make up the deficiency of roadside packing with ordinary concrete, effectively control the roof strata and acquire a good result of retaining roadway. 展开更多
关键词 gob-side entry retained surrounding rock controlling cable reinforced roadside supporting FLAC2D single hydraulic prop roadside support pumping of concrete
在线阅读 下载PDF
Stress distribution and surrounding rock control of mining near to the overlying coal pillar in the working face 被引量:8
2
作者 Rui Gao Bin Yu Xiangbin Meng 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2019年第6期881-887,共7页
The occurrence of overlying coal pillar(OCP)exerts a strong effect on the stress and strain distribution of the surrounding rock in the stope.In this paper,the stress distribution characteristics are analyzed via the ... The occurrence of overlying coal pillar(OCP)exerts a strong effect on the stress and strain distribution of the surrounding rock in the stope.In this paper,the stress distribution characteristics are analyzed via the numerical calculation with the account of OCP presence or absence.In addition,this study revealed the joint effect of side pressure relief area of the goaf and stress concentration in OCP on the final stress distribution.Furthermore,the rules of abutment stress distribution affected by three influencing factors,namely horizontal-vertical distances between OCP and working face and buried depth of OCP,are analyzed.The functional model linking the peak stress of surrounding rock with the above influencing factors is developed.The field application of the above results proved that the rib spalling and deformation of a 2.95 m-high and 5.66 m-wide roadway could be efficiently controlled by rationally adjusting working states of the support,and adopting the hydraulic prop coordinated with the p type metal beam and anchor cable to strengthen the surrounding rock of working face and roadway,respectively.The proposed measures are considered appropriate to satisfy the safe operation requirements. 展开更多
关键词 Overlying COAL pillar(OCP) Stress distribution Influencing factors surroundING rock control
在线阅读 下载PDF
Surrounding rock control of gob-side entry driving with narrow coal pillar and roadway side sealing technology in Yangliu Coal Mine 被引量:7
3
