Reliability, maintainability and testability (RMT) are important properties of equipment, since they have important influ- ence on operational availability and life cycle costs (LCC). There- fore, weighting and op...Reliability, maintainability and testability (RMT) are important properties of equipment, since they have important influ- ence on operational availability and life cycle costs (LCC). There- fore, weighting and optimizing the three properties are of great significance. A new approach for optimization of RMT parameters is proposed. First of all, the model for the equipment operation pro- cess is established based on the generalized stochastic Petri nets (GSPN) theory. Then, by solving the GSPN model, the quantitative relationship between operational availability and RMT parameters is obtained. Afterwards, taking history data of similar equipment and operation process into consideration, a cost model of design, manufacture and maintenance is developed. Based on operational availability, the cost model and parameters ranges, an optimization model of RMT parameters is built. Finally, the effectiveness and practicability of this approach are validated through an example.展开更多
In order to overcome the shortcoming of the classical Hungarian algorithm that it can only solve the problems where the total cost is the sum of that of each job, an improved Hungarian algorithm is proposed and used t...In order to overcome the shortcoming of the classical Hungarian algorithm that it can only solve the problems where the total cost is the sum of that of each job, an improved Hungarian algorithm is proposed and used to solve the assignment problem of serial-parallel systems. First of all, by replacing parallel jobs with virtual jobs, the proposed algorithm converts the serial-parallel system into a pure serial system, where the classical Hungarian algorithm can be used to generate a temporal assignment plan via optimization. Afterwards, the assignment plan is validated by checking whether the virtual jobs can be realized by real jobs through local searching. If the assignment plan is not valid, the converted system will be adapted by adjusting the parameters of virtual jobs, and then be optimized again. Through iterative searching, the valid optimal assignment plan can eventually be obtained.To evaluate the proposed algorithm, the valid optimal assignment plan is applied to labor allocation of a manufacturing system which is a typical serial-parallel system.展开更多
文摘Reliability, maintainability and testability (RMT) are important properties of equipment, since they have important influ- ence on operational availability and life cycle costs (LCC). There- fore, weighting and optimizing the three properties are of great significance. A new approach for optimization of RMT parameters is proposed. First of all, the model for the equipment operation pro- cess is established based on the generalized stochastic Petri nets (GSPN) theory. Then, by solving the GSPN model, the quantitative relationship between operational availability and RMT parameters is obtained. Afterwards, taking history data of similar equipment and operation process into consideration, a cost model of design, manufacture and maintenance is developed. Based on operational availability, the cost model and parameters ranges, an optimization model of RMT parameters is built. Finally, the effectiveness and practicability of this approach are validated through an example.
文摘In order to overcome the shortcoming of the classical Hungarian algorithm that it can only solve the problems where the total cost is the sum of that of each job, an improved Hungarian algorithm is proposed and used to solve the assignment problem of serial-parallel systems. First of all, by replacing parallel jobs with virtual jobs, the proposed algorithm converts the serial-parallel system into a pure serial system, where the classical Hungarian algorithm can be used to generate a temporal assignment plan via optimization. Afterwards, the assignment plan is validated by checking whether the virtual jobs can be realized by real jobs through local searching. If the assignment plan is not valid, the converted system will be adapted by adjusting the parameters of virtual jobs, and then be optimized again. Through iterative searching, the valid optimal assignment plan can eventually be obtained.To evaluate the proposed algorithm, the valid optimal assignment plan is applied to labor allocation of a manufacturing system which is a typical serial-parallel system.