摘要
随着社会的不断发展,钢筋混凝土矩形水池应用市场越来越广泛,因此如何根据实际使用情况设计出最为合适钢筋混凝土矩形水池结构便成了较为重要的问题。只有将钢筋混凝土矩形水池结构设计得较为完美,才能够确保其作用的发挥,并延长其使用寿命,为相关使用企业创造出更多的经济收益。本文以漳浦县污水处理厂一级A扩容提标改造工程为例,从荷载及内力组合、内力计算以及构造措施三个方面对钢筋混凝土矩形水池设计中一些值得注意的问题进行研究分析,为类似工程提供参考。
With the continuous development of society,reinforced concrete rectangular pool is more and more widely used in the market.Therefore,how to design the most appropriate reinforced concrete rectangular pool structure according to the actual use situation has become a more important challenge.Only by designing the reinforced concrete rectangular pool structure perfectly can we ensure its role and prolong its service life,so as to create more economic benefits for relevant users.Taking the first-class A expansion and upgrading project of Zhangpu sewage treatment plant as an example,this paper makes a detailed research and analysis on some noteworthy problems in the design of reinforced concrete rectangular water tank from three aspects:load and internal force combination,internal force calculation and structural measures,so as to provide reference for similar projects.
出处
《住宅产业》
2021年第11期66-68,90,共4页
Housing Industry
关键词
钢筋混凝土
矩形水池
结构设计
问题分析
reinforced concrete
rectangular pool
structural design
problem analysis