摘要 本文研究将BIM技术应用于核电站核岛土建施工全过程,通过该工程BIM技术的实施,将从BIM技术、管理和人才等多个方面满足国家大规模核电建设需要,提供各方面的资源储备,为后续核电站建设的BIM应用提供借鉴。本文通过对BIM钢筋建模插件的开发,能够快速建立不规则的钢筋模型,且能结合现场进行钢筋下料,导出料单;核岛土建施工逻辑复杂,采用BIM技术对复杂节点进行物项交叉密集部位干涉分析,通过施工逻辑分析,对不可实施的节点提出修改与优化;钢结构施工要求精度标准高,结合BIM深化出图,导入设备,提高加工标准,减少误差。 This paper studies the application of BIM technology in the whole process of nuclear island civil construction of nuclear power station,through the implementation of BIM technology of this project,it will meet the needs of national large-scale nuclear power construction from BIM technology,management and talents,and provide resource reserves in all aspects,so as to provide reference for the BIM application of subsequent nuclear power station construction.In this paper,through the development of BIM reinforcement modeling plug-in,it can quickly establish irregular reinforcement model,and can combine with the site for reinforcement cutting,and export material list;the logic of nuclear island civil engineering construction is complex.BIM technology is used to analyze the interference of complex nodes in the cross dense parts of items.Through the construction logic analysis,the modification and optimization of nodes that cannot be implemented are proposed;steel structure construction requires high precision standard,combined with BIM deepening drawing,import equipment,improve processing standard,reduce error.
作者 李亚坤 刘军 李光远 Li Yakun;Liu Jun;Li Guangyuan(China Construction Second Engineering Bureau Co.,Ltd,Beijing 101100,China)
出处 《土木建筑工程信息技术》 2022年第4期103-108,共6页 Journal of Information Technology in Civil Engineering and Architecture
基金 中国建筑股份有限公司资助项目(CSCEC-2017-Z-23) 中国建筑第二工程局有限公司资助项目(CSCEC2B-2017-K-01)。
关键词 BIM技术 核电站 土建施工全过程 钢筋建模 BIM Technology Nuclear Power Plant The Whole Process of Civil Construction Rebar Modeling
作者简介 第一作者:李亚坤(1990-),女,工程师,主要研究方向:土木建造与管理,BIM技术应用与研究。
  • 相关文献

参考文献8

二级参考文献65

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:111
  • 2Eastman C,Teicholz P,Sacks R. BIM handbook[M].New Jersey:John Wiley and Sons,Inc,2010.
  • 3Yang D,Eastman C M. A rule-based subset generation method for product data models[J].Computer-Aided Civil and Infrastructure Engineering,2007,(02):133-148.doi:10.1111/j.1467-8667.2006.00476.x.
  • 4Singh V,Gu N,Wang X. A theoretical framework of a BIMbased multi-disciplinary collaboration platform[J].Automation in Construction,2011,(02):134-144.
  • 5Liu Qiang,Zhang Jianping,Li Ding. Research of building information modeling and model transformation technology based on the IFC[A].2012.
  • 6Zhang Jianping,Hu Zhenzhong. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety prohlems during construction: 1 principles and methodologies[J].Automation in Construction,2011.155-166.
  • 7Hu Zhenzhong,Zhang Jianping. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction:2.development and site trials[J].Automation in Construction,2011.167-180.
  • 8Liang Xiong,Lu Ming,Zhang Jianping. Integration of as-built and as-designed models for positioning control during construction[J].Automation in Construction,2011,(03):234-246.
  • 9李恒,郭红领,黄霆,陈镜源,陈景进.BIM在建设项目中应用模式研究[J].工程管理学报,2010,24(5):525-529. 被引量:159
  • 10陈学锋.核电厂全厂断电事故分析[J].中国核电,2011,4(1):46-51. 被引量:9

共引文献702

同被引文献2

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部