作者 Zha Wenhua Shi Hao +1 位作者 Liu San Kang Changhao 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2017年第5期819-823,共5页
Gob-side entry driving can increase coal recovery ratio, and it is implied in many coal mines. Based on geological condition of 10416 working face tailentry in Yangliu Coal Mine, the surrounding rock deformation chara... Gob-side entry driving can increase coal recovery ratio, and it is implied in many coal mines. Based on geological condition of 10416 working face tailentry in Yangliu Coal Mine, the surrounding rock deformation characteristics of gob-side entry driving with narrow coal pillar is analysed, reasonable size of coal pillar and reasonable roadway excavation time after mining are achieved. Surrounding rock control technology and effective roadway side sealing technology are proposed and are taken into field practice. The results showed that a safer and more efficient mining of working face can be achieved. In addition, results of this paper also have important theoretical significance and valuable reference for surrounding rock control technology of gob-side entry driving with narrow coal pillar under special geological condition. 展开更多
关键词 Narrow coal PILLAR Gob-side ENTRY driving surroundING rock control ROADWAY SIDE sealing technology
在线阅读 下载PDF
System dynamics model of the support-surrounding rock system in fully mechanized mining with large mining height face and its application 被引量:7
4
作者 Yuan Yong Tu Shihao +1 位作者 Zhang Xiaogang Li Bo 《International Journal of Mining Science and Technology》 SCIE EI 2013年第6期879-884,共6页
Fully mechanized mining with large mining height(FMMLMH)is widely used in thick coal seam mining face for its higher recovery ratio,especially where the thickness is less than 7.0 m.However,because of the great mining... Fully mechanized mining with large mining height(FMMLMH)is widely used in thick coal seam mining face for its higher recovery ratio,especially where the thickness is less than 7.0 m.However,because of the great mining height and intense rock pressure,the coal wall rib spalling,roof falling and the instability of support occur more likely in FMMLMH working face,and the above three types of disasters interact with each other with complicated relationships.In order to get the relationship between each two of coal wall,roof,floor and support,and reduce the occurrence probability of the three types of disasters,we established the system dynamics(SD)model of the support-surrounding rock system which is composed of"coal wall-roof-floor-support"(CW-R-F-S)in a FMMLMH working face based on the condition of No.15104 working face in Sijiazhuang coal mine.With the software of Vensim,we also simulated the interaction process between each two factors of roof,floor,coal wall and the support.The results show that the SD model of"CW-R-F-S"system can reveal the complicated and interactive relationship clearly between the support and surrounding rock in the FMMLMH working face.By increasing the advancing speed of working face,the support resistance or the length of support guard,or by decreasing the tipto-face distance,the stability of"CW-R-F-S"system will be higher and the happening probability of the disasters such as coal wall rib spalling,roof falling or the instability of support will be lower.These research findings have been testified in field application in No.15104 working face,which can provide a new approach for researching the interaction relationship of support and surrounding rock. 展开更多
关键词 FMMLMH Support-surrounding rock system SD model Disaster control Simulation analysis
在线阅读 下载PDF
Stability mechanism and control of the pumpable supports in longwall recovery room
5
作者 Dong Zhang Jianbiao Bai +8 位作者 Zhijun Tian Zizheng Zhang Yonghong Guo Rui Wang Ying Xu Hao Fu Shuai Yan Min Deng Shuaigang Liu 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2024年第7期957-974,共18页
The load-bearing performance(LBP)of pumpable supports(PPS)is crucial for the stability of longwall pre-driven recovery room(PRR)surrounding rock.However,the unbalanced bearing coefficient(UBC)of the PPS(undertaking un... The load-bearing performance(LBP)of pumpable supports(PPS)is crucial for the stability of longwall pre-driven recovery room(PRR)surrounding rock.However,the unbalanced bearing coefficient(UBC)of the PPS(undertaking unequal load along the mining direction)has not been investigated.A mechanical model of the PRR was established,considering the main roof cantilever beam structure,to derive an assessment formula for the load,the failure criteria,and the UBC of the PPS.Subsequently,the generation mechanisms,and influencing factors of the UBC were revealed.Global sensitivity analysis shows that the main roof hanging length(l_(2))and the spacing between the PPS(r)significantly impact the UBC.A novel design of the PPS and the coupling control technology were proposed and applied to reduce the UBC of the PPS in the adjacent longwall PRR.Monitor results showed no failure of the PPS at the test site,with the UBC(ζ)reduced to 1.1 consistent with the design value(1.15)basically,fully utilizing the collaborative LBP of the PPS.Finally,the maximum roof-to-floor convergence of the PRR was 234 mm,effectively controlling the stability of the surrounding rock of the PRR and ensuring the mining equipment recovery. 展开更多
关键词 Pre-driven recovery room Pumpable supports Unbalanced bearing coefficient Hydraulic fracture Stability analysis surrounding rock control
在线阅读 下载PDF
钻锚一体化锚杆随钻测量岩石强度试验研究
6
作者 姜鹏飞 张炜 +5 位作者 陈志良 王子越 罗超 郭吉昌 刘畅 孙洋 《采矿与岩层控制工程学报》 北大核心 2025年第1期63-81,共19页
岩石单轴抗压强度是评估岩石力学性质的重要参数,实时、准确地获取锚杆钻进过程中的岩石单轴抗压强度对于指导巷道顶板支护设计、锚固作业具有重要意义。基于钻锚一体化锚杆和钻臂搭建了钻锚一体化锚杆随钻感知试验系统,试验系统可实时... 岩石单轴抗压强度是评估岩石力学性质的重要参数,实时、准确地获取锚杆钻进过程中的岩石单轴抗压强度对于指导巷道顶板支护设计、锚固作业具有重要意义。基于钻锚一体化锚杆和钻臂搭建了钻锚一体化锚杆随钻感知试验系统,试验系统可实时监测液压系统的液压缸、液压马达及钻箱位移等参数。通过对各参数特性、单一参数及组合参数随岩石强度变化的关系进行分析,获得钻进单位体积岩石时液压缸、液压马达及系统所做总功与岩石强度的关系,并对比了各参数的优劣性。研究结果表明:液压系统单一参数及组合参数与岩石单轴抗压强度有一定的相关性,部分参数相关性系数较高,液压缸进油端、回油端拟合函数相关性系数分别为0.840 8和0.849 7;钻箱钻进速度随试样单轴抗压强度变化的拟合函数相关性系数最高,为0.953 3;其次是液压马达做功、系统总功以及液压缸做功,分别为0.921 5、0.895 0和0.855 2。液压缸回油端压力拟合函数效果最好,误差率为14.33%,小于15%;其次是钻箱钻进速度,误差率为16.12%,小于20%;钻进系统所做总功、液压马达做功、液压缸做功误差率分别为20.73%、21.79%和23.78%,均小于25%,预测效果较好。液压马达做功系统做功占主要部分,平均占比99.22%,随着岩石强度的增加,液压马达做功占系统总功逐渐下降。总体来看,液压缸进油端压力、回油端压力、钻箱钻进速度、液压马达做功、系统总功及液压缸做功随试样单轴抗压强度变化的拟合函数相关性系数较高。研究结果为钻锚一体化快速掘进、巷道围岩稳定性评估、锚杆支护方案优化等提供了依据。 展开更多
关键词 巷道支护 快速掘进 钻锚一体化 随钻测量 单轴抗压强度
在线阅读 下载PDF
煤矿岩巷TBM快速掘进研究进展与展望
7
作者 严红 吴林 +1 位作者 李桂臣 宋维斌 《煤炭工程》 北大核心 2025年第1期1-7,共7页
基于TBM在岩巷掘进中的显著优势,分析了我国煤矿岩巷TBM发展阶段分类及总体特点,归纳了2015—2024年煤矿岩巷TBM应用特征,包括主要应用省份、岩巷类型、刀盘直径和生产集团;分别从超前探测和预测预报技术、矿井生产地质条件适应性技术... 基于TBM在岩巷掘进中的显著优势,分析了我国煤矿岩巷TBM发展阶段分类及总体特点,归纳了2015—2024年煤矿岩巷TBM应用特征,包括主要应用省份、岩巷类型、刀盘直径和生产集团;分别从超前探测和预测预报技术、矿井生产地质条件适应性技术和巷道围岩稳定性控制技术三个方面分析了煤矿岩巷TBM掘进技术现状;最后从深部岩巷围岩稳定性控制、超前探测和掘进参数、装备构件适应性和快速组装工艺三个方面对煤矿TBM后续研究提出展望,对于煤矿TBM设计和应用具有一定的参考价值。 展开更多
关键词 全断面掘进机(TBM) 岩巷 快速掘进 围岩控制 智能化煤矿
在线阅读 下载PDF
超前巷道裂隙发育规律与锚注加固技术研究
8
作者 龚轩 宋亮亮 《煤炭科技》 2025年第1期42-46,共5页
超前支承压力及其诱发的巷道变形破坏是制约煤矿安全开采的主要问题之一,常规超前支护(单体支柱、支架等)存在劳动强度大、效率低等问题,常难以满足现场需求。为此,采用理论分析、数值模拟、工程应用等方法,开展了综采面超前动压区巷道... 超前支承压力及其诱发的巷道变形破坏是制约煤矿安全开采的主要问题之一,常规超前支护(单体支柱、支架等)存在劳动强度大、效率低等问题,常难以满足现场需求。为此,采用理论分析、数值模拟、工程应用等方法,开展了综采面超前动压区巷道锚注加固技术研究,揭示了不同支承压力下超前巷道裂隙发育规律,分析了巷道锚注加固技术的原理,总结出锚注加固技术的优点,评估了锚注加固技术在超前巷道中的应用可行性,并在平顶山天安煤业股份有限公司四矿综采面超前动压巷道进行了现场工业性试验,研究得到锚注加固技术的应用减少了巷道围岩的变形量,实现了巷道围岩的稳定控制,保障了工作面的安全高效生产,为超前巷道的支护设计提供了借鉴。 展开更多
关键词 巷道支护 超前支护 围岩控制 支承压力 锚注加固
在线阅读 下载PDF
构造应力作用下厚煤层巷道合理掘进层位及围岩控制研究
9
作者 柴亚栋 徐杰 +4 位作者 毕青泉 李小龙 孙鑫 程敬义 刘克臣 《煤》 2025年第1期11-17,共7页
为解决厚煤层在构造应力作用下的支护问题,文章结合下霍煤矿2307工作面的地质条件,分别以沿厚煤层顶板、底板掘进的巷道为主要研究对象,运用数值模拟的方法研究了构造应力场中两类巷道的围岩稳定性。由结果可知,掘进过程中沿顶掘进巷道... 为解决厚煤层在构造应力作用下的支护问题,文章结合下霍煤矿2307工作面的地质条件,分别以沿厚煤层顶板、底板掘进的巷道为主要研究对象,运用数值模拟的方法研究了构造应力场中两类巷道的围岩稳定性。由结果可知,掘进过程中沿顶掘进巷道的变形破坏以底鼓和片帮为主,能有效保持顶板完整度,而沿底掘进巷道的变形破坏以冒顶和片帮为主,可有效保持底板和煤帮完整度;在相同煤柱宽度下,沿底掘进巷道受到的采动影响较小,而在相同埋深下,沿顶掘进巷道受到的采动影响较小,为此类工程场景中合理选取巷道掘进层位和进行支护提供了理论和技术的支持。 展开更多
关键词 构造应力 掘进层位 数值模拟 围岩控制
在线阅读 下载PDF
巷道锚杆-锚索-网喷-钢梁联合协同支护参数优化及应用研究
10
作者 韦建辉 李作泉 +2 位作者 张治璞 何斌飞 张巨峰 《煤》 2025年第3期65-70,共6页
为了更好地控制巷道围岩稳定性,探索巷道加强支护的方法,以甘肃某矿1715运输巷为研究对象,通过构建综合评价指标体系,运用粒子群优化和模拟退火算法联合优化模型,调整支护参数,得出锚杆-锚索-网喷-钢梁联合协同支护对围岩稳定性控制是... 为了更好地控制巷道围岩稳定性,探索巷道加强支护的方法,以甘肃某矿1715运输巷为研究对象,通过构建综合评价指标体系,运用粒子群优化和模拟退火算法联合优化模型,调整支护参数,得出锚杆-锚索-网喷-钢梁联合协同支护对围岩稳定性控制是最有效的途径,并确定了联合协同支护优化的流程,结合1715现场实际情况计算了巷道锚杆-锚索-网喷-钢梁联合协同支护的各参数值,最后采用“十字”布点法观测了巷道收敛变形情况。结果表明,1715运输巷通过实施锚杆-锚索-网喷-钢梁联合协同支护方式,巷道围岩稳定性得到了良好控制,为矿井安全生产提供了保障。 展开更多
关键词 联合支护 协同支护 围岩稳定性 控制方案
在线阅读 下载PDF
大断面强动压影响沿空巷道围岩控制技术研究
11
作者 姚旭 李中伟 《能源与节能》 2025年第1期249-252,共4页
沿空留巷相较于常规留煤柱开挖巷道方式具有较好的技术和经济优势,沿空留巷技术应用过程中巷旁充填体参数设置对巷道稳定性具有重要作用。通过实验室试验方法分析了超高水材料含水率对试件强度的影响规律,进而建立了8107工作面数值模型... 沿空留巷相较于常规留煤柱开挖巷道方式具有较好的技术和经济优势,沿空留巷技术应用过程中巷旁充填体参数设置对巷道稳定性具有重要作用。通过实验室试验方法分析了超高水材料含水率对试件强度的影响规律,进而建立了8107工作面数值模型;通过数值模拟方法分析了不同参数条件下巷旁充填体变形情况,确定选择合理的巷旁充填体参数后,制定了8107工作面回采巷道的最终围岩控制方案。经现场实践检验,巷旁充填体、煤柱帮、顶板、底板的最大变形量分别为223、 205、 168、 40 mm;巷道围岩变形量满足作业规程的相关要求。研究成果可为相似条件下巷道围岩控制提供一定的借鉴。 展开更多
关键词 煤矿 回采工作面 动压巷道 沿空留巷 围岩控制
在线阅读 下载PDF
深埋煤层留底煤开采巷道底鼓显现机理及其防治研究
12
作者 田晓兵 邓辉 +4 位作者 谢福星 史星星 董哲 张怀忠 郑铮 《煤炭工程》 北大核心 2025年第1期60-70,共11页
为探究留设底煤开采工作面内巷道底鼓的发生机理及相应的围岩控制技术,以胡家河煤矿402104轨道平巷为工程背景,通过现场矿压监测、理论计算分析、数值模拟研究和现场工业性试验相结合的方法对其进行了系统的研究,结果表明:留设底煤厚度... 为探究留设底煤开采工作面内巷道底鼓的发生机理及相应的围岩控制技术,以胡家河煤矿402104轨道平巷为工程背景,通过现场矿压监测、理论计算分析、数值模拟研究和现场工业性试验相结合的方法对其进行了系统的研究,结果表明:留设底煤厚度的增加将会导致拱脚位置的水平和垂向偏移量均呈远离巷道的趋势,而留设底煤粘聚力的增加则会导致拱脚位置水平偏移量呈靠近巷道的趋势,垂向偏移量呈远离巷道的趋势;随着拱脚位置逐渐远离巷道,底板内煤岩层发生塑性变形破坏的范围增大,从而导致巷道两帮和底板变形量的增加;通过施打底角斜锚索和锚杆可以控制底煤水平方向运移和其抗剪能力,同时施打底板锚杆或短锚索可以控制底煤垂向方向运移和其强度值。现场工业性试验期间提出了具体的围岩控制方案,围岩整体控制效果较好,整个巷道服务期间其底鼓量最大值不超过0.5 m。 展开更多
关键词 留设底煤 底鼓显现 弹性地基 数值模拟 围岩控制
在线阅读 下载PDF
浅埋极近距离采空区下巷道布置及支护研究
13
作者 白心愿 高登彦 陈建华 《煤炭工程》 北大核心 2025年第1期52-59,共8页
针对浅埋极近距离采空区下长距离巷道掘进支护难题,选取活鸡兔井1-2煤层复合区1-2下205回风巷的掘进为研究对象,采用数值计算、理论分析和工程实践相结合的方法,对极近距离条件下合理的层间距及支护参数的确定进行了分析。研究表明:基于... 针对浅埋极近距离采空区下长距离巷道掘进支护难题,选取活鸡兔井1-2煤层复合区1-2下205回风巷的掘进为研究对象,采用数值计算、理论分析和工程实践相结合的方法,对极近距离条件下合理的层间距及支护参数的确定进行了分析。研究表明:基于FLAC 3D数值模拟对采空区下长距离巷道布置及支护结构进行模拟计算,对比分析了不同煤柱宽度、层间距及支护方式下巷道围岩变形情况及应力分布状态,考虑到安全系数确定巷道内错距为21 m;当层间距较小时,锚杆锚索支护效果差,掘进期间顶板处于拉伸破坏状态,顶板控制难度大,分析得出合理的层间距应大于3 m;现有支护条件下,巷道顶煤厚度为3.5 m时巷道顶底板位移变化较小,且不需要架棚。理论计算得出上分层对底板最大破坏深度为2.02 m,且当巷道顶煤厚度为3.5 m时,支护强度校核满足要求。通过现场工程应用及围岩变形实测,当顶煤厚度为3.5 m时,采用“锚杆-锚索-喷浆”联合支护方式,巷道顶底板位移变化较小,顶板最大下沉量为20 mm,顶板控制效果良好,巷道未发生大范围顶板冒落或帮部片帮现象,验证了巷道布置及支护方案的合理性。 展开更多
关键词 极近距离 浅埋煤层 巷道布置 支护工艺 围岩控制
在线阅读 下载PDF
深部强动压巷道围岩控制技术研究
14
作者 代晓亮 刘发义 +1 位作者 孙建维 赵帅 《陕西煤炭》 2025年第3期52-56,共5页
针对深部巷道在高地应力、强动压影响下发生大变形、难维护的问题,以胡底煤业1105巷围岩控制为例,采用地质资料分析及围岩形态观测、围岩裂隙钻孔窥视、现场试验等方法,分析探讨了深部软岩巷道变形特征及围岩控制对策。研究结果表明,深... 针对深部巷道在高地应力、强动压影响下发生大变形、难维护的问题,以胡底煤业1105巷围岩控制为例,采用地质资料分析及围岩形态观测、围岩裂隙钻孔窥视、现场试验等方法,分析探讨了深部软岩巷道变形特征及围岩控制对策。研究结果表明,深部高地应力、向斜构造应力、超前采动应力、巷道穿层及围岩裂隙发育是导致巷道变形的主要原因。基于1105巷变形特征及机理,提出了“灌浆式钢管混凝土+高强度锚网索喷支护”的强动压巷道主被动联合支护对策,可为类似条件下的深部巷道围岩控制提供参考。 展开更多
关键词 深部巷道 围岩变形 联合支护 围岩控制 软岩巷道
在线阅读 下载PDF
支护弱结构条件下巷道不均匀控制技术研究
15
作者 秦兴林 《煤炭技术》 2025年第3期58-61,共4页
为研究支护弱结构条件下巷道不均匀控制锚杆支护技术,解决软弱厚顶板巷道的围岩稳定控制问题,以沁水煤田东北部乐安煤业集中回风巷为研究对象,运用理论研究和井下观测相结合的方法,提出支护弱结构条件下的不均匀支护技术体系,有效改善... 为研究支护弱结构条件下巷道不均匀控制锚杆支护技术,解决软弱厚顶板巷道的围岩稳定控制问题,以沁水煤田东北部乐安煤业集中回风巷为研究对象,运用理论研究和井下观测相结合的方法,提出支护弱结构条件下的不均匀支护技术体系,有效改善了支护弱结构体的力学性能与局部围岩应力状态;提出采用左旋螺纹钢高性能的杆体、高强度托板的成套锚杆进行支护的方法,并对锚杆、锚固剂、锚索和“三径”参数进行了选型。井下观测结果表明:采用不均匀支护后顶板较稳定,观测站距离掘进头20~30 m时两帮移近量趋于缓和,2#侧面最大移近量100 mm左右,且左帮移近量略大于右帮移近量;观测站距离掘进头25~40 m时顶底板移近量趋于缓和,顶底板相对移近量均值为33 mm,顶板下沉量大于底鼓量;顶板离层变化方面,顶板锚杆锚固区内、外离层值均小于10 mm,岩层下沉量不大且相加值小。实践表明,针对乐安煤矿软弱厚顶板巷道提出的不均匀支护体系及支护方法,有效解决了该矿巷道围岩稳定控制问题的同时,为支护弱结构条件下巷道不均匀控制锚杆支护工作提供参考依据。 展开更多
关键词 支护弱结构 不均匀控制 数据观测 围岩稳定控制
在线阅读 下载PDF
煤矿井下高效综掘及围岩变形趋势的研究
16
作者 冀文军 《能源与节能》 2025年第3期116-118,122,共4页
探讨了煤矿井下高效综掘过程中围岩稳定性的问题,重点关注井下高效掘进控制系统的构建与应用,分析了巷道围岩的变形趋势。针对围岩控制需求,介绍了智能化掘进、支护、安全监测、排水、通风和物流系统等技术的应用。此外,对巷道围岩稳定... 探讨了煤矿井下高效综掘过程中围岩稳定性的问题,重点关注井下高效掘进控制系统的构建与应用,分析了巷道围岩的变形趋势。针对围岩控制需求,介绍了智能化掘进、支护、安全监测、排水、通风和物流系统等技术的应用。此外,对巷道围岩稳定性进行了深入分析,包括围岩材料特性、变形原理、稳定性评估和支护措施优化。通过研究,以期为煤炭开采提供技术支持和安全保障。 展开更多
关键词 掘进控制系统 围岩探测 智能化采矿系统 围岩稳定性
在线阅读 下载PDF
破碎围岩巷道注浆加固支护技术研究与实践
17
作者 张雪峰 《晋控科学技术》 2025年第1期48-50,共3页
破碎围岩巷道是煤矿安全生产的重大隐患之一,而注浆加固是破碎巷道稳定性控制的重要手段。针对山西新景矿煤业有限责任公司15231进风巷变形破坏严重、原支护技术失效的问题,基于破碎围岩巷道变形失稳机理,提出了注浆加固技术,现场实践... 破碎围岩巷道是煤矿安全生产的重大隐患之一,而注浆加固是破碎巷道稳定性控制的重要手段。针对山西新景矿煤业有限责任公司15231进风巷变形破坏严重、原支护技术失效的问题,基于破碎围岩巷道变形失稳机理,提出了注浆加固技术,现场实践结果得出采用该加固支护技术后,提高了巷道破碎岩体的完整性,围岩变形得到有效控制,表明该加固支护技术可有效控制巷道围岩变形,保证矿井安全生产。 展开更多
关键词 破碎围岩 变形破坏 注浆加固 围岩控制
在线阅读 下载PDF
超高软岩水仓联合支护技术优化与应用
18
作者 吕晶 《能源与节能》 2025年第3期4-7,共4页
针对亿欣煤业15#煤层西三盘区水仓围岩遇水膨胀变形、控制困难的问题,通过生产地质调研、底板泥岩矿物成分分析、泥岩崩解特性试验,提出软岩水仓支护对策。现场通过“锚网索梁注喷”联合支护技术有效提高软岩水仓整体性与稳定性,充分发... 针对亿欣煤业15#煤层西三盘区水仓围岩遇水膨胀变形、控制困难的问题,通过生产地质调研、底板泥岩矿物成分分析、泥岩崩解特性试验,提出软岩水仓支护对策。现场通过“锚网索梁注喷”联合支护技术有效提高软岩水仓整体性与稳定性,充分发挥锚网索主动支护性能。矿压监测数据表明,支护完成28d后围岩变形趋于稳定,完全满足现场使用需求。 展开更多
关键词 软岩 围岩控制 联合支护
在线阅读 下载PDF
深部大断面巷道围岩控制技术研究与实践
19
作者 徐磊 《能源与节能》 2025年第2期261-263,267,共4页
针对山西焦煤西山煤电杜儿坪矿73907运输巷存在的围岩变形大、破坏严重问题,现场勘测分析了巷道顶板松动圈范围及变形原因,提出了“锚杆+锚索+钢筋梯子梁+金属网+注浆”的联合支护方案。采用数值模拟软件验证了优化支护方案的有效性,并... 针对山西焦煤西山煤电杜儿坪矿73907运输巷存在的围岩变形大、破坏严重问题,现场勘测分析了巷道顶板松动圈范围及变形原因,提出了“锚杆+锚索+钢筋梯子梁+金属网+注浆”的联合支护方案。采用数值模拟软件验证了优化支护方案的有效性,并应用于现场试验。结果表明,巷道顶板、底板最大变形量分别为35.3、 30.5 mm,左、右帮最大变形量分别为19.6、 17.8 mm,巷道围岩变形得到有效控制。 展开更多
关键词 深部 大断面 围岩控制 现场试验
在线阅读 下载PDF
隧道下穿采空区围岩变形控制研究
20
作者 高志锋 《施工技术(中英文)》 2025年第3期84-88,共5页
采空区由于其特殊的地质结构和力学特性,会对隧道施工和运营安全构成威胁。以襄阳至宜昌高速公路春秋寨隧道为研究对象,通过数值模拟和现场监测相结合的方法,系统研究了隧道下穿采空区时的围岩变形规律及安全控制措施。数值模拟结果表明... 采空区由于其特殊的地质结构和力学特性,会对隧道施工和运营安全构成威胁。以襄阳至宜昌高速公路春秋寨隧道为研究对象,通过数值模拟和现场监测相结合的方法,系统研究了隧道下穿采空区时的围岩变形规律及安全控制措施。数值模拟结果表明,相较于无采空区工况,采空区存在时隧道拱顶沉降有所增大。采空区与隧道的相对位置对围岩变形具有较大影响,采空区平行于隧道时隧道拱顶沉降大于采空区垂直于隧道时,表明采空区平行于隧道时对隧道整体稳定性的影响更显著。隧道拱顶沉降监测结果表明,隧道拱顶沉降在施工初期增长较快,随后逐渐趋于稳定,与数值模拟结果吻合良好。支护结构轴力监测结果表明,钢拱架在施工过程中主要表现为受压状态,隧道拱顶区域钢拱架受力变化最大,左、右拱腰区域钢拱架受力差异与围岩条件和施工工序等相关。 展开更多
关键词 公路 隧道 采空区 围岩 变形 控制
在线阅读 下载PDF
上一页 1 2 67 下一页 到第
使用帮助 返回顶部