期刊文献+

基于BIM技术的装配式住宅建筑施工全过程管理研究 被引量:2

Research on the Whole Process Management of Prefabricated Residential Building Construction Based on Building Information Modeling
在线阅读 下载PDF
导出
摘要 文中分析了BIM技术在施工全过程管理的具体应用和管理难点,建立了基于BIM技术的装配式住宅建筑的施工管理方法,以此优化装配式建筑的施工流程,排查施工过程的安全隐患,提升施工企业的施工管理水平。本研究成果可为同类型装配式住宅建筑的施工管理提供参考。 Prefabricated residential buildings have the advantages of fast construction speed and high efficiency,and have been widely used in engineering.BIM technology is of great significance to the construction cost,safety,schedule and fine construction management of prefabrica-ted residential buildings in the construction process,and can improve the economic benefits of construction enterprises.This paper analyzes the specific application and management difficulties of BIM technology in the whole construction process management,and establishes the construc-tion management method of prefabricated residential buildings based on BIM technology,so as to optimize the construction process of prefabri-cated buildings,check the sa fety risks in the construction process,and improve the construction management level of construction enterprises.The research results can provide reference for the construction management of prefabricated residential buildings of the same type.
作者 吴忠奎 Wu Zhongkui(Shangrao City Urban Investment Second Construction Engineering Co.,Ltd.,Shangrao,Jiangxi 334000)
出处 《江西建材》 2024年第6期316-317,320,共3页
关键词 装配式 BIM 施工成本 施工管理 Prefabricated BIM Construction cost Construction management
作者简介 吴忠奎(1989-),男,江西上饶人,本科,工程师,主要研究方向为建筑工程。
  • 相关文献

参考文献8

二级参考文献70

  • 1牛智辉.基于BIM技术的装配式建筑信息化研究[J].中国建筑装饰装修,2023(4):54-56. 被引量:1
  • 2何红,高嘉玮.关于建筑工程绿色施工技术的应用研究[J].地产,2019,0(16):34-34. 被引量:1
  • 3孟宪海,次仁顿珠,赵启.EPC总承包模式与传统模式之比较[J].国际经济合作,2004(11):49-50. 被引量:104
  • 4Athanasios E Chassiakos, A.M.ASCE, and Serafim P. Sakellaropoulos. Time-Cost Optimization of Construction Projects with Generalized Activity Constraints[J]. Journal of Construction Engineering and Management, 2005, 13 l : 1115-1124.
  • 5Mohammad A. Ammar. Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows[J]. Journal of Construction Engineering and Management, 2011, 137: 65-71.
  • 6Mohamed Abdel-Raheem and Ahmed Khalafallah. Using Electimize to Solve the Time-Cost-Tradeoff Problem in Construction Engineering[J] . Computing in Civil Engineering, 2011, 137: 250-257.
  • 7Shannon B. TERRY and Gunnar LUCKO. Algorithm for Time-Cost Tradeoff Analysis in Construction Projects by Aggregating Activity-Level Singularity Functions[A]. Construction Research Congress, 2012, 226-236.
  • 8Jide Sun and Lili Wang. The Interaction between BIM's Promotion and Interest Game under Information Asymmetry[J]. Journal of Industrial and Management Optimization, 2015 (4): 1301-1319.
  • 9裴惠敏.谈建设工程进度款的控制与审核[J].山西建筑,2008,34(36):254-255. 被引量:3
  • 10秦海莲.严格计量程序 确保支付合理[J].山西交通科技,2009(2):80-81. 被引量:2

共引文献119

同被引文献8

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